Yapton is a good example can't remember if both ways but over the crossing there by that derelict house... just approaching Barnham
people get up by mistake prematurely
been a TSR there for as long as I can remember

Must be a good reason and sorry if been explained

Any more long term temporary speed restrictions?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,903
Yapton is a good example can't remember if both ways but over the crossing there by that derelict house... just approaching Barnham
people get up by mistake prematurely
been a TSR there for as long as I can remember

Must be a good reason and sorry if been explained

Any more long term temporary speed restrictions?

It's there to reduce the risk of a collision at the level crossing, as it is routinely misused / abused by motorists. It stays on until the LX is converted to MCB-OD.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,581
Location
Lancashire
In that case shouldn't it be made a Permanant Speed Restriction rather than a TSR?
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,644
Location
Hampshire
The South Western used to have two pretty prominent TSR restrictions that wouldn't go away - The bridge over the River Avon down in Christchurch had one for many years which remained as a TSR, just renewed every few weeks. While the somewhat notorious diamond crossing at Basingstoke, re-laid at great expense back in 2007 has also nearly always had a TSR slapped on it. It was down to 15 last month for trains coming down from the Reading direction, it's now down to 10.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,333
Location
Herts
Much of it depends on the TOC's and FOC';s to challenge - some are lost in the mists of time ....e.g on the Pembroke Dock branch.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
In that case shouldn't it be made a Permanant Speed Restriction rather than a TSR?

I disagree. A PSR would be much harder to replace. We had a TSR at Stowmarket for 25yrs & the second the silly foot crossing was closed permanently the line speed went from 60 to 100 overnight. I dread to think how long that would've taken otherwise. It's bad enough trying to get an EMU PSR altered to MU.
 

neilb62

Member
Joined
11 Nov 2015
Messages
267
Location
Darwen.
IIRC the 20 'temporary' through Preston on the Slows has been on for something like 25 years?
 

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,311
The South Western used to have two pretty prominent TSR restrictions that wouldn't go away - The bridge over the River Avon down in Christchurch had one for many years which remained as a TSR, just renewed every few weeks. While the somewhat notorious diamond crossing at Basingstoke, re-laid at great expense back in 2007 has also nearly always had a TSR slapped on it. It was down to 15 last month for trains coming down from the Reading direction, it's now down to 10.

The 20 at Farnham since the bank collapse is there indefinitely, and there was a 20 at Barnes for about three years. A footpath crossing related 25 has gone down at Staines recently, I dread to think how long it'll last...
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,393
There's one north of Muir of Ord station which has been there for years.
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
There's one to the west of Partick that feels like it's been there for years; 10/40 (40 PSR) over one of the old bridges (maybe the one over the end of Sandyford St?).
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,566
IIRC the 20 'temporary' through Preston on the Slows has been on for something like 25 years?

The 20 itself has been in force for around 10 years having previously been 30/35 since dinosaurs roamed the earth.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
One at portcreek has been there for at least 5 months. It's not quite in the same scale as 5 years, but it's long enough. The up fast through Basingstoke over the previous mentioned junction is 50 instead of whatever it should be.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
There is no such mechanism as a PSR these days, as all speeds are signed and we don't have a "linespeed" in the SA any more. As The Planner says, to make a TSR permanent requires a change to the SA, network change and (theoretically) a risk assessment (as you will probably introduce massive signal overbraking, unless the TSR was to deal with underbraking ...) not that the RA seems to be common practice.

Exactly the same procedure would be required to remover the PSR, but would be far more painful as the RA would have to cover every discipline in detail.

The only downside of long-standing TSRs is putting the signs back up after vandalism and the dent it makes in the engineering allowances.

My vote for long-standing TSR is the 25 over Castlefield Junction, 20 years and counting but only about 100m long.
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Cricklewood South Junction on the Up Fast has been 50 for passenger trains for a long time.
 

Bromley boy

Established Member
Joined
18 Jun 2015
Messages
4,609
Sevenoakes tunnel has a long standing 50mph TSR which I believe has been in place for several years.

It's due to the poor state of the tunnel's interior so I imagine it will remain in place until until NR get round to repairing it.
 

Tom m

Member
Joined
28 Mar 2016
Messages
28
There is a temporary restriction at the end of platform 1 at staines since before Christmas, not sure what it relates too but seems a long time for a temporary restriction
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,903
Sevenoakes tunnel has a long standing 50mph TSR which I believe has been in place for several years.

It's due to the poor state of the tunnel's interior so I imagine it will remain in place until until NR get round to repairing it.

It needs some big blocks to do it....
 

Bromley boy

Established Member
Joined
18 Jun 2015
Messages
4,609
It needs some big blocks to do it....

Any idea what the plan is to repair it?

I know Strood tunnel was shut for a couple of years to be relined. I can't see them doing that with Sevenoakes tunnel somehow.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,903
Any idea what the plan is to repair it?

I know Strood tunnel was shut for a couple of years to be relined. I can't see them doing that with Sevenoakes tunnel somehow.

Strood (and Higham) tunnels were shut for a few months rather than years. (I was fortunate enough to have a visit at the end of the works).

I don't know the latest plan for Sevenoaks unfortunately. But as you say, it is unlikely to be a several month shut down.
 

mr_moo

Member
Joined
7 Sep 2009
Messages
656
Location
Cambridgeshire
The up fast through Basingstoke over the previous mentioned junction is 50 instead of whatever it should be.

It should be 90 but it has hardly ever been that. It's problems to do with the diamond crossings behaving badly and the short rail lengths creating track alignment distortion.

There is a potential proposed solution in development so hopefully in 6 months or so the TSR will disappear, but it's not certain yet.

The longer term solution will the the flyover or the North (of the station) bypass lines, both of which have been ideas for years but never really turned into anything like a proper funded proposal. One day maybe! :)
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,522
Location
Taunton or Kent
When the Higham and Strood tunnels were in a bad way, was the speed restriction technically temporary for the years it was there, before it's 2004 reinforcement to raise the speed from 20 to 70mph?
 

Ships

Member
Joined
25 Apr 2013
Messages
338
There is no such mechanism as a PSR these days, as all speeds are signed and we don't have a "linespeed" in the SA any more. As The Planner says, to make a TSR permanent requires a change to the SA, network change and (theoretically) a risk assessment (as you will probably introduce massive signal overbraking, unless the TSR was to deal with underbraking ...) not that the RA seems to be common practice.

Exactly the same procedure would be required to remover the PSR, but would be far more painful as the RA would have to cover every discipline in detail.

The only downside of long-standing TSRs is putting the signs back up after vandalism and the dent it makes in the engineering allowances.

My vote for long-standing TSR is the 25 over Castlefield Junction, 20 years and counting but only about 100m long.

Fun and games with TPE and the new time table with that one!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
Stays at 25mph as part of Ordsall Chord anyway doesn't it? Would have been factored into any timetable if so.
 