One of the aspects of the Thameslink programme that has been difficult to track down before now has been which station pairs would be newly connected once the planned north and south routes and frequencies were 'joined in the middle, IYSWIM.
My source is Table 5.2 in the newly published London and SE RUS final version. The actual table in the RUS gives more detailed info about routes and stopping patterns, ie fast, semifast or stopping etc
Each station pair I've listed gets 2 tph; except Brighton - Bedford which is
4tph as now:
The 18 tph through London Bridge
Brighton - Bedford 12-car (4 tph)
Three Bridges - Peterborough 12-car
Horsham - Cambridge 12-car
East Grinstead - Bedford 12-car Peak only
Caterham - St Albans 8-car
Tattenham Corner - Welwyn Garden City 8-car
Tunbridge Wells - Bedford 12-car Peak only
Ashford International -Luton 12-car Peak only
6tph via Catford & Elephant and Castle
Maidstone East - Welwyn Garden City 8-car
Sevenoaks - Luton 8-car
Bellingham - St Albans 8-car
My source is Table 5.2 in the newly published London and SE RUS final version. The actual table in the RUS gives more detailed info about routes and stopping patterns, ie fast, semifast or stopping etc
Each station pair I've listed gets 2 tph; except Brighton - Bedford which is
4tph as now:
The 18 tph through London Bridge
Brighton - Bedford 12-car (4 tph)
Three Bridges - Peterborough 12-car
Horsham - Cambridge 12-car
East Grinstead - Bedford 12-car Peak only
Caterham - St Albans 8-car
Tattenham Corner - Welwyn Garden City 8-car
Tunbridge Wells - Bedford 12-car Peak only
Ashford International -Luton 12-car Peak only
6tph via Catford & Elephant and Castle
Maidstone East - Welwyn Garden City 8-car
Sevenoaks - Luton 8-car
Bellingham - St Albans 8-car