Now available is TFL’S RECOMMENDATIONS FOR THE HIGH LEVEL OUTPUT SPECIFICATION FOR 2014 – 2019.
In this document TfL makes its recommendation on what it wants investment directed towards.
Here's a highlight of what services TfL wants changed:
- Train and platform lengthening to five cars on all London Overground services on the North, West and East London Lines
- Additional two tph peak service between Crystal Palace and Dalston Junction operated by five-car London Overground services
- Train and platform lengthening to eight cars on all South Central services on the West London Line
- Additional two trains per hour (tph) all day shuttle between Clapham Junction and Shepherds Bush operated by eight car South Central services
- Train and platform lengthening to four cars and electrification on all London Overground services on the GOBLIN
- Additional segregated tracks to allow new four tph all stations service between Brimsdown and Stratford with removal of some station calls from longer distance services to enable faster journeytimes
- Enhanced turnback facilities to allow additional two tph peak
service between Cheshunt and Seven Sisters
- Train lengthening to up to 12 cars on selected peak services to/from Shoeburyness, Southend Central and Laindon
- Train lengthening to up to 12 cars on selected peak services to/from Shoeburyness, Thorpe Bay, Southend Central and Pitsea, via both Rainham and Ockendon
- Train lengthening to up to 12 cars on most peak services that run fast between Bromley South and Victoria that can be lengthened without infrastructure enhancements (services to/from Ramsgate and Gillingham)
- Additional two tph off peak all stations service between Bromley South and Victoria with stops in selected peak services at Peckham Rye and Denmark Hill
- Train and platform lengthening to 12 cars on selected peak services between London Bridge and Norwood Junction and
Crystal Palace
- Train lengthening to eight cars on selected peak services between Uckfield and London Bridge
- Train lengthening to 12 cars on all peak services to/from Woking that run fast between Surbiton and Waterloo
- Train and platform lengthening to up to 12 cars on selected peak services to/from Alton, Farnham and Aldershot, via both Woking
- Train and platform lengthening to 12 cars on peak services to/from Reading
- Train lengthening to eight cars on selected peak services to/from Oxford, using cascaded class 319s from Thameslink
In total, 386 extra vehicles would be provided by these schemes, making 3828 extra vehicle-trips over the traffic day.
In this document TfL makes its recommendation on what it wants investment directed towards.
Here's a highlight of what services TfL wants changed:
- Train and platform lengthening to five cars on all London Overground services on the North, West and East London Lines
- Additional two tph peak service between Crystal Palace and Dalston Junction operated by five-car London Overground services
- Train and platform lengthening to eight cars on all South Central services on the West London Line
- Additional two trains per hour (tph) all day shuttle between Clapham Junction and Shepherds Bush operated by eight car South Central services
- Train and platform lengthening to four cars and electrification on all London Overground services on the GOBLIN
- Additional segregated tracks to allow new four tph all stations service between Brimsdown and Stratford with removal of some station calls from longer distance services to enable faster journeytimes
- Enhanced turnback facilities to allow additional two tph peak
service between Cheshunt and Seven Sisters
- Train lengthening to up to 12 cars on selected peak services to/from Shoeburyness, Southend Central and Laindon
- Train lengthening to up to 12 cars on selected peak services to/from Shoeburyness, Thorpe Bay, Southend Central and Pitsea, via both Rainham and Ockendon
- Train lengthening to up to 12 cars on most peak services that run fast between Bromley South and Victoria that can be lengthened without infrastructure enhancements (services to/from Ramsgate and Gillingham)
- Additional two tph off peak all stations service between Bromley South and Victoria with stops in selected peak services at Peckham Rye and Denmark Hill
- Train and platform lengthening to 12 cars on selected peak services between London Bridge and Norwood Junction and
Crystal Palace
- Train lengthening to eight cars on selected peak services between Uckfield and London Bridge
- Train lengthening to 12 cars on all peak services to/from Woking that run fast between Surbiton and Waterloo
- Train and platform lengthening to up to 12 cars on selected peak services to/from Alton, Farnham and Aldershot, via both Woking
- Train and platform lengthening to 12 cars on peak services to/from Reading
- Train lengthening to eight cars on selected peak services to/from Oxford, using cascaded class 319s from Thameslink
In total, 386 extra vehicles would be provided by these schemes, making 3828 extra vehicle-trips over the traffic day.