Shame I've heard they are temporary and will be changed when the box migrates to York (I still think it's too busy of a crossing for it to be OD).

Presumably they'll be able to knock the box down at that point and then put in standard barriers? Though I think it's going to be some years yet before that box and the others on the line end up going to York!

They are the first but won't be the last, NR will be watching closely and adapting to other areas in the county.

Wow, Redcar on the cutting edge of technology and blazing a trail for others to follow :lol:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,601
Location
Scotland
Though I think it's going to be some years yet before that box and the others on the line end up going to York!
Remember though that 'temporary' and 'stopgap' have a different meaning on the railway to what they mean in normal life.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,079
Location
Redcar
Remember though that 'temporary' and 'stopgap' have a different meaning on the railway to what they mean in normal life.

Very true! How long did that temporary concourse at Kings Cross last again? :lol:
 

Ediswan

Established Member
Joined
15 Nov 2012
Messages
3,418
Location
Stevenage
The new barriers look nice. I wish them well. New things do need to be tried. But a few things bother me.

If somebody does attempt to slalom through closing barriers, and bends one so that it jams, they look like they will be relatively hard work to remove and replace.

Sooner or later, somebody is either accidentally or intentionally going to poke something in between the bars while they are moving. What happens next ?

Hopefully they will never get seriously iced up. Defrosting that arrangement in order to close the barriers would not be simple.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,256
The new barriers look nice. I wish them well. New things do need to be tried. But a few things bother me.

If somebody does attempt to slalom through closing barriers, and bends one so that it jams, they look like they will be relatively hard work to remove and replace.

Yes, that had occurred to me too.

Many full barrier crossings near me (Hampshire) seem to have spare booms permanently stored just adjacent to them, waiting for the inevitable collision damage, and you'd expect they can be fitted quite quickly by a few blokes with normal tools who'd show up in a NR van...
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,601
Location
Scotland
Sooner or later, somebody is either accidentally or intentionally going to poke something in between the bars while they are moving. What happens next ?
My guess is that the lack of motion and increased current draw would trigger a recycle (open and close), if that fails they will stop in their current position and the signalman won't be able to clear the controlling signals.
 

Skutter

Member
Joined
15 Mar 2015
Messages
98
Sooner or later, somebody is either accidentally or intentionally going to poke something in between the bars while they are moving. What happens next ?

Hopefully they will never get seriously iced up. Defrosting that arrangement in order to close the barriers would not be simple.

It looks like the bars are covered by clear plastic sheets, so there is no trap hazard. The only images I can find were taken at night so it's not too obvious.

I'm interested to see what the deflection is when the wind is blowing, and how accurately the gates need to hit those end stops.

Some manufacturer's publicity blurb and interesting installation photos on EDS UK website
 
Joined
14 Aug 2012
Messages
1,070
Location
Stratford
Could the refference to high winds in the above quote be relevant to the design?

Spot on I think, normal barriers in constant gale force winds will forever be broken, not only that but if one snaps and cracks someone on the head then I am sure NR will be sued
--- old post above --- --- new post below ---
It looks like it will cost quite a fortune more than a conventional gate to fix when it inevitably gets rammed by some motorist at some point. However, it should at least prevent the said errant motorist from reaching the track; it looks quite robust.

Not really, if a car does hit and damage the gate they will fix it ASAP then will claim on the drivers insurance
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,079
Location
Redcar
I think, so far, it's been working well. Certainly I can't recall hearing about the road being closed at any point and we have had few windy days! Good work from Network Rail I would have said.

One interesting thing is that it appears that it is still being babysat by a pair of contractors as there always seems to be a van (not a Network Rail one) with two guys sat in it watching it operate. It's been in place for a while now so I would have thought any teething troubles would have manifested and been fixed by now!

Any word on if anywhere else is going to get this type of barrier? I see up thread someone mentioned it was being looked at.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Any word on if anywhere else is going to get this type of barrier? I see up thread someone mentioned it was being looked at.

Bogton Sewage Works L.C. in Forres will be getting sliding gates as part of the Aberdeen - Inverness upgrade.
 
Joined
14 Aug 2012
Messages
1,070
Location
Stratford
One interesting thing is that it appears that it is still being babysat by a pair of contractors as there always seems to be a van (not a Network Rail one) with two guys sat in it watching it operate. It's been in place for a while now so I would have thought any teething troubles would have manifested and been fixed by now.

See that when I was up there a few weeks ago but they both had their own vehicles though, probably a 6 month contract
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,079
Location
Redcar
Bogton Sewage Works L.C. in Forres will be getting sliding gates as part of the Aberdeen - Inverness upgrade.

Ah interesting. Thanks :)

See that when I was up there a few weeks ago but they both had their own vehicles though, probably a 6 month contract

June is what I've heard from a nosy non-railway person who decided to strike up a conversation with them one day.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
One interesting thing is that it appears that it is still being babysat by a pair of contractors as there always seems to be a van (not a Network Rail one) with two guys sat in it watching it operate. It's been in place for a while now so I would have thought any teething troubles would have manifested and been fixed by now!

It may be, (non-manifest omnipotent creator of choice) forbid, that someone forgot to plan in any training for the NR maintenance teams ...
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,554
Location
Torbay
It may be, (non-manifest omnipotent creator of choice) forbid, that someone forgot to plan in any training for the NR maintenance teams ...

Being a new product (for the railway) in a pilot installation it is probably sensible to provide this level of cover by specialist workers for an initial limited period until any unexpected bugs are shaken out. The supplier may have agreed at least partially to cover the cost perhaps as part of the warranty, and with the prospect of further orders in future it could be in their interests to keep the new client sweet.
 