The passenger information screens remind me of the flat screens that popped up at Railtrack/Network Rail stations around 2000. They seemed so futuristic... until they were distorted by the sun's glare and suffered screen issues. The dot matrix replacements were far better. I know you only have to look at how far TV and computer monitor resolution has come to see the improvements from 14 years ago but I hope these new displays are thoroughly tested.
The unveiling has certainly sparked some media interest. I was impressed by the amount of photos on the SE1 webiste's Flickr account. I'm not sure if these are the same as the ones mentioned earlier - it could be a standard media release. http://www.flickr.com/photos/se1website/sets/72157640249883405/
Going to have a look tomorrow, but initial impressions are that they'll be noisy and draughty and probably very rattly quite soon after they've been in service a while. Once again the trains have been designed to act as pseudo-tube trains for passengers only wanting to travel through the Core.
Looks like a backward step for longer distance commuters after the relative comfort of the 377s. Where will all the airport passengers' luggage go? I'll tell you where, in the "corridor" areas at the end of the carriages, thus making movement up and down the train difficult.
How long will it be (assuming MML electrification goes ahead) before the Thameslink franchise is extended northwards to Wellingborough and Kettering/Corby. Anyone fancy a trip from Corby to Brighton on a glorified London Overground train?
Looking through those pictures there's one thing going through my mind. Uh Oh, here's a DfT spec train that as you say designed to work very well with the large loadings through the core, but leave the outer reaches of the line with what is unfortunately a better built 378. I don't question Siemens quality - at the end of the day it'll be a quality well built product, but what I do question is is it such a good idea to be as spacious as possible without effectively alienating the longer distance traveller? I know the Thameslink contract must be a challenge to cater for 3 types of traveller (commuter, airport use and longer distance) but it does appear to me that creating as much space as possible for passing through the core has won out on this, rather than thinking these will go onward from Brighton to Bedford / Peterborough and further afield.
And I see some things don't appear to have been learnt from previous rolling stock - http://www.flickr.com/photos/se1website/12189715183/in/set-72157640249883405/ The sink for example example reminds me a little of that found in the Notworker designs, which ultimately leaves you with more water running onto the counter top and dribbling onto the floor than water on your hands (Although it still appears to be the Desiro design - rather than the converted cupboard Bombardier type effort).
Overall, a good looking well designed train potentially to be let down by a poor choice in specification. Hopefully the 700 will be internally as flexible as Siemens say it will be - I've a feeling that it'll somewhat end up being changed within a few years of service.
Last edited: