TBM Cost per mile?

Status
Not open for further replies.

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
I was wondering what the cost per mile was of a TBM bored single track tunnel? @Bald Rick suggested that the TBM was c £10m in 2019, and I was wondering what the total cost of a tunnel about 1.9km / 1.2 miles long would ballpark be?

Many thanks

Toby
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
About £10m as a starting point for a standard gauge TBM is roughly right, there is economies of scale up to about 10-15km as you get more from your investment in a tbm at which point the machine would be exhausted and you would need to buy a second to go further.

Heres a good breakdown for High Speed Rail tunnelling, for a standard gauge rail tunnel reduce the cost by about 25-50%.

 

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
About £10m as a starting point for a standard gauge TBM is roughly right, there is economies of scale up to about 10-15km as you get more from your investment in a tbm at which point the machine would be exhausted and you would need to buy a second to go further.

Heres a good breakdown for High Speed Rail tunnelling, for a standard gauge rail tunnel reduce the cost by about 25-50%.

Thanks very much - c. £15m/km... which makes my 2km tunnel under Wadebridge to a new station site on top of a CPO'd Lidl to allow trains to run through to Padstow a rather pricey option to avoid CPO'ing houses!

I'm still intrigued about where the proposed reopening to Wadebridge would actually put Wadebridge station unless you were going to CPO a small housing estate to get back to the old station.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
I was wondering what the cost per mile was of a TBM bored single track tunnel? @Bald Rick suggested that the TBM was c £10m in 2019, and I was wondering what the total cost of a tunnel about 1.9km / 1.2 miles long would ballpark be?

Many thanks

Toby

The tbm is about £10m, the cost per mile is about £100m. Portals aren’t cheap. The HS2 doc is a good guide but a little old and the prices need to be lifted.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
Slightly related but I seem to remember reading probably in Modern Railways that when you took into account the huge costs of legalities, land purchase etc the cost of tunnelling was not much more than over the top.
Definatly the best way go cross the Pennines as its weatherproof.
K
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
Slightly related but I seem to remember reading probably in Modern Railways that when you took into account the huge costs of legalities, land purchase etc the cost of tunnelling was not much more than over the top.
Definatly the best way go cross the Pennines as its weatherproof.
K

You still need all the legalities to build a tunnel, but it is somewhat easier. Across open country it is definitely much cheaper above ground, otherwise HS2 would be in Tunnel the whole way.
 

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
You still need all the legalities to build a tunnel, but it is somewhat easier. Across open country it is definitely much cheaper above ground, otherwise HS2 would be in Tunnel the whole way.
Either way tunnelling under Wadebridge seems unlikely to be vfm...
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
The new Gotthard Base Tunnel project reportedly cost CHF 9.5 billion, or about £6 billion.
That produced twin 35-mile tunnels under the Alps, so 70 miles of tunnel fit for 250km/h.
I think that works out at £114m per mile of single bore.
There were significant portal and realignment works at each end, plus central access shafts, which are included in the cost.
The numerical delivery cost increased by 50% between go-ahead and completion (17 years).
Construction also cost 9 lives.
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,097
Location
Near where the 3 ridings meet
The new Gotthard Base Tunnel project reportedly cost CHF 9.5 billion, or about £6 billion.
That produced twin 35-mile tunnels under the Alps, so 70 miles of tunnel fit for 250km/h.
I think that works out at £114m per mile of single bore.
There were significant portal and realignment works at each end, plus central access shafts, which are included in the cost.
The numerical delivery cost increased by 50% between go-ahead and completion (17 years).
Construction also cost 9 lives.

Did they renew the TBM's after 15km as per post earlier.
 

marko2

Member
Joined
28 May 2016
Messages
67
it surely depends on the geology the tunnel passes though. In London is either clay or chalk, which is fairly soft. The Pennines might be a different matter.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
it surely depends on the geology the tunnel passes though. In London is either clay or chalk, which is fairly soft. The Pennines might be a different matter.

Not really, believe it or not. The costs of tunnelling (once approval is granted) are mostly around setting up the portals, access to the site, disposing spoil and the lining / grouting.

If anything, it would be easier in the rock beneath the Pennines, as you don’t have to worry about ground settlement as much. The bigger issue there will be water, and for comparison there is more than enough of that under London.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Did they renew the TBM's after 15km as per post earlier.

Looks like they used 4 TBMs (2 in each tunnel) and each one bored about 15 miles of tunnel.
No idea if they were renewed en route, but I seem to remember that the Channel Tunnel undersea TBMs each stopped twice for a month or so for a refit.
It involved replacement of the cutting heads and repairs and improvements to the spoil train.
The Channel Tunnel was largely through shallow soft chalk which I imagine might be similar to the Chilterns, rather than hard alpine rock at great depth on the Gotthard.
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,311
The new Gotthard Base Tunnel project reportedly cost CHF 9.5 billion, or about £6 billion.
That produced twin 35-mile tunnels under the Alps, so 70 miles of tunnel fit for 250km/h.
I think that works out at £114m per mile of single bore.
Apologies but isn't £6bn divided by 70 approx £86m? Or am I missing something?
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,762
The tbm is about £10m, the cost per mile is about £100m. Portals aren’t cheap. The HS2 doc is a good guide but a little old and the prices need to be lifted.
How long does a tunnel need to be for it to need a portal structure - i.e. ventilation and controls and whatever else they include?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Apologies but isn't £6bn divided by 70 approx £86m? Or am I missing something?

It certainly is.
I must have mixed up the CHF and km conversions somewhere.
But either way, not massively at variance with £100m/mile estimate.
You'd expect to get more economies of scale with a long tunnel.
And £10m for a replacement TBM is practically noise on the total figure.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
How long does a tunnel need to be for it to need a portal structure - i.e. ventilation and controls and whatever else they include?

A portal is just the entry/exit from the tunnel, so even a hypothetical metre long tunnel would need two of them (unlikely as a 1m long tunnel is to exist!)
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,762
A portal is just the entry/exit from the tunnel, so even a hypothetical metre long tunnel would need two of them (unlikely as a 1m long tunnel is to exist!)
Yes and no, if you look at contracts like HS2 and Crossrail they have separate contracts for portal structures, which are AFAIK much more significant than just the the bit at the mouth of the tunnel. They cost £50m or more so there must be more to it than simply the beginning and end of the tunnel
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I can't see any standalone contracts for tunnel portals on HS2. Crossrail have a handful of standalone ones (Royal Oak, Victoria Docks, Pudding Mill Lane), whilst Woolwich is lumped in together with the station box there. The expensive (>£50m) ones at Pudding Mill and Royal Victoria Docks both included moving the DLR around to fit the portals in, which will go some way to explaining the cost. Royal Oak Portal was in the £5-25m category, although I can't see anything about what the actual final cost was

I also stand corrected about a hypothetical metre long tunnel, as HS2's document says that they can be several hundred metres long to transition from ground level to the tunnel level! Quoting:

Portals are approximately 30m wide structures that allow trains to travel between ground level and the bored tunnel headwalls (and vice versa), at gradients no steeper than 3%. The depth of the portal (rail level) at the tunnel’s headwall must be at least twice the diameter of the tunnel, or about 20m, below ground level in order to safely commence bored tunnelling. In flat topography portal structures may be approximately 700m long, but where tunnels pass under a hillside and ground levels are rising, the portal structures will be shorter. Portal structures are typically constructed of concrete and comprise parallel concrete ground retaining walls with a concrete base. In some circumstances the portal is also required to be propped close to ground level using either permanent individual concrete props or a roof slab. A specific design feature associated