• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Tender Couplings

Status
Not open for further replies.

tynesider

Member
Joined
25 Dec 2009
Messages
128
Hi folks

Apologies for this rather random query, but I was just wondering if anyone could advise of how the semi-permanent couplings, between engine and tender, on steam locomotives function.

There's this video on YouTube - http://www.youtube.com/watch?v=d_mUniyC23k - but it doesn't give much away.

When I've seen locomotives without-tender, the coupling appears to be a simple bar with a hole in, presumably to drop a pin through. However, the video would suggest that the coupling process is a bit more complicated.

Any info greatly appreciated, thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jamieP

Member
Joined
27 Feb 2012
Messages
311
With the A4 tender shown in the video you have the main pin/ draw bar the keeps the tender and engine together. This runs through the rubbing plate and has a hole at each end that you drop a pin through to couple engine and tender together. You then have 2 emergency bars either side that couple to engine and tender with pins as well. That's it coupling wise. You then just have the water/ steam heat and brake connections.
 
Status
Not open for further replies.

Top