Speaking to various sources in the know, what may have been the cause here is the excessive heat that has been generated from the electromagnetic braking system, which may have resulted in a serious episode of brake fade.
The 398’s primary braking system is an electronic, regenerative braking system, combining a hydraulic disc system for lower speeds. The heat from the system dissipates, but in this case, the wheel set has overheated, excessive running at high speeds and stop start work maybe? Trams don’t usually travel around all day at these speeds.
The only backup is a magnetic system which applies to the rails, and that also supposedly didn’t work either when it was demanded by the crew. There is also a lack of fire detection on the units and crews would be unaware of a fire on the unit.
Aslef have apparently pulled the training course too. And a similar incident of unresponsive controls happened on the pilot course, but was still signed off!
The system on the valleys, using beacons and discontinuous electricity, has been designed around the 756 units as a test bed. There are still a load of readability issues, and a lot of these would make the 398’s sitting ducks due to the less robust design.
Also running in multiple, the ASDO system is only working on the front unit, meaning the doors on the second unit do not release as commanded. The only work around is for drivers to disable to system, which then removes the correct side enable protection. The camera system is also very poor, and in rain the driver cannot see.
I’m sorry to be repeatedly negative, but I can’t see these things happening. They need to cut the loss and look at alternatives.
The May times they’ve promised are not going to happen, the mainline is going to short of units for the uplift they require.
They had planned to have them out for June, but this is not happening now.