Thameslink/ Class 700 Progress

Status
Not open for further replies.

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
Using newer stock the little reason not to have 12 cars on as many services as possible. Remember the extra 10x 387 will now allow more GN KX services to have DOO.

I didn't think that Great Northern have non-DOO services anyway.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
Using newer stock the little reason not to have 12 cars on as many services as possible. Remember the extra 10x 387 will now allow more GN KX services to have DOO.

Slightly confused by your post here... we are already fully DOO on GN... how will additional 387s alter the situation from using 365s for 12 cars? There are also 12 car 321 operated services at present? Or are you saying there will be a net increase of 10 units as a result of the 387s, allowing further remaining GN services to be 12 car?
 
Last edited:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Slightly confused by your post here... we are already fully DOO on GN... how will additional 387s alter the situation from using 365s for 12 cars? There are also 12 car 321 operated services at present? Or are you saying there will be a net increase of 10 units as a result of the 387s, allowing further remaining GN services to be 12 car?

Current stock on GN makes full driver DOO operation impossible. 387/700 change this. IRC 365s don't have SDO either so you can't call a 12 car at a short platform.
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,884
Current stock on GN makes full driver DOO operation impossible. 387/700 change this. IRC 365s don't have SDO either so you can't call a 12 car at a short platform.

Do you mean an end to platform staff dispatching 12 car trains at certain locations? Because of in-cab CCTV, this could come to an end.

GN services are all DOO.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,099
Everything on Great Northern is DOO and has been since British Rail days. We even have 12-car DOO non-stop Kings Cross - Cambridge.

I can't see 12-car 700s being allowed to call at 8-car platforms even with SDO as the dwell times would be horiffic.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Do you mean an end to platform staff dispatching 12 car trains at certain locations? Because of in-cab CCTV, this could come to an end.

GN services are all DOO.

Means they can have camera's and get rid of more staff ....:roll:
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Do you mean an end to platform staff dispatching 12 car trains at certain locations? Because of in-cab CCTV, this could come to an end.

GN services are all DOO.

In cab CCTV does not mean an automatic end to platform staff. The 377/387s is proof of this at places like Bedford, St Albans etc.

Everything on Great Northern is DOO and has been since British Rail days. We even have 12-car DOO non-stop Kings Cross - Cambridge.

I can't see 12-car 700s being allowed to call at 8-car platforms even with SDO as the dwell times would be horiffic.

GN may have been DOO since then but it's never had stock built with cameras etc. Having 12 cars call at car platforms is useful feature especially in disruption.

I fear however this issue over GN DOO with cameras is taking over the 700 thread.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,843
I'm aware this is slightly off-topic, but are 377/387s now stopping at the platform markers for the 700s on the Thameslink route? I was waiting by the 8-car marker recently and the train instead stopped at the end of the platform by the new marker, which surprised me - admittedly I don't spend much time down south any more so this might have been going on for ages!
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
In cab CCTV does not mean an automatic end to platform staff. The 377/387s is proof of this at places like Bedford, St Albans etc.



GN may have been DOO since then but it's never had stock built with cameras etc. Having 12 cars call at car platforms is useful feature especially in disruption.

I fear however this issue over GN DOO with cameras is taking over the 700 thread.

What about the rumours from the TLK lot that they want 700's to be self dispatch everywhere?
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
What about the rumours from the TLK lot that they want 700's to be self dispatch everywhere?

The total opposite appears to be happening with what I believe to be around 50 agency staff currently being trained up for 700 dispatch on TL (may be more or less than that, that's just the figure that's going around, but it's in that area)...
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
The total opposite appears to be happening with what I believe to be around 50 agency staff currently being trained up for 700 dispatch on TL (may be more or less than that, that's just the figure that's going around, but it's in that area)...

That's always been the declared intention for the core stations, hasnt it? Not least in order to meet the dwell times.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I'm aware this is slightly off-topic, but are 377/387s now stopping at the platform markers for the 700s on the Thameslink route? I was waiting by the 8-car marker recently and the train instead stopped at the end of the platform by the new marker, which surprised me - admittedly I don't spend much time down south any more so this might have been going on for ages!

What station?

What about the rumours from the TLK lot that they want 700's to be self dispatch everywhere?

I'm not read anything saying that was the plan.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,584
Location
Croydon
The total opposite appears to be happening with what I believe to be around 50 agency staff currently being trained up for 700 dispatch on TL (may be more or less than that, that's just the figure that's going around, but it's in that area)...

That's always been the declared intention for the core stations, hasnt it? Not least in order to meet the dwell times.

Your making me think of the staff they use in Tokyo to cram em into the trains :roll: !.
 
Last edited:

Supercoss

Member
Joined
5 Jun 2016
Messages
457
Thursday 30th/Friday 1st July off peak revenue runs Brighton - core - Bedford
Monday 4th continues all week(m-f)
Monday 11th July 3 diagrams in use
Then two diagrams per week to be converted to 700 (primarily FLU-12 car)
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Thursday 30th/Friday 1st July off peak revenue runs Brighton - core - Bedford
Monday 4th continues all week(m-f)
Monday 11th July 3 diagrams in use
Then two diagrams per week to be converted to 700 (primarily FLU-12 car)

Wondered how long it would be before this came out. Note next week isn't 100% confirmed next week as few bits of testing to complete yet.

Actual diagram does Brighton - Bedford - Three Bridges only.

The initial diagrams are only 700/1.
 

Nic Robinson

Member
Joined
15 Jun 2016
Messages
48
Thursday 30th/Friday 1st July off peak revenue runs Brighton - core - Bedford
Monday 4th continues all week(m-f)
Monday 11th July 3 diagrams in use
Then two diagrams per week to be converted to 700 (primarily FLU-12 car)

Many thanks. Useful gen.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,081
Wondered how long it would be before this came out. Note next week isn't 100% confirmed next week as few bits of testing to complete yet.

Actual diagram does Brighton - Bedford - Three Bridges only.

The initial diagrams are only 700/1.

no other running next week?
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
10:02 Brighton-London Bridge was canx at Gatwick due to problems with traction equipment(?)

It was a down Victoria to Brighton 1Axx service with EP brake problems at Hyaywards Heath that was causing all the problems, nothing to do with signalling problems (well none in TBASCs area or reported elsewhere) and there were no traction supply problems reported either. Went back to depot as 5B18
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
no other running next week?

No. Just one unit. It's a bedding in period with slow/soft introduction. By autumn the 700s will be running around so much there will be little interest other than first days in services.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,081
No. Just one unit. It's a bedding in period with slow/soft introduction. By autumn the 700s will be running around so much there will be little interest other than first days in services.

ok. was hoping one would be out on LBG to BTNs again.
 