pethadine82
On Moderation
- Joined
- 16 Jun 2012
- Messages
- 283
Was just wondering how 24 TPH are going to be managed, the current timetable takes nearly an hour to cross London, it is very slow.
Also why did they not tunnel under the ground to connect the far end of rails to canal tunnel, north of KGX as transversing so many lines is going to cause a bottle neck. As you move north there was what I believe rail that used to go through the arched tunnels towards FPK, that could have been brought back into use.
Another observation was when the East London Line was extended could they not have connected it north to finsbury park and have 3 pairs of track ( third being bidirectional ) so that after finsbury park, the service could call at Highbury and Islington, then Canada Water , New cross gate then on to Croydon, thus bypassing and easing congestion on the core. Those that want to go into central, just switch at FPK. Those that work in Canary wharf would have it very easy just changing at canada Water. Just a though, would welcome comments.
Also why did they not tunnel under the ground to connect the far end of rails to canal tunnel, north of KGX as transversing so many lines is going to cause a bottle neck. As you move north there was what I believe rail that used to go through the arched tunnels towards FPK, that could have been brought back into use.
Another observation was when the East London Line was extended could they not have connected it north to finsbury park and have 3 pairs of track ( third being bidirectional ) so that after finsbury park, the service could call at Highbury and Islington, then Canada Water , New cross gate then on to Croydon, thus bypassing and easing congestion on the core. Those that want to go into central, just switch at FPK. Those that work in Canary wharf would have it very easy just changing at canada Water. Just a though, would welcome comments.