Presumably because some GN services will be terminating at Kings Cross and the Maidstone services terminate at Blackfriars that increases the total number of units required to operate the service until 2019.
Though we don't have details yet if the additional GN Cambridge Semi-fast will be operating in to Kings Cross from May 2018, or brought in as a new service next December. The off-peak GN stoppers could stay as 4 coaches for a while !
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,884
On the one hand, it's being reported that the full timetable won't be introduced until December 2019, yet the Saturday draft timetable titled 2018 has Cambridge trains going through to Maidstone.

Yet the proposed Sunday timetable seems very lacklustre compared to what has been previously touted as happening:
TL5 Peterborough to Horsham was supposed to be 2tph on Sundays but is only shown as 1tph.
GN4.2 Hertford North to Moorgate was supposed to be 4tph on a Sunday but only the 2tph GN4.1 Stevenage to Moorgate are shown.

Is the Sunday the final proposal or an interim timetable?
Gives the impression they don't know what they're doing!
 
Last edited:

tbwbear

Member
Joined
28 Nov 2017
Messages
286
Presumably because some GN services will be terminating at Kings Cross and the Maidstone services terminate at Blackfriars that increases the total number of units required to operate the service until 2019.
Though we don't have details yet if the additional GN Cambridge Semi-fast will be operating in to Kings Cross from May 2018, or brought in as a new service next December. The off-peak GN stoppers could stay as 4 coaches for a while !

Has a date been given for the Maidstone to Blackfriars services to commence ?

Could it be that they don't begin until the Cambridge services get extended through Blackfriars in December 2019 ?

Isn't it going to be quite difficult to terminate two services per hour on the west side of Blackfriars - especially as the Maidstone services are timetabled to be routed via London Bridge ?
 

david737

Member
Joined
1 Jun 2015
Messages
122
Location
Harrogate, North Yorkshire
Has a date been given for the Maidstone to Blackfriars services to commence ?

Could it be that they don't begin until the Cambridge services get extended through Blackfriars in December 2019 ?

Isn't it going to be quite difficult to terminate two services per hour on the west side of Blackfriars - especially as the Maidstone services are timetabled to be routed via London Bridge ?

If they start running a Maidstone to Blackfriars service it definitely won't go via London Bridge as there is no crossover from the up/down Blackfriars spurs into the bay plats 3&4 at Blackfriars despite there being one in the original plans. When this was raised with the project sometime back the answer was 'there won't be any trains from London Bridge booked to terminate at Blackfriars' looks as if this omission could be coming back to bite them.
 

tbwbear

Member
Joined
28 Nov 2017
Messages
286
If they start running a Maidstone to Blackfriars service it definitely won't go via London Bridge as there is no crossover from the up/down Blackfriars spurs into the bay plats 3&4 at Blackfriars despite there being one in the original plans. When this was raised with the project sometime back the answer was 'there won't be any trains from London Bridge booked to terminate at Blackfriars' looks as if this omission could be coming back to bite them.

So the options would seem to be

1) Run it via Catford or Herne Hill (is there capacity - isn't Catford going to 4tph?)
2) Terminate it at London Bridge, Cannon Street or Charing Cross (as pre-2009)
3) Wait until 2019 to bring it in (at least the new off-peak Thameslink Maidstone service)

Am I alone in thinking, it will be option 3, and as this is the last piece of the whole Thameslink puzzle, there could be a fair chance it might not even happen... Too pessimistic ?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,682
If they start running a Maidstone to Blackfriars service it definitely won't go via London Bridge as there is no crossover from the up/down Blackfriars spurs into the bay plats 3&4 at Blackfriars despite there being one in the original plans. When this was raised with the project sometime back the answer was 'there won't be any trains from London Bridge booked to terminate at Blackfriars' looks as if this omission could be coming back to bite them.

The answer was actually "would you spend £5m of your own money for something that is not planned to be used, and is very unlikely to be used in unplanned situations". Or words to that effect
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,761
Location
Central Belt
I also have my doubts to if Maidstone to Welwyn will ever run.

