bangor-toad

Member
Joined
20 Feb 2009
Messages
672
I was listening to Radio 4 at lunchtime and caught the end of a report about the Thameslink project.

It said that DfT have confirmed they've cancelled the order for new stock, that the 319s and 377s will stay and there's no cascade of units to other areas. Apparently it's because there is/was less than expected growth in the use of the Thameslink services.

I've got no references whatsoever for this other than what I heard. A quick search hasn't brought anything up yet. Can anyone verify this?

Cheers,
Jason
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The 'other areas' that the cascade is supposed to go to are seeing growth well above what the franchise agreements stated (I think 40% in the case of Northern Rail) so the fact of the matter is that new stock needs to be built whether or not it goes to the Thameslink area or not.
 
Joined
30 Dec 2008
Messages
127
Location
London
If they cancel the order for the new stock, they may aswell cancel the whole Thameslink infrastructure program to link up the TL and GN routes, as there will be nowhere near enough dual-voltage stock to operate services on the routes when they are joined through the bores at St. Pancras International.

Frankly they should be looking to place a joint order for both Thameslink and Crossrail stock, deliveries to TL first releasing 319's for GWML and Northern Rail electrification schemes, then onto Crossrail for a further cascade of 319's and 317's from the Great Eastern 'Metro' services.

Plenty 313's and 315's to be available for cascade also, and with suitable refurbishment/overhaul could be very useful for other infill services.

Really there are a lot more things need cutting than transport and the infrastructure for it, but the only things politicians care about (and are the typical vote winners) are Health and Education! Whats the point in healthy educated people if we havn't got the infrastructure to get them where they need to be!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Plenty 313's and 315's to be available for cascade also, and with suitable refurbishment/overhaul could be very useful for other infill services.

How long do you expect the 313s to last? The 507s and 508s with Merseyrail have had a very high standard of refurbishment but they are know suffering from corrison problems and aren't expected to last beyond 2014.
 

Barn

Established Member
Joined
3 Sep 2008
Messages
1,487
I was listening to Radio 4 at lunchtime and caught the end of a report about the Thameslink project.

It said that DfT have confirmed they've cancelled the order for new stock, that the 319s and 377s will stay and there's no cascade of units to other areas. Apparently it's because there is/was less than expected growth in the use of the Thameslink services.

I've got no references whatsoever for this other than what I heard. A quick search hasn't brought anything up yet. Can anyone verify this?

Cheers,
Jason

Presumably this means Southern won't get their 377s 'back'. What would they have used them for?

 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
If they cancel the order for the new stock, they may aswell cancel the whole Thameslink infrastructure program to link up the TL and GN routes, as there will be nowhere near enough dual-voltage stock to operate services on the routes when they are joined through the bores at St. Pancras International.

Frankly they should be looking to place a joint order for both Thameslink and Crossrail stock, deliveries to TL first releasing 319's for GWML and Northern Rail electrification schemes, then onto Crossrail for a further cascade of 319's and 317's from the Great Eastern 'Metro' services.

Plenty 313's and 315's to be available for cascade also, and with suitable refurbishment/overhaul could be very useful for other infill services.

Really there are a lot more things need cutting than transport and the infrastructure for it, but the only things politicians care about (and are the typical vote winners) are Health and Education! Whats the point in healthy educated people if we havn't got the infrastructure to get them where they need to be!

:-x Exactly, now what the $%&* are they going to use :?: I think they might be able to convert the Networkers to dual voltage (some of them used to run on third rail after all). However, they could have used the new Thameslink stock as a template for new suburban stock to replace 313s, 314s, 315s, 455s, 507s and 508s. The planned TOC should be allowed to spend its own money on new stock, otherwise we are stuffed! <(
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I guess our hopes now lie on Franchise renewals between 2011-2014 having large allowances for TOC's to be compensated for buying their own stock or improving their own stations. Either via extensions to cover investment or partial deductions they could make on franchise payments. Really though a radical change in the formula to Toc's keeping 50% or more of revenue above performance targets would motivate them to improve.
 

