• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink disruption - 6th Oct

Status
Not open for further replies.

FlippyFF

Member
Joined
5 Jan 2014
Messages
240
Location
Ashford, Kent
http://www.thameslinkrailway.com/your-journey/live-travel-info/

Major disruption to Thameslink services expected until 02:00 on Wednesday 7 October

Emergency engineering work to protect the reliability of overhead power lines in central London is taking place between London St Pancras International and London Blackfriars.

Can anyone provide more information? I believe there were to be engineering work tonight related to this.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
Various other local operators were warned this afternoon that this could be brought forward, and thus it was so. The Core seems to have been closed Southbound from around 1655 and Northbound a little after that. I can't get more details right now other than that Thameslink have declared CSL2 Code Black (ie. the most severe disruption level) and tickets are accepted left, right and centre on a number of routes.

Given the timing of when services will resume, I can only presume that stress on some key component or system reached a level where it was unsafe, but that the work to repair this would only take a relatively small amount more time to complete now as it would later on. Hopefully the time of normal services resuming has been designed to take into account any availability of engineers and equipment earlier in the evening.

EDIT: Latest news that I have just found is that it looks like trains will be amended up to and until at least the time when 2W82 07/10/2015 0010 ex Brighton reaches London Blackfriars (in reality around 0130ish), where it will likely terminate.
--- old post above --- --- new post below ---
More info: Disruption is now expected until 0600 tomorrow (Weds 7th).
 
Last edited:

causton

Established Member
Joined
4 Aug 2010
Messages
5,504
Location
Somewhere between WY372 and MV7
Thameslink are being their usual self with lots of information (that was slight sarcasm) as there is absolutely nothing on TyrellCheck/JourneyCheck to say what the actual problem is!
 

racyrich

Member
Joined
25 Jan 2014
Messages
234
'Emergency engineering work to protect the reliability of overhead power lines'

Hahahaha. Why does something reliable need emergency fixing? Perhaps replace 'protect' with 'restore'.
 
Status
Not open for further replies.

Top