However look at the evening timetable and you find direct services to Welwyn Garden City. Very odd if they only run core late evening and Saturday as the latest timetables suggest.
 

Downthelane

Member
Joined
11 Jan 2016
Messages
174
I also have my doubts to if Maidstone to Welwyn will ever run.

However look at the evening timetable and you find direct services to Welwyn Garden City. Very odd if they only run core late evening and Saturday as the latest timetables suggest.

Please remove- duplicate post.
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
Just noted that the core will be shut 01:00 Saturday night until 09:30 Sunday morning to enable Network Rail maintenance to take place. Trains will run into St Pancras, Kings Cross, London Bridge and Blackfriars instead.

Also it appears the Sunday timetable is only temporary until Network Rail finish all the Maintenance work along BML to bring it up to standard needed to run full Thameslink - that's why they got £300m to update lines North and South of the core.

For example Peterborough to Horsham says it will be two per hour by May 2019 and Cambridge to Three Bridges has similar comment.
 

Bishopstone

Established Member
Joined
24 Jun 2010
Messages
1,685
Location
Seaford
Though the Brighton Main Line was only on a quasi-Saturday service today, my evening train from Gatwick to Lewes - and others - still lost a random and unexplained ten minutes en route, scuppering the booked connection to Seaford.

Unless they can pare back these 'sundry' hiccups with their knock-on impacts, I think the ramping-up of the Core timetable, next year, is going to cause real challenges.
 

MML

Member
Joined
25 Oct 2015
Messages
592
No through service between London St Pancras and London Blackfriars during Xmas week due to engineering work. Trains south of the river are starting at London Bridge and are presumably re-scheduled to allow cross-London connection by underground.

That will certainly explain most delays to Thameslink schedules.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
No through service between London St Pancras and London Blackfriars during Xmas week due to engineering work. Trains south of the river are starting at London Bridge and are presumably re-scheduled to allow cross-London connection by underground.

That will certainly explain most delays to Thameslink schedules.
Whether that caused delays to a Southern service though is another matter.
 

Gareth4949

Member
Joined
14 May 2014
Messages
42
Does anyone know if any thameslink services have run via the London Bridge though platforms today ie via Platform 4 and 5
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
Does anyone know if any thameslink services have run via the London Bridge though platforms today ie via Platform 4 and 5

Certainly none so far on late shift, all trains using (W) prefix for going via Herne Hill.
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
When they do, will they be making an unadvertised passenger call?

Personally I don’t actually know, but others have said that they scheduled to pass straight through the station and wait for time at either Blackfriars junction up direction and bricklayers arms junction down direction. Now whether GTR start stopping there when they are more certain of the drivers diagrams and route knowledge nearer the May timetable change as part some good publicity will be up to them.
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,015
The information on this site seems to be slightly different to that previously announced.

https://www.railplan2020.com/

It mentions Cambridge to Brighton is starting in December 2018. the previous info we had from the consultation indicated that this would start in May. Peterborough is now mentioned in May 2018 (on the Southern services page!).
From December 2019 it now mentions Cambridge to Ashford services - the consultation had previously shown this as terminating at Maidstone East.

Improvements to Great Northern include:
From May 2018

  • Increased frequency and capacity of trains from Welwyn Garden City and Hertford North and on into London following extensive consultation with passenger groups
From December 2018

  • Direct Thameslink services from Cambridge and local Great Northern stations to Brighton via Gatwick with new destinations and travel opportunities
  • The interconnection with the Elizabeth Line (Crossrail) presents new, simplified journey options and destinations
From May 2019

  • Direct London services from Welwyn Garden City and local stations to Sevenoaks with simplified services and new travel opportunities

Improvements to Thameslink include:
From May 2018

  • Littlehampton to London Bridge services transfer to Thameslink, with a new timetable and travel opportunities
  • Horsham to London Bridge services will transfer to Thameslink, with a new timetable and travel opportunities
  • Anyone travelling from London Bridge to East Croydon (and onward interchange) will see a significant uplift in services
  • Thameslink services diverted to Crystal Palace start to call again at London Bridge
  • New Thameslink services between Luton and Rainham
  • Catford Loop – doubling off-peak services to London, bringing extra capacity on this route
  • A significant increase in frequency of trains between St Albans and St Pancras
From December 2018

