Returning on this train tonight:
http://www.realtimetrains.co.uk/train/X47770/2013/07/06/advanced - 1807 Brighton to Bedford
... the ride seemed to go smoothly until West Hampstead, when instead of moving onto the fast as normal Beford services do, the train stuck to the slow and eventually caught up with the stopper that was 9 mins ahead out of St Pancras. The train crawled alongside the M1, not topping about 30 I would guess well into St Albans.
On departing the train, I noticed another Bedford train pulling in (about 3 mins later) formed of 2x377s, which according to RTT is a service from Sutton, which went on the fast line.
Looking at RTT, it seems as if this was on purpose, but why? Surely there is no excuse for a 30 min STP-STA, with the normal 17/18 mins, and why are the trains being flighted so closely without appropriate stopping patterns? Any thoughts?
BTW, What is the point of the Thameslink programme, fair enough the extra carriages and the London Bridge flyovers, but who needs to get from Welwyn GC to Orpington? Any disruption on the route will surely bring down the entire former NSE area! It's not as if the current Great Northern service patterns are dreadful, and the current Thameslink routes definitely work!
http://www.realtimetrains.co.uk/train/X47770/2013/07/06/advanced - 1807 Brighton to Bedford
... the ride seemed to go smoothly until West Hampstead, when instead of moving onto the fast as normal Beford services do, the train stuck to the slow and eventually caught up with the stopper that was 9 mins ahead out of St Pancras. The train crawled alongside the M1, not topping about 30 I would guess well into St Albans.
On departing the train, I noticed another Bedford train pulling in (about 3 mins later) formed of 2x377s, which according to RTT is a service from Sutton, which went on the fast line.
Looking at RTT, it seems as if this was on purpose, but why? Surely there is no excuse for a 30 min STP-STA, with the normal 17/18 mins, and why are the trains being flighted so closely without appropriate stopping patterns? Any thoughts?
BTW, What is the point of the Thameslink programme, fair enough the extra carriages and the London Bridge flyovers, but who needs to get from Welwyn GC to Orpington? Any disruption on the route will surely bring down the entire former NSE area! It's not as if the current Great Northern service patterns are dreadful, and the current Thameslink routes definitely work!