So is that a definite delay to Platform 0 - last we heard about a month ago it was still going ahead in December 2017.
Why can't the FOC's turn round in the middle roads or is the uninspiring layout preventing that?
All I'll say is the Arun Valley re-signalling was in time until three weeks before commissioning as an example.
With the through roads at Redhill only about 12 car long, your not going to get an engine, translator wagon, 12 car 700 and translator wagon in there to run round, let alone most engineers trains that run round, then you need someone safe for the staff to work while splitting & attaching.