Haywain
Veteran Member
- Joined
- 3 Feb 2013
- Messages
- 24,480
Such as?some of whom may even be TfL's fault.
Such as?some of whom may even be TfL's fault.
Agreed. Previously, the excuse was Covid. Now, expect any project delays to be attributed to the cybersecurity incident - Overground line renaming, 5G rollout, 2024 stock, Crossrail 2, Victoria line 2060 stock.They cannot hide behind it and delay refunds, journey corrections for much longer. They need to issue guidance to customers about how they are going to deal with things as soon as possible,
Hypothetically? Someone who has very low income, works on an extreme budget.Such as?
They do, and this is it. Contactless is working, but in a degraded mode.Doesn't every large organisation have a disaster recovery plan, with backup systems in place which can be used to keep services working while the recovery is in place?
For example, a while ago, the IT system at Hong Kong Airport went down, and the result was that the flights were written by hand using a notice board. In this case, why can't TfL process Zip Oyster applications using pen and paper, and non network connected systems?