The current closure of the Thameslink core and disruption to services because of flooding at Farringdon got me thinking about what might happen in similar circumstances post 2018 when the Great Northern services go through the core.
Today we've seen 6tph running northbound from St Pancras. If this happened after 2018 I assume it'd still only be possible to turn 6tph at St Pancras low level so would that end up being 3 trains on Thameslink and 3 on the GN side?
Will provision been made in the plans to turn a significant number of trains at, for example, Finsbury Park and West Hampstead at times of disruption. Presumably it won't be possible to run all the GN services through to Kings Cross and turn them there.
The Thameslink programme brings great benefits to rail travel but I do hope there is sufficient contingency built in so that significant disruption to the core allows a reasonable service to continue running on both northern 'branches' and to southbound destinations.
Today we've seen 6tph running northbound from St Pancras. If this happened after 2018 I assume it'd still only be possible to turn 6tph at St Pancras low level so would that end up being 3 trains on Thameslink and 3 on the GN side?
Will provision been made in the plans to turn a significant number of trains at, for example, Finsbury Park and West Hampstead at times of disruption. Presumably it won't be possible to run all the GN services through to Kings Cross and turn them there.
The Thameslink programme brings great benefits to rail travel but I do hope there is sufficient contingency built in so that significant disruption to the core allows a reasonable service to continue running on both northern 'branches' and to southbound destinations.