Is the new Thameslink vinyl that thick?
![]()
Once they've gone through all the latest versions of the logo, it adds up!
Is the new Thameslink vinyl that thick?
![]()
Have noticed a few coping stones have been "shaved" down at various stations and Dormans has had new ones installed on the down platform. Im guessing for Class 700 clearance
The work at Dormans was so Flying Scotsman could get through to the Bluebell without having to cut bits off it.
all that work for a kettle looooooooool
maybe that was why other stations were done then... maybe nothing to do with the 700s at all.
Since the SDO is automatic in normal running and operates based on the train's knowledge of where it is, it will open the exact number of doors it knows it is allowed to open. As far as I'm aware, it does not possess the capability to open "half a carriage", since the number of doors that are permissibly opened is determined by Network Rail who have never accounted for this possibility. In your example, as long as the infrastructure is correctly set up then 10 cars will open, with the remaining 2 closed.Secondly, how precisely can the Selective Door Operation (SDO) be configured for each station, for example, if the platform was long enough for 10 whole cars, plus one door, is that how the SDO could be set up for that platform, or is it just possible to shut the rear four cars of a 12 car 700?
A couple of questions: is there any source online of the post 21/05 class 700 Diagrams?
Secondly, how precisely can the Selective Door Operation (SDO) be configured for each station, for example, if the platform was long enough for 10 whole cars, plus one door, is that how the SDO could be set up for that platform, or is it just possible to shut the rear four cars of a 12 car 700?
Apologies if this has been posted before, I did a search of this very long thread. It might be me, but I struggle to find specifics with even the advanced search function just returning more or less every thread...

Since the SDO is automatic in normal running and operates based on the train's knowledge of where it is, it will open the exact number of doors it knows it is allowed to open. As far as I'm aware, it does not possess the capability to open "half a carriage", since the number of doors that are permissibly opened is determined by Network Rail who have never accounted for this possibility. In your example, as long as the infrastructure is correctly set up then 10 cars will open, with the remaining 2 closed.

Since the SDO is automatic in normal running and operates based on the train's knowledge of where it is, it will open the exact number of doors it knows it is allowed to open. As far as I'm aware, it does not possess the capability to open "half a carriage", since the number of doors that are permissibly opened is determined by Network Rail who have never accounted for this possibility. In your example, as long as the infrastructure is correctly set up then 10 cars will open, with the remaining 2 closed.
Have been advised Saturday that on Saturday there will be 8 car 700 route refreshing between Brighton and Lewes and Haywards Heath under the 5Z31/5Z32 TL paths
On monday there are STP paths also expected to run
Can anyone confirm whether these are planned to run?
I have been told they will but just double checking to avoid missing it if they do. Thanks
Paths start from Brighton Down Siding on saturday morning to Haywards Heath via lewes.
Are the class 319 trains still running on the Sutton Loop? I want to catch one from Streatham this Saturday.
Are the class 319 trains still running on the Sutton Loop? I want to catch one from Streatham this Saturday.
As of yesterday, there appeared to be 14 diagrams covered by 2x319s
All the non-700 diagrams are held all day, ie no splitting and joining. I assume this makes them 700-ready. Also it sees the end of 4 car running, including the famous 1756 stopper off St Pancras, which is now 8.
I noticed something while being stuck on the 700 today. Every time we were waiting at signal there was no air circulation. When we started moving again you could feel cold air coming through the gaps in 1st class partition wall (I was on the peasant class side). Is it me or did the geniuses at Siemens got the A/C vent placement slightly wrong?
I have to say the AC on the 700s seems anaemic to say the least (at least in standard class), which is surprising for a Desiro. I put it down to cost cutting. It can get rather warm in peak with a full train load.The plot thickens, I was on a stopping service which as always operates standard class only setup and therefore got myself a seat in the "check your privilege" compartment. Now either I'm hallucinating (not) or did Siemens really design 1st class to have nice cool A/C which is on all the time and the rest of the train is somehow dialled down to ridiculous levels. It's so bad you can cut freaking air with a knife in standard peasant cattle class when the train isn't moving. In 319's one could at least open a window but in these plastic nightmares there isn't such modern facility. So was it Siemens or is Govia cutting corners everywhere as they always do (except for their logo and the vinyl used to wrap the trains, ah and the paint they use to make the handrails nice and shiny on all stations - because what I want from a freaking TOC is for them to provide nice shiny handrails)?
700s can open half a coach's worth of doors as part of the SDO system. At least one side of the island platform at Tulse Hill is or was SDO 6.5 at one point.