• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink/ Class 700 Progress

Status
Not open for further replies.

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
Indeed. I don't think the average passenger cares either way, but there's definitely been a cost to change the logo and everything that goes with it - either now or in the future when the 700s will have all the branding inside and out changed. Unnecessarily IMO.

If the 700s had introduced the new logo and the old trains had the old logo until they went, I could have understood the logic of a new logo (just). These are, after all, the trains we've been patiently waiting for - unlike the temporary (and in use for longer than originally intended) 377/387s.

I've got to agree, oh the paradox, the brand new and still being delivered trains get the old logo, the older trains that are getting replaced get the new logo.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
The logo designer isn't relevant. The designer does a logo and gets paid. While some agencies may do the whole lot for you - logo design and implementing the changes - I suspect GTR is doing the logo stuff itself. Adding it to posters as and when, and planning at some stage to introduce the new logo elsewhere.

I guess by December 2018, the logo will be fully in place. But you'd then wonder why they showed the logo off now, and started using it online, before the whole Thameslink project was finished.

Anyway, it is what it is. The point remains though; did GTR need to change the logo and create an additional headache for a contract that hasn't exactly worked out well for them?

And on the same basis, will Great Northern also get a new logo soon?
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Indeed they are and here they are. I won't be posting 12 car diagrams after this for awhile as they are pretty settled unless something changes.

13x RLU & 11x FLU

TB401
5W78 03+38 Three Bridge Depot to Three Bridges
1W78 03.46 Three Bridges to Bedford
1V83 06.14 Bedford to Sutton via Wimbledon
2V12 08.08 Sutton to St Albans via Mitcham
5K37 09+31 St Albans to St Albans via Center Siding
2O37 09.44 St Albans to Sutton via Mitcham Junction
2O38 11.07 Sutton to Luton via Wimbledon
2V67 13.14 Luton to Sutton via Wimbledon
2V68 15.08 Sutton to St Albans via Mitcham
5K93 16+29 St Albans to St Albans via Center Siding
2O93 16.44 St Albans to Sutton via Mitcham
2O94 18.11 Sutton to Luton via Wimbledon
2V41 20.20 Luton to Sutton via Wimbledon
5O48 22+12 Sutton to Streatham via Mitcham
5O48 22+31 Streatham to Sutton via Mitcham
2O48 22.47 Sutton to St Bedford via Wimbledon
5G48 01+10 Bedford to Bedford CS

TB402
5W01 05+20 Down Yard to Brighton
1W04 05.44 Brighton to Bedford
1W17 08.40 Bedford to Brighton
1W28 11.35 Brighton to Bedford
2W45 14.24 Bedford to Three Bridges
2W52 17.05 Three Bridges to Bedford
1W61 19.40 Bedford to Brighton
5W62 22+22 Brighton to Three Bridges Depot

TB403
5W86 02+04 Three Bridges Depot to Three Bridges
2W86 02.16 Three Bridges to Bedford
5G86 03.31 Bedford to Bedford CS
5G87 06+20 Bedford CS to Bedford
1H87 06.34 Bedford to Beckenham Junction
1G63 08.02 Beckenham Junction to Bedford
2W27 09.54 Bedford to Three Bridges
2W36 12.29 Three Bridges to Bedford
1W43 15.10 Bedford to Brighton
1W54 18.05 Brighton to Bedford
1W67 21.10 Bedford to Brighton
2W82 00.10 Brighton to Bedford
5G82 03+12 Bedford to Bedford CS

TB404
5G85 00+28 Bedford CS to Bedford
2W85 00.40 Bedford to Three Bridges
2W88 03.16 Three Bridges to Bedford
1O09 05.48 Bedford to Sutton via Mitcham
1O10 07.40 Sutton to Bedford via Wimbledon
5G29 09+52 Bedford to Bedford via North End Siding
2W29 10.24 Bedford to Three Bridges
2W38 12.59 Three Bridges to Bedford
1H66 15.40 Bedford to Beckenham Junction
1G79 17.30 Beckenham Junction to Bedford
5G79 19+10 Bedford to Bedford CS via North End Siding
5G83 23+24 Bedford CS to Bedford
2W83 23.40 Bedford to Three Bridges
5W83 02+10 Three Bridges to Three Bridges Depot

