Given that the Core Valley Lines is devolved infrastructure, Welsh Government should be getting Barnett consequential funding from UK Government for it's ongoing maintenance. If it's not then that should absolutely feature in the discourse of the upcoming election (and any further discussion of this will need to be in the 'South Wales Metro' thread')
Indeed, that's a whole subject on its own, but it's true!
As for the 398s, the primary issue is the fact they are designed for a fully electrified network of light rail that TFW/Amey did not build. Yes, they can go onto rails, but this is a tram with add-ons, not a train design that can go onto roads.
They have unique quirks that were overlooked dearly, and without a full redesign, the system is flawed before it starts. It's a non-starter, as they call it.
Some of these quirks, if you're interested, include a hydraulic brake system that needs to be manually pumped off if the brakes jam on. This can happen on the tight curve leaving Taffs Well when coupled up, due to coupler bounce if the unit goes too quickly.
The windows, headlights and other elements don't meet RSSB specifications. Windows were changed to the wrong spec; water is pouring into electrics in the roof when it rains, and you've ended up with yellow stickers on the coupler housing.
The rescue procedure is a challenge on its own and requires two units, one in the back and one in the front. One unit on battery is not powerful enough, and the batteries are time-critical. Electrical power is also not transferable between a good and a dead unit. If the power then dies, there is no way of raising the pantograph or getting the units back on the juice, as there is no processing power available.
They could go for an adaptive coupler. However, due to the tight curve to enter the depot at Taffs Well, it would need to be a custom-designed unit. Also, the valley network is limited in terms of crossover locations to form a wrong-direction move.
The braking, which is a combined hydraulic and magnetic system which applies to the rails, is also not suitable to the atmosphere in the valleys. Constant changing temperatures, with mainly damp conditions in places are causing wheels to lock and slide. They were okay on the test track back and forth for 6 hours a day; stop-and-start running at heavy rail speed is not good for them at all. They were also tested at Old Derby without the beacon system they will be using and to a reduced set of standards set by the Welsh Government. All this because they couldn’t achieve the required hours fault free.
Then there's the big elephant in the room, and that's the door procedure. They want to run with the DCO with cameras. They've already paid the drivers to do it as part of DRI3, where the mainline apparently outvoted the valleys to get a higher salary than neighbouring TOCs in the area. It's not working, and they won't budge or come to a compromise on driver open/guard close.
Combine the above with a network that is limited in capacity to the amount of trains you can run on the OLE, currently a max of 13 flirts at a time. A depot you have no use for, areas full of spare crews being paid to play pool, darts, etc, that can go home after 6 hours if they are not needed.
This is the reality of the metro, that has cost the tax payer a huge sum of money already. They are lucky they have the flirts, which are also now showing signs of wear and are too costly to repair. Once the 150's are gone, they will be in serious trouble.