  • Additional services from Littlehampton to London Bridge, through London and up to Bedford
  • Great Northern services to Cambridge will transfer to Thameslink, simplifying journey options and providing access to new destinations
  • The interconnection with the Elizabeth Line (Crossrail) presents new simplified journey options and destinations
From May 2019

  • The Sevenoaks line into London joins central London up to Welwyn Garden City with simplified services and new travel opportunities
From December 2019

  • New Thameslink services between Cambridge and Ashford

Improvements to Southern include:
From May 2018

  • The introduction of metro-style services in some London suburbs with simplified routes, increased frequency and capacity
  • New direct routes to and from the South Coast through London and up to Bedford
  • A new Sunday service between Sutton and Epsom Downs
  • A revised service on the East Coastway following extensive consultation with passenger groups
  • On the Brighton line, there will be new direct routes through London and new travel opportunities up to Peterborough
  • Anyone travelling from London Bridge to East Croydon (and onward interchange) will see a significant uplift in services
From December 2018

  • Increased frequency of services through London
  • The interconnection with the Elizabeth Line (Crossrail) presents new, simplified journey options and destinations
 

USBT

Member
Joined
5 Nov 2017
Messages
121
The information on this site seems to be slightly different to that previously announced.

https://www.railplan2020.com/

It mentions Cambridge to Brighton is starting in December 2018. the previous info we had from the consultation indicated that this would start in May. Peterborough is now mentioned in May 2018 (on the Southern services page!).
From December 2019 it now mentions Cambridge to Ashford services - the consultation had previously shown this as terminating at Maidstone East.

How many more websites with silly names are they going to put up? They only recently had www.transformingrail.com (with all the consultation phases 2 and 3 timetables downloadable). And that now links through to this "RailPlan 20/20" site, with no timetables and conflicting information.

Horsham-Peterborough was always slated for May 2018, along with Brighton-Cambridge.
 
Last edited:

USBT

Member
Joined
5 Nov 2017
Messages
121
And as well as the doublespeak on that new site there's the new URL name "Railplan2020". Is this trying to condition people for further delays to the full service beyond 2019?
 

Barn

Established Member
Joined
3 Sep 2008
Messages
1,487
How many more websites with silly names are they going to put up? They only recently had www.transformingrail.com (with all the consultation phases 2 and 3 timetables downloadable). And that now links through to this "RailPlan 20/20" site, with no timetables and conflicting information.

Horsham-Peterborough was always slated for May 2018, along with Brighton-Cambridge.

This new one is a bit strange isn't it? Flashy but with almost no content. Perhaps it's a work in progress.
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
It is a placeholder until they have the final details agreed with Network Rail and then a full timetable options will be put up. They haven't advertised it as far as I am aware and we probably only got to it via "transformingrail" website which has completed its purpose now. So it is probably not fully ready yet!
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,865
Location
UK
And as well as the doublespeak on that new site there's the new URL name "Railplan2020". Is this trying to condition people for further delays to the full service beyond 2019?

It'll be like Thameslink 2000, so the 20/20 actually means 2050 or something..!
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
There are a number of Railplan 20/20 posters already up on the Thameslink Network.

Nothing seen down our end yet (at least by me anyway) but then they forget we are part of Thameslink because we are south of the river.

GTR said they were not advertising the changes until end of February, unusual for anything on GTR to be early - any pictures?
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,350
Location
Hertfordshire / Teesdale
How many more websites with silly names are they going to put up? They only recently had www.transformingrail.com (with all the consultation phases 2 and 3 timetables downloadable). And that now links through to this "RailPlan 20/20" site, with no timetables and conflicting information.

Horsham-Peterborough was always slated for May 2018, along with Brighton-Cambridge.

Maybe powers that be are getting seriously cold feet - GN performance has badly dipped recently, although it's not entirely clear why.
 