Thameslink/ Class 700 Progress

Status
Not open for further replies.

talldave

Established Member
Joined
24 Jan 2013
Messages
2,676
....Of course it's none of my business and I'm not trying to dictate to people what to post but I've seen people dragged over the coals for this before and would hate to see anyone loose their job over a seemingly innocent and thoughtless comment on here.

It's great advice. I think the posting of photos from inside the workplace is also worth avoiding. Even though I, like many others, appreciate the opportunity to see them, it's not worth a black mark on someone's employment record.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

insane_lewis

Member
Joined
31 Jan 2012
Messages
35
Thanks for the advise.

But from being inside and being briefed on the matter. It's more of a point of pulling the company's name down, slagging off managers or other employees. Or publishing photos and information that's not meant for the general public.

Which is why I have stated that I will not post any information that I deem to be sensitive without prior permission.

As far as the 66 photos are concerned. Well they are no big secret so don't consider myself to be in breach of any obligations or contract?

And when a colleague asked if we were allowed to post pics on facebook he was told it was ok as it was after the press release

:)
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
Thanks for the advise.



But from being inside and being briefed on the matter. It's more of a point of pulling the company's name down, slagging off managers or other employees. Or publishing photos and information that's not meant for the general public.



Which is why I have stated that I will not post any information that I deem to be sensitive without prior permission.



As far as the 66 photos are concerned. Well they are no big secret so don't consider myself to be in breach of any obligations or contract?



And when a colleague asked if we were allowed to post pics on facebook he was told it was ok as it was after the press release



:)


Don't disagree with any of that. My point was that you clearly identified who you actually are to your employer and should you say anything in the future which they take exception to then they will know exactly who you are
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
True, I will just have to make sure I'm on my best behaviour :D


For your own sake please do. Although it seriously may be worth looking at deleting the account and re-joining as a different username so you can freely participate as 'A-Shunter' etc without managment knowing who you are.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
I know this is slightly out of context, but what routes will the remaining 365's running on GN do once the 700's have entered service?

They will continue to operate the Peterborough peak semi-fast services and possibly other additional services from Kings Cross.
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
They will continue to operate the Peterborough peak semi-fast services and possibly other additional services from Kings Cross.


Plus kings Lynn. 377s will be used alongside 365s on both Peterborough and Lynn routes.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
Plus kings Lynn. 377s will be used alongside 365s on both Peterborough and Lynn routes.

It won't be a common pool of 4-car units will it? I've been told there are operational advantages with using a 377/5 on services extending beyond Cambridge.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
It won't be a common pool of 4-car units will it? I've been told there are operational advantages with using a 377/5 on services extending beyond Cambridge.

An obvious advantage would presumably be using the 377/5s for portion working with a unit lost or gained at Cambridge. The through gangway giving it an advantage over the 365...
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,013
Location
St Albans
Of course they showed a table in the first class area. All the seats were under white covers.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,610
Location
Hampshire
BBC website report on first Class 700 to arrive at Three Bridges depot. No video report online at the moment, though I think there is going to be a story on South Today at 6.30pm on BBC1 which will be on iPlayer

http://www.bbc.co.uk/news/uk-england-sussex-33779012

There was, and good old* said that the cascaded older Thameslink Rolling stock will become Thames Valley Commuter stock referring to the 319s. Close Paul, but this was one of the original plans, fairly new an 387s for us now!

*He seems to have a problem with the age of rolling stock, so I'll just highlight that bit for him.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,274
There was, and good old* said that the cascaded older Thameslink Rolling stock will become Thames Valley Commuter stock referring to the 319s. Close Paul, but this was one of the original plans, fairly new an 387s for us now!

*He seems to have a problem with the age of rolling stock, so I'll just highlight that bit for him.

To be fair to Paul Clifton, what he said was "many of today's Thameslink trains". He did not specify which type of unit would move but a generalised remark like that quite clearly encompasses the 387s which will move to GW routes.

Reports is online here until 7pm tonight, starts 14 minutes into the programme

http://www.bbc.co.uk/iplayer/episode/b0643p5x/south-today-04082015
 

03_179

Established Member
Joined
13 Aug 2008
Messages
3,861
Location
At my desk
As well as the current Thameslink network and the Wimbledon Loop, they will be deployed across new routes from 2017 as part of £6.5bn Thameslink improvements currently under way.

Is this true?

700s on the wall of death ?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
700s will be on all routes going through the core, including the Wimbledon loop. after the first couple of 12 car trains have been delivered, it is expected that 8 car trains will be delivered to allow the 319s to be released
 

03_179

Established Member
Joined
13 Aug 2008
Messages
3,861
Location
At my desk
LOL they will look like crap after a week after the locals lot have been on scratching windows, graffiti and leftover foot waste.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
LOL they will look like crap after a week after the locals lot have been on scratching windows, graffiti and leftover foot waste.

The very same locals who were demanding a direct service because a two minute change across the platform is not good enough - they simply must take precedence over all operational efficiencies and common sense. Greater good and all that :roll:
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,081
The very same locals who were demanding a direct service because a two minute change across the platform is not good enough - they simply must take precedence over all operational efficiencies and common sense. Greater good and all that :roll:


the return in the evening though would be an issue, from the down platform at blackfriars to one of the bays. that would be chaos in the peak.
 
Last edited:

neilm

Member
Joined
3 Jan 2012
Messages
501
Yes and also it would not be a walk across the platform it be down and under. I do think it is a shame though that because of this 8 car trains will be through the core and all should be 12.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
Yes and also it would not be a walk across the platform it be down and under. I do think it is a shame though that because of this 8 car trains will be through the core and all should be 12.

It would never have been all 12car.

It just means more 8 car thought the core - there would always have been plenty of 8 car though the core with 6tph 8 car via E&C in the original plan as well as some 8 car via London Bridge. This only caused an increase of 2tph 8car through the core.

And the change in order size for 1160 to 1140 cars overall
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
700s will be on all routes going through the core, including the Wimbledon loop. after the first couple of 12 car trains have been delivered, it is expected that 8 car trains will be delivered to allow the 319s to be released

Not quite the first couple. The batches of 700 deliveries have already been announced.

1 - 11x 12 cars
2 - 6x 8 cars
3 - 4x 12 cars
4 - 40x 8 cars
5 - 30x 12 cars
6 - 12x 8 cars
7 - 10x 12 cars
8 - 2x 8 cars

The very same locals who were demanding a direct service because a two minute change across the platform is not good enough - they simply must take precedence over all operational efficiencies and common sense. Greater good and all that :roll:

Its not two minutes for most of the train. They could come into platform 4 as well as 3.

Your statement ignores is the Loop has years of engineering works and alterations yet would actually have seen a worse service as a result. Not that is that different putting services from Wimbledon to City alongside Denmrk Hill to Blackfriars bays as it is today.

Yes and also it would not be a walk across the platform it be down and under. I do think it is a shame though that because of this 8 car trains will be through the core and all should be 12.

There was never going to be an all 12 car railway as no-one wants to pay for the of getting all the platforms. Kentish Town alone would have shut a major road years and cost a lot of money.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
8-car units for instance will be used for Tattenham Corner-Cambridge. Already a lot of station lengthening/SDO needed for that
 