NR Bloke

New Member
Joined
27 May 2010
Messages
3
It's very simple - The BBC have got it wrong - They have confused the HLOS deferrment (50 odd million) with the Thameslink order c. £1 billion

This is not a guess or a theory - it's a fact
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
It's very simple - The BBC have got it wrong - They have confused the HLOS deferrment (50 odd million) with the Thameslink order c. £1 billion

This is not a guess or a theory - it's a fact

Skip to 35m where they read out the statement they got since recording the segment. Guy being interviewed in the first bits from Modern Railways I think.
 

NR Bloke

New Member
Joined
27 May 2010
Messages
3
Which is the statement the DfT provided to explain the HLOS deferral. The government don't announce £1 billion of funding cuts via a reactive statement to a single radio programme.

If you don't believe me call the DfT and ask them
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
thing is the Southern 313s can surely only last a few more years, then what are they going to do for stock, whilst FFC have their 377s.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
thing is the Southern 313s can surely only last a few more years, then what are they going to do for stock, whilst FFC have their 377s.

Actually FCC as in First Capital Connect!

IF the NXEMUs for the Thameslink and Crossrail have been cancelled and the 319s were here to stay on the Thameslink route, would we still see them refurbished to include air con etc...

Saying that, it would be nice to keep the 377s but they're Southern.
 

Oswyntail

Established Member
Joined
23 May 2009
Messages
4,183
Location
Yorkshire
Odd though it may seem (and may not be relevant if the BBC have got it wrong), but there could be some sense in going ahead with the infrastructure development even if new stock is not available. Then, when the money becomes available, the whole project does not have to start from scratch. [Of course, i would not put it past the DfT to authorise new stock while canceling the infratructure ;)]
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
According to Building magazine their looking at £5bn in cuts to Crossrail including shortening trains from 12 to 10 cars to save money on platforms, cutting the spurs to Maidenhead, Canary Wharf and Abbey Wood, cutting one central London station and finally engineering savings elsewhere.

http://www.thisislondon.co.uk/stand...s-may-be-scrapped-in-pound-5bn-cuts-threat.do

Thats gotta reduce the rolling stock they need to order a tad bit...
 

Daimler

Member
Joined
5 Feb 2009
Messages
1,197
Location
Hertfordshire
According to Building magazine their looking at £5bn in cuts to Crossrail including shortening trains from 12 to 10 cars to save money on platforms, cutting the spurs to Maidenhead, Canary Wharf and Abbey Wood, cutting one central London station and finally engineering savings elsewhere.

http://www.thisislondon.co.uk/stand...s-may-be-scrapped-in-pound-5bn-cuts-threat.do

Thats gotta reduce the rolling stock they need to order a tad bit...

I don't like the sound of this - if the idea of saving money by shortening prospective platform lengths does go ahead, can't you see a future where it'll be necessary to spend a fortune on extending them - especially underground?
 

ChrisCooper

Established Member
Joined
7 Sep 2005
Messages
1,787
Location
Loughborough
I suppose they could cut down the length of the trains which would save money on stock and also platform lengthening on the GE and GW lines, but still build the new stations to 12 car length. As has been said, the cost saving from making new stations shorter would be nothing compared to the cost of lengthening them in the future. Adding further length to existing surface platforms and legthening the trains though wouldn't be that costly in comparison to doing it like that from the start.
Getting rid of Canary Wharf seems a bit silly though considering the amount of work that has already gone into the new station. Even if they terminate their and not run through to Abbey Wood it would be more sensible.
 

b0b

Established Member
Joined
25 Jan 2010
Messages
1,371
If you cancel the Thameslink train order, then would you cancel the ATO part of the infrastructure through the core? That would save money too.

Or is that already canceled anyway?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,916
Location
UK
I do think that axing TCR or Bond Street on Crossrail (but making it easy to go ahead and build them later when the economy improves) might actually not be a bad thing for the short term.

The Central Line will still have a lot of people removed for Crossrail, so those people who still want to go from east or west to central London will be able to use that, without the same level of congestion.

As for the branches, that's again down to whether they cut them for good or simply postpone.

I think postponing certain aspects can be acceptable, given the circumstances, but doing anything drastic would be a disaster.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,294
According to Building magazine their looking at £5bn in cuts to Crossrail including shortening trains from 12 to 10 cars to save money on platforms, cutting the spurs to Maidenhead, Canary Wharf and Abbey Wood, cutting one central London station and finally engineering savings elsewhere.

http://www.thisislondon.co.uk/stand...s-may-be-scrapped-in-pound-5bn-cuts-threat.do

Thats gotta reduce the rolling stock they need to order a tad bit...