TB405
5G77 02+08 Bedford CS to Bedford
1W77 02.20 Bedford to Three Bridges
2W92 04.50 Three Bridge to Bedford
1E64 07.16 Bedford to Sevenoaks
2E75 09.42 Sevenoaks to Kentish Town
5J75 11+11 Kentish Town to Cricklewood Depot
5A33 11+42 Cricklewood Depot to West Hampstead
2E33 11.50 West Hampstead to Sevenoaks
2E51 13.30 Sevenoaks to West Hampstead
5J51 14+57 West Hampstead to Cricklewood Depot
5J47 15+13 Cricklewood Depot to West Hampstead
2E47 15.20 West Hampstead to Sevenoaks
1E98 17.00 Sevenoaks to Bedford
5G98 19+24 Bedford to Bedford CS

TB406
5H91 05+52 Bedford CS to Luton
2E91 06.42 Luton to Bromley South
1E65 08.18 Bromley South to Bedford
5G65 10+13 Bedford to Bedford CS
5G07 16+21 Bedford CS to Bedford via North End Siding
1E07 16.56 Bedford to Sevenoaks
2E75 19.30 Sevenoaks to West Hampstead
5J75 20+57 West Hampstead to Cricklewood South Sidings

TB407
5H19 06+58 Cricklewood South Sidings to Luton
2E19 07.46 Luton to Sevenoaks
5E19 09+48 Sevenoaks to Sevenoaks CHS
5Z11 10+05 Sevenoaks CHS to Kentish Town
5Z12 11+38 Kentish Town to Sevenoaks CHS
5Z13 13+37 Sevenoaks CHS to Blackfriars
5Z14 14+58 Blackfriars to Sevenoaks CHS
5E63 16+25 Sevenoaks CHS to Sevenoaks
2E63 16.30 Sevenoaks to Bedford
2O35 19.14 Bedford to Sutton via Mitcham Junction
2O36 21.17 Sutton to Bedford via Wimbledon
5G36 Bedford to Bedford CS via North End Siding

TB408
5G90 07+00 Bedford CS to Bedford
1H91 07.12 Bedford to Beckenham Junction
1G84 08.41 Beckenham Junction to Bedford
1J99 10.20 Bedford to Elephant & Castle
5E99 11+32 Elephant & Castle to Bellingham Sidings
3E73 16+00 Bellingham Sidings to Elephant & Castle
1G73 16.22 Elephant & Castle to Bedford
5G25 17+40 Bedford to Bedford via North End Siding
2V25 17.54 Bedford to Sutton via Wimbledon
2V26 20.12 Sutton to Bedford via Mitcham Junction
1W73 22.22 Bedford to Brighton
5W73 01+14 Brighton to Brighton Down Yard

TB409
5A05 05+42 Cricklewood Sidings to West Hampstead
2E05 05.50 West Hampstead to Sevenoaks
2E65 07.36 Sevenoaks to Kentish Town
5J65 09+10 Kentish Town to Cricklewood Sidings
5A43 14+10 Cricklewood Sidings to West Hampstead
2E43 14.20 West Hampstead to Sevenoaks
2E61 16.00 Sevenoaks to St Albans
5K21 17+53 St Albans to St Albans via Center Siding
2V21 18.06 St Albans to Sutton
2V22 19.42 Sutton to St Albans
5J22 21+01 St Albans to Cricklewood Sidings

TB410
5G95 07+32 Bedford CS to Bedford
1V95 07.44 Bedford to Sutton via Wimbledon
2V24 09.38 Sutton to St Albans via Mitcham Junction
5K49 10+59 St Albans to St Albans via Center Siding
2O49 11.14 St Albans to Sutton via Mitcham Junction
2O50 12.37 Sutton to Luton via Wimbledon
2V79 14.44 Luton to Sutton via Wimbledon
1V80 16.38 Sutton to Bedford via Mitcham Junction
2V29 18.36 Bedford to Sutton via Wimbledon
2V30 20.42 Sutton to St Albans via Mitcham Junction
5J30 22+01 St Albans to Cricklewood South Sidings via Center Siding

