can imagine a couple of units will be berthed at tattenham corner and tattenham corner sidings too and maybe London Bridge station.
How about Selhurst and Lovers Walk depot too?
Presumably Cambridge will be a stabling location as well?
Orpington platforms/Orpington Down Sidings should take care of at least one unit
I have now booked Saturday 16th April 2016 off work - any ideas what schedule it will run on or is it too early to say
Should be fun if a 12-car is sent down to the bay for stabling by mistake, instead of an 8-car...![]()
700108 at Blackfriars https://www.flickr.com/photos/mackenzieblu/, on FlickrYou wn't see any. Testing is Monday to Friday only.
One is due to enter service that day? Are they not?
Thameslink: 16 April 2016 Start of programme of introducing new Class 700 trains on Thameslink
http://www.thameslinkrailway.com/about-us/improvements/our-commitments/
No they are not. As previous pointed out the public magazine has had various different dates in them.
Hi does anyone know if the 700 testing will run on Friday and bank holiday Monday?
This is the only chance I will potentially get to see before they enter service.
PPreferably 3T23 via preston park
Thanks
700112 was delivered this morning. 9th unit.
I'm sure it's been detailed in this thread somewhere, but can I ask how the units are being delivered?
From afar I'm guessing via the tunnel then Dollands Moor to Three Bridges via Redhill, if so is that top and tail or a good old fashioned run round at Redhill?, or is it all far more complicated than that?
Sorry if I'm asking for old news
Dollands Moor to Three Bridges via Maidstone East, Catford, Clapham Junction, East Croydon so they don't require a run around at all.
No they won't. They are standard Monday to Friday only like all standard testing meaning no weekends nor bank holidays.
I saw another one out on test today at Norwood Junction around 4pm, but I didn;t get the number.
I can't recall the figures for Hornsey but other locations built are such...
Three Bridges - 304 max
Cricklewood - 220 IIRC
Bedford - 172
Brighton - 36
Peterborough - 60
That's 792 out of 1,140 carriages leaving just 348.
Isn't Peterborough six 12 car roads? 72 cars.
Likewise Horsham 6x12 is 72 instead of 60.
Is it me, or is the destination display rather small?
Is it me, or is the destination display rather small?
It's about the same size as current stock but its not pushed over to one side like on the Electrostars and fits far more on the screen in one go.
And 103 arrived this morning. That's 10 units now.
It probably won't need it, but does it have a scrolling feature like the electrostars?
Siemens released a CGI video awhile back showing the front screen scrolling.
West Hampstead Thameslink I believe will be the longest name that is able to be displayed wholly on the screen.
I would've thought it'd be better to stretch the text where the name is quite short - the text looks to be too condensed really.
Standard size applied to make it easy reading for those requiring it.
Certainly looks a lot smaler than it might have been, judging by the apparently empty space around it. It'll make it a bit harder to spot when the destination shown is wrong!
But it may be more useful for intending travellers to have the destination information repeated in multiple locations on the side of the train: the 377s and 450s provide this information in alternative ways, and I think the two small screens per coach on an Electrostar beats the 2 larger screens per unit on a Desiro.