700019 entered service on Friday, having only been delivered on the 7th September, that's probably the quickest turnaround yet...
I went on it on Friday as well. Thought it was exceptionally clean inside and out.
Maybe GTR should make them all ECS in the next timetable change.They are usually like that, - until you let the great British public loose on them. *
That's the inside of course!
So is this because of the walk through design or are first class compartments in other train stocks dangerous? (Serious if possibly ignorant question)
700019 entered service on Friday, having only been delivered on the 7th September, that's probably the quickest turnaround yet...
Are there any general targets eg 30 in use by Dec, 50 by February etc?
I know there's now 31 in the UK and are there are 8 being used daily at the moment?
I went on 700 002 yesterday on the 22:22 Bedford - Brighton 01:03 service yesterday. I have ridden on the 12 coach units 32 times but this was the first time that i have been on an 8 coach unit. Other than the length and unit numbers the 700/0s and 700/1s seem to be basically identical.
Once all of the 700s are in service will the 8 coach units regulary come to Brighton or will it just be the 12 coach units? I thought the 8 coach units are for the Sutton Loop and Sevenoaks services while the 12 coach units are for the Brighton services?
I went on 700 002 yesterday on the 22:22 Bedford - Brighton 01:03 service yesterday. I have ridden on the 12 coach units 32 times but this was the first time that i have been on an 8 coach unit. Other than the length and unit numbers the 700/0s and 700/1s seem to be basically identical.
Once all of the 700s are in service will the 8 coach units regulary come to Brighton or will it just be the 12 coach units? I thought the 8 coach units are for the Sutton Loop and Sevenoaks services while the 12 coach units are for the Brighton services?
What a great photo!!Wow - keeping an accurate tally! 700002 failed at Redhill yesterday on the 1719 to Bedford, with passengers trapped on board when the driver could not release the doors. It took at least 15 minutes to resolve, with the usual utter lack of information on the platform.
Wow - keeping an accurate tally! 700002 failed at Redhill yesterday on the 1719 to Bedford, with passengers trapped on board when the driver could not release the doors. It took at least 15 minutes to resolve, with the usual utter lack of information on the platform.
"Teething problems".
"Teething problems".
Indeed - but wasn't the exhaustive German and UK testing/mileage accumulation/training supposed to solve this issue before entering service (or at least make it far rarer than it has been)?
You are presuming that the failure was incipient in the class 700 design as delivered from Germany. That ignores all the unexpected issues that may be down to UK rail infrastructure.
How many 700s have actually broken down? It always seems to be door related issues thus far.
I realise Joe Public doesn't care either way and it's just semantics - but have any had mechanical or electrical problems besides the doors?
They certainly cared yesterday when they couldn't get off their train for a quarter of an hour! I think most of the failures I have seen reported have been doors, which, after all, are very important components that should be tested as thoroughly as anything else. Indeed, given the known effects of door failures on the service, there may be a case for an enhanced testing regime for them on new stock to ensure reliability.
Aren't a lot of the door problems software/driver related though?
Although still missing compartment stock from years ago, I must admit to have been rather more relieved to have been stuck on a open-plan 700 a few weekends ago for the best part of an hour and a half (in a tunnel). Much less claustrophobic and free to walk up and down the entire length of the train without having to find vestibule doors in the dark etc or sitting in a small compartment not knowing what the person next to you might do in a confined space
I do hope that behind closed doors questions are being asked.
And they don't open those doors until they find a fix either!
Wow - keeping an accurate tally! 700002 failed at Redhill yesterday on the 1719 to Bedford, with passengers trapped on board when the driver could not release the doors. It took at least 15 minutes to resolve, with the usual utter lack of information on the platform.
Wow - keeping an accurate tally! 700002 failed at Redhill yesterday on the 1719 to Bedford, with passengers trapped on board when the driver could not release the doors. It took at least 15 minutes to resolve, with the usual utter lack of information on the platform.
Indeed true, but being unable to open the doors while berthed at a platform much longer than the train does not sound to me like a UK infrastructure problem - I could be wrong. In any case, the number of failures on the 700s since introduction must surely call into question the value of the supposedly exhaustive testing, including on the very routes on which they run?
No idea, but if they are, I would have expected software to be tested properly and checked in trial running and driver training to have been effective such that problems would be rare on entry to service. Once again, though, it seems that new stock cannot be introduced without problems, despite the supposedly rigorous testing regime beforehand. Perhaps it would be wise to amend the pre-service work to take account of the problems found with this stock (and all the previous stocks which have encountered door issues).
In any case, the public will just see yet another type of new train being brought in which appears to them to be unfit for purpose.
--- old post above --- --- new post below ---
Sounds like that, at least, was not a door failure (if it was even a problem at all on your train).