TB411
5H09 04+54 Cricklewood Sidings to Luton
2E09 06.04 Luton to Sevenoaks
1E67 08.24 Sevenoaks to Bedford
5G62 09+31 Bedford to Bedford CS
5G03 15+35 Bedford CS to Bedford
1E03 15.54 Bedford to Sevenoaks
1E67 18.30 Sevenoaks to Bedford
5G67 21+02 Bedford to Bedford CS

TB412
5J94 02+51 Bedford CS to Cricklewood Sidings
5O00 05+12 Cricklewood Sidings to Sutton
2O00 06.04 Sutton to Luton
2E21 08.20 Luton to Sevenoaks
1E71 10.30 Sevenoaks to Bedford
5G35 12+52 Bedford to Bedford CS
3J73 14+02 Bedford CS to Bellingham Sidings
3E77 17+00 Bellingham Sidings to Elephant & Castle
1G77 17.22 Elephant & Castle to Bedford
2W63 18.54 Bedford to Brighton
1W70 22.05 Brighton to Bedford
5J70 00+52 Bedford to Cricklewood Sidings

TB413
5A03 05+26 Cricklewood South Sidings to West Hampstead
2O03 05.36 West Hampstead to Sutton
2O04 06.40 Sutton to Bedford
1W19 09.10 Bedford to Brighton
1W30 12.05 Brighton to Bedford
2W47 14.54 Bedford to Three Bridges
2W54 17.37 Three Bridges to Bedford
1W63 20.10 Bedford to Brighton
2W78 23.05 Brighton to Bedford
5G78 02+00 Bedford to Bedford CS

TB501
5Y91 02+14 Jowett Sidings to Bedford
2W91 02.40 Bedford to Brighton
1B00 05.47 Brighton to London Bridge
1B05 07.12 London Bridge to Brighton
1B10 08.27 Brighton to London Bridge
1B15 09.42 London Bridge to Brighton
1B22 11.02 Brighton to London Bridge
1B25 12.12 London Bridge to Brighton
5B25 13+29 Brighton to Down Yard
5B38 14+42 Down Yard to Brighton
1B38 15.02 Brighton to London Bridge
1B41 16.12 London Bridge to Brighton
1B48 17.32 Brighton to London Bridge
1B51 18.42 London Bridge to Brighton
5W51 20+06 Brighton to Three Bridges Depot

TB502
5W93 05+10 Three Bridges Depot to Three Bridges
2W94 05.20 Three Bridges to Bedford
1W13 07.34 Bedford to Brighton
1W24 10.35 Brighton to Bedford
2W41 13.24 Bedford to Three Bridges
1W92 15.59 Three Bridges to Bedford
2W61 18.24 Bedford to Three Bridges
2W66 20.43 Three Bridges to Bedford
5Y68 23+00 Bedford to Jowett Sidings

TB503
5Y11 06+32 Jowett Sidings to Bedford
1W11 06.58 Bedford to Three Bridges
2W22 09.11 Three Bridges to Bedford
1W29 11.40 Bedford to Brighton
1W40 14.35 Brighton to Bedford
2W57 17.20 Bedford to Three Bridges
2W62 19.43 Three Bridges to Bedford
5U62 22+00 Bedford to Cauldwell Depot

TB504
5W02 05+07 Brighton Down Yard to Brighton
1W02 05.30 Brighton to Bedford
2W21 08.24 Bedford to Three Bridges
2W30 10.59 Three Bridges to Bedford
1W37 13.40 Bedford to Brighton
1W96 16.35 Brighton to Bedford
5Y96 19+03 Bedford to Jowett Sidings

