Hi, so I signed up specifically for this thread. My best mate drives for thameslink. I was showing him this thread and to be honest he was laughing at the amount of guessing. Anyway, just so you know:
1. Most Thames link drivers have not started the training for the class 700, so much of this information is passed down from work colleagues to my best friend. My friend does not begin his training until at least the end of this year.
2. There is an issue that could be partly to blame for the delayed start of the class 700. The class 700 uses automatic door opening. The plan was that this would prevent accidental opening Of the doors on the wrong side of the train, however the system has had a dangerous side-effects. In tests it has been found, that's when the train stops at a red light that happens to be at the end of the platform, regardless of whether or not the train is scheduled to stop at that platform, the doors are opening without any input from the driver, and currently there is no override for this system.
3. The new rebranding was certainly not circulated internally before it rolled out. In fact my best friend wasn't even made aware of it until I pointed out to him on Twitter.
Anyway, if I do get any further information I think you guys may find useful, I will certainly post on here as I have been keeping an eye on this forum for a few weeks now.