There's a lot of crud in that 'building' article, especially about reducing the length of the trains. Crossrail trains have always been described as 10 car, ie 2 x 5 car EMUs in multiple, - the idea is that the station tunnel bores allow for 12 car in future.

Just like the JLE, if you remember the project to alter the PEDs and add the extra cars...
 

A60K

Member
Joined
26 Jun 2008
Messages
1,030
Location
Kilburn
Fairly sure ATO installation is pretty well advanced. I was talking about it to a contractor about a month back.

I didn't think they had done any work 'on the ground' yet on installing ATO on the Thameslink route, only preliminary system speccing - not possibly thinking of the Jubilee line, where the ATO installation work has been regularly closing the line at weekends?


 

tripleseis

Member
Joined
7 Sep 2008
Messages
208
Cutting out Canary Wharf would be barmy! Jubilee Line needs capacity relief, and there's only so much the DLR can take. I'm sure the business leaders in the Docklands area will fight to keep Canary Wharf. If you're going axe a central station, then the one with the least impact would be Bond Street as TCR is actually better located for the West End (it's closer to the theatres, Covent Garden and close enough for Oxford Street shopping. That part of London seriously needs a face lift.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I'm told that the decision to cut extending Thameslink to the ECML destinations was made nearly a year ago but has still not been released to the public.
Im also told that Southern will have to sub lease 3 x 377/2 to FCC from next year.
Apparently this is causing some panic as the import of the 313s is not proving very sucessfull. Ancient London Suburban Stock doesnt take kindly to the relatively high speeds (on dc) encountered even on the Seaford Services!
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I'm told that the decision to cut extending Thameslink to the ECML destinations was made nearly a year ago but has still not been released to the public.
Im also told that Southern will have to sub lease 3 x 377/2 to FCC from next year.

You have got to be having a giraffe!! I'm presuming the extra 442s they've taken on to cover Brighton Expresses will enable them to release the /2s without having to bring in 350s like last year?
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
I didn't think they had done any work 'on the ground' yet on installing ATO on the Thameslink route, only preliminary system speccing - not possibly thinking of the Jubilee line, where the ATO installation work has been regularly closing the line at weekends?
Nope. The contractor was at St Pancras and he said 'we're carrying on with the fit of the ATO gear tonight'. Read into that what you will.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,294
Im also told that Southern will have to sub lease 3 x 377/2 to FCC from next year.

That was stated a while ago - it was in the new SN franchise ITT.

3 units on weekdays only, formed as a 12 car diagram starting and finishing in Brighton. Required between Dec 2011 and September 2013.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
That was stated a while ago - it was in the new SN franchise ITT.

3 units on weekdays only, formed as a 12 car diagram starting and finishing in Brighton. Required between Dec 2011 and September 2013.

Apparently its now Dec 2011 until the end of the franchise.
The real problem is that Southern were supposed to have 5 full refurbished 313 by now wheras there are 2 unrefurbished units in service. Rumour is that there is concern over how suitable the 313s will be for use on the coastway services apparently the noise is quite interesting at 70 mph between Falmer and Lewes.

I understand that there is a real danger that Southern services will have to be cancelled to provide the rolling stock to FCC and that the Southampton/ Bognor to london Bridge services are top of the chopping list.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,294
Apparently its now Dec 2011 until the end of the franchise.
The real problem is that Southern were supposed to have 5 full refurbished 313 by now wheras there are 2 unrefurbished units in service. Rumour is that there is concern over how suitable the 313s will be for use on the coastway services apparently the noise is quite interesting at 70 mph between Falmer and Lewes.

I understand that there is a real danger that Southern services will have to be cancelled to provide the rolling stock to FCC and that the Southampton/ Bognor to london Bridge services are top of the chopping list.

I don't quite see the relevance of a shortage of 313s now, to something that is not required for 18 months, to be honest. The shift of more 377s onto Metro services is dependent on platform lengthening in South London as well - that's not due for completion until 2013, and far more likely to be delayed as it's down to Network Rail...
 