TB505
2W84 01.16 Three Bridges to Bedford
5Y84 03+46 Bedford to Bedford via Jowett Sidings
1W01 04.16 Bedford to Brighton
1W82 07.22 Brighton to Bedford
1W23 10.10 Bedford to Brighton
1W34 13.05 Brighton to Bedford
1W45 15.50 Bedford to Brighton
1W56 18.35 Brighton to Bedford
5Y69 21+14 Bedford to Bedford via Bedford St Johns Goods Loop
1W69 21.40 Bedford to Brighton
5W69 00+25 Brighton to Brighton Down Yard

TB506
5W06 05+10 Three Bridges Depot to Brighton
1W06 06.06 Brighton to Bedford
2W23 08.54 Bedford to Three Bridges
2W32 11.29 Three Bridges to Bedford
1W39 14.10 Bedford to Brighton
1W80 17.01 Brighton to Bedford
5Y80 19+33 Bedford to Jowett

TB507
5Y93 07+04 Jowett to Bedford
1W93 07.30 Bedford to Brighton
1W22 10.05 Brighton to Bedford
2W39 12.54 Bedford to Three Bridges
5W48 15+09 Three Bridges to Three Bridges via Depot
2W48 15.29 Three Bridges to Bedford
2W59 18.00 Bedford to Gatwick
2W64 20.18 Gatwick to Bedford
2W79 22.40 Bedford to Three Bridges

TB508
5G85 05+46 Cauldwell Depot to Bedford
1W85 06.18 Bedford to Brighton
1W18 09.05 Brighton to Bedford
2W35 11.54 Bedford to Three Bridges
2W44 14.29 Three Bridges to Bedford
1W51 17.08 Bedford to Brighton
1W62 20.03 Brighton to Bedford
2W81 23.10 Bedford to Three Bridges
5W81 01+36 Three Bridges to Three Bridges Depot

TB509
5Y19 07+22 Jowett Sidings to Bedford
2W19 07.48 Bedford to Gatwick Airport
2W26 10.08 Gatwick Airport to Bedford
1W33 12.40 Bedford to Brighton
1W90 15.35 Brighton to Bedford
1W55 18.10 Bedford to Brighton
1W66 21.05 Brighton to Bedford
5Y66 23+50 Bedford to Jowett Sidings

TB510
5Y02 03+15 Jowett Sidings to Bedford
2W03 03.40 Bedford to Brighton
1W80 06.57 Brighton to Bedford
1W21 09.40 Bedford to Brighton
1W32 12.35 Brighton to Bedford
2W49 15.24 Bedford to Three Bridges
1W84 18.07 Three Bridges to Bedford
1W65 20.40 Bedford to Brighton
2W80 23.37 Brighton to Bedford
5Y80 02+44 Bedford to Jowett Sidings

TB511
5Y87 01+08 Jowett Sidings to Bedford
2W87 01.40 Bedford to Three Bridges
2W90 04.16 Three Bridges to Bedford
1W89 06.54 Bedford to Brighton
1W20 09.35 Brighton to Bedford
5Y35 12+16 Bedford to Bedford via Jowett Sidings
1W35 13.10 Bedford to Brighton
1W94 16.02 Brighton to Bedford
1W57 18.40 Bedford to Brighton
1W68 21.33 Brighton to Bedford
5Y69 00+18 Bedford to Jowett Sidings

Many thanks for posting the diagrams.

On another point, could you please explain RLU and FLU, as they are acronyms and are not supposed to be used without first saying what they mean?
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
In other words, they've stuffed the contract, but can afford to pay for full page spreads in national newspapers. :roll:

There's only one poster with an attitude problem on this thread.
I suggest you calm down, it's not good for your blood pressure.

GTR didn't sign the contract, FCC did, GTR had to agree to whatever the terms are so its a fact that GTR didn't suffer the contract. Im having a hard time working out why people seem to have the knifes out for GTR over a FCC/DfT contract. The current logos on the units were done outside the contract by Siemens.

Seems this forum cannot be objective or allow the facts when it doesn't suit personal feeling (regardless of whether those feeling are valid or not). And I bet this is seen as supporting GTR when its simply pointing out this forums ability to change the truth to suit its own desires. And yes it annoys me that people on here continue to post complete crap then get arsey when they are shown to be wrong.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I've got to agree, oh the paradox, the brand new and still being delivered trains get the old logo, the older trains that are getting replaced get the new logo.

Where the paradox?

700 viyals order in 2014.

377/5 new viyals order in 2015 (and not actually arrived in time for the first unit either)

Hence the different.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,729
Location
Central Belt
GTR didn't sign the contract, FCC did, GTR had to agree to whatever the terms are so its a fact that GTR didn't suffer the contract. Im having a hard time working out why people seem to have the knifes out for GTR over a FCC/DfT contract. The current logos on the units were done outside the contract by Siemens.

Seems this forum cannot be objective or allow the facts when it doesn't suit personal feeling (regardless of whether those feeling are valid or not). And I bet this is seen as supporting GTR when its simply pointing out this forums ability to change the truth to suit its own desires. And yes it annoys me that people on here continue to post complete crap then get arsey when they are shown to be wrong.

I don't see where the poster is proved to be wrong? The fact is that GTR don't need to change the logo. As you said in your own post it is not important so leave the rebranding until the passengers see some improvement even if this doesn't happen until 2018. At the moment all 3 parts of the franchise are rock bottom in terms of performance. I am looking forward to 700s hitting great northern. That is an improvement over the 387s. But as you freely admit yourself the company / DFT / whoever else shouldn't be wasting time and money on rebranding - they should be focusing on improving a dire situation in terms of a poorly performing franchise.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I don't see where the poster is proved to be wrong? The fact is that GTR don't need to change the logo. As you said in your own post it is not important so leave the rebranding until the passengers see some improvement even if this doesn't happen until 2018. At the moment all 3 parts of the franchise are rock bottom in terms of performance. I am looking forward to 700s hitting great northern. That is an improvement over the 387s. But as you freely admit yourself the company / DFT / whoever else shouldn't be wasting time and money on rebranding - they should be focusing on improving a dire situation in terms of a poorly performing franchise.

The wrong part would be GTR stuffed the contract on something they didn't sign.

But yes there is many things far more important than what logo is outside the train as we have said. Right now performance is the focus. And that needs to be the number one priority not nice to haves.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,729
Location
Central Belt
The wrong part would be GTR stuffed the contract on something they didn't sign.

But yes there is many things far more important than what logo is outside the train as we have said. Right now performance is the focus. And that needs to be the number one priority not nice to haves.

Ok. But couldn't agree more on the last part. Get the performance to a level to be proud of and then rebrand. If anyone suggest repainting 313s the also need to think why. (Not that i have seen it suggested)
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
The wrong part would be GTR stuffed the contract on something they didn't sign.

But yes there is many things far more important than what logo is outside the train as we have said. Right now performance is the focus. And that needs to be the number one priority not nice to haves.
I don't see the harm discussing and giving opinions on the logo here, which is very much part of both the 700s and GTR in general.

It doesn't mean I go to bed at night worrying about it, or that it somehow stops other things being talked about and considered more important in the grand scheme of things.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,099
I read in Rail Magazine that Great Northern's overall passenger satisfaction score in the National Rail Passenger Survey fell from 79% to 64%. I wouldn't mind betting that the 79% scored in 2015 was down on that achieved by FCC in their last year of operation.

Shows how bad things have fallen under GTR on Great Northern. They can't blame London Bridge redevelopment, DOO disputes or the introduction of new trains (doubt there was any significant 387 operation when the survey was done).

I see the handrails on the stairs at Stevenage station have been painted 'Connex yellow' - seems an appropriate choice of colour!
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
Apart from the problems with the overheads (vastly improved after many years of upgrade work that caused a lot of heartache over weekends for years), and suicides, there hasn't really been any major problems on GN for years. Wagn and FCC each ran things pretty well, and even the Sunday working issues weren't until the latter half of First's tenure and possibly down to the attempts to harmonise working arrangements between TL or GN?

GN almost seemed as safe as c2c in terms of punctuality and clearly GNER and subsequent operators also have a fairly easy ride.

More recently the issues with driver shortages on GN has been so regular that I don't even risk travel unless absolutely necessary at weekends, and feel uncomfortable making plans in the week as it's always a bit of a gamble.

How did become like this? A route with a reliable fleet of trains, a well thought out timetable for the most part (gradual improvements and tweaks over the years to optimise it) and capacity upgrades.

Now people are on more cramped trains than they had before and can't be sure of a train even running.
 
Last edited:

Abpj17

Member
Joined
5 Jul 2014
Messages
1,012
I read in Rail Magazine that Great Northern's overall passenger satisfaction score in the National Rail Passenger Survey fell from 79% to 64%. I wouldn't mind betting that the 79% scored in 2015 was down on that achieved by FCC in their last year of operation.

Shows how bad things have fallen under GTR on Great Northern. They can't blame London Bridge redevelopment, DOO disputes or the introduction of new trains (doubt there was any significant 387 operation when the survey was done).

I see the handrails on the stairs at Stevenage station have been painted 'Connex yellow' - seems an appropriate choice of colour!

On TL, FCC were partly to blame for at least the first year of GTR. It was commonly believe that FCC had ceased to keep up maintenance in the closing months of the contract - so GTR inherited problem trains. And huge number of drivers that GTR felt it needed to recruit is very well documented. At least some of that applies to GN as well?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Units at Bedford this morning in case it is helpful

Bedford Carriage Sidings starting from running line and going east
377510+377207
700018
700036
700014
319372
377213+another 377 (516?)
700009
Empty

319445+another 319
700005
387118+another 387 (105?)
700002

Checking RTT suggests that more units will come out of Bedford Carriage Sidings but there are no workings from Jowett Sidings until late evening.

Jowett sidings
700107
700111
700106
700112
700101

Bedford to St Albans shuttles in the hands of 319439 and 377s.

8-car 700 at Blackfriars overnight was 700015 - should have worked 2W11 0652 London Blackfriars to Brighton

8-car 700 at Brighton was 700016 as that worked 2W79 2240 Bedford to Brighton last night. RTT appears to suggest that berthed in platform 5 overnight and would therefore be working 2W16 0804 Brighton to Bedford this morning.

And at Cricklewood 700007, 700020, 700006, 700019
 
Last edited:

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,099
On TL, FCC were partly to blame for at least the first year of GTR. It was commonly believe that FCC had ceased to keep up maintenance in the closing months of the contract - so GTR inherited problem trains. And huge number of drivers that GTR felt it needed to recruit is very well documented. At least some of that applies to GN as well?

GTR took over from FCC in September 2014. It's now February 2017 - whatever 'issues' GTR inherited from FCC should have been long dealt with by now.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
On TL, FCC were partly to blame for at least the first year of GTR. It was commonly believe that FCC had ceased to keep up maintenance in the closing months of the contract - so GTR inherited problem trains. And huge number of drivers that GTR felt it needed to recruit is very well documented. At least some of that applies to GN as well?
I remember and used GoVia's first attempt at running Thameslink. I expected more of the same and was not proven wrong. That's all I have to say on that matter.
GTR took over from FCC in September 2014. It's now February 2017 - whatever 'issues' GTR inherited from FCC should have been long dealt with by now.

Hear hear.
 
Last edited:

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
On TL, FCC were partly to blame for at least the first year of GTR. It was commonly believe that FCC had ceased to keep up maintenance in the closing months of the contract - so GTR inherited problem trains. And huge number of drivers that GTR felt it needed to recruit is very well documented. At least some of that applies to GN as well?

I would agree that each TOC should get maybe a year or so 'grace' to fix issues discovered from the outgoing operator. When GTR took over and realised there weren't enough drivers, they should have fixed it straight away.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,311
Location
Hertfordshire / Teesdale
I read in Rail Magazine that Great Northern's overall passenger satisfaction score in the National Rail Passenger Survey fell from 79% to 64%.

So what a surprise, I'm not the only person to find the GN service has moved *backwards*.

I see the handrails on the stairs at Stevenage station have been painted 'Connex yellow' - seems an appropriate choice of colour!

Yep, sums things up really.
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,397
I would agree that each TOC should get maybe a year or so 'grace' to fix issues discovered from the outgoing operator. When GTR took over and realised there weren't enough drivers, they should have fixed it straight away.

Perhaps the DfT should have quality measures in place and see to it that operators stick to them? I'd include headcount, operator-specific cancellations, punctuality, cleanliness and more in that.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
On TL, FCC were partly to blame for at least the first year of GTR. It was commonly believe that FCC had ceased to keep up maintenance in the closing months of the contract - so GTR inherited problem trains. And huge number of drivers that GTR felt it needed to recruit is very well documented. At least some of that applies to GN as well?

Repeating the lie that FCC didn't maintain trains properly is silly. There was no change from the exam schedule that happened under FCC and into GTR. So no GTR didn't inherit problems trains. This is a point I'm sick of making as someone suggested it and it seems to have been taken as fact. The trains atre still maintain to the same standards.

And as for drivers, don't forget it takes atleast two years from a company coming in and wanting more drivers until those drivers are actually front line.it can take six months to actually find the people you want for drivers before even getting a course set up for them. Said courses last 12-18 months depending on what route knowledge, trains they I'll drive etc etc.

And that's without the truth that the training schools are working flat out wih all existing drivers who are required to learning multiple new stocks coming in.
 
Last edited:

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
I would give GTR some grace for the need to train drivers for new stock, but as this was well known, both GTR and the DfT should have had plans in place for this too.
 

OFFDN

Member
Joined
30 Nov 2016
Messages
87
Location
Herne Hill
I would give GTR some grace for the need to train drivers for new stock, but as this was well known, both GTR and the DfT should have had plans in place for this too.

Let's just say that the information in the public domain isn't the full story.

Alas, this is straying from the topic at hand.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,796
Location
Epsom
Let's just say that the information in the public domain isn't the full story.

If you mean them taking on the drivers DB Cargo recently made redundant, the document was posted on Twitter the other day.


Getting back on topic, I understand 700 025 to be the next delivery as it has been reported as having been seen in France?
 

Abpj17

Member
Joined
5 Jul 2014
Messages
1,012
GTR took over from FCC in September 2014. It's now February 2017 - whatever 'issues' GTR inherited from FCC should have been long dealt with by now.

Yes...but you were the one that mentioned their 2015 score (probably) being down on FCC. The 2015 score will reflect what they inherited...

jon - I don't think it's possible to instantly train drivers though :) GTR were clear about the lack of drivers and the need to recruit and train very early on in their franchise.

class377/5 - I had the grace to say 'commonly believed'. As a passenger, the service markedly deteriorated in the last few months with significantly more trains that I used being out for repairs than was typical for year or so before of the franchise period. That period included one of my top 5 worst journeys (it took three trains to get home as two were taken out of service due to breaking)
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,841
Location
UK
GTR did say they hadn't got enough drivers, but why didn't they then get enough? Given how long it takes to train them.

There's never a shortage of applicants is there?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
If you mean them taking on the drivers DB Cargo recently made redundant, the document was posted on Twitter the other day.

No it goes back far further. For example Southern 3 years before the next franchise was due to start going to see DfT to tell them they need to fund massive driver recruitment and programme on the existing FCC and Southern franchises including increasing the scale of the driver training set up to cope with the scale of the task needed (the bottleneck 377/5 has pointed out especially with all the new stock and cascades). Govia there for have very good evidence that DfT goofed up very early on and DfT probably don't want this to surface. This isn't the only example either.
The driver numbers on FCC dropped faster after bid submission date than before which would have left all the bidders with a bigger issue to solve on driver training than DfT anticipated.
 
Last edited:
Status
Not open for further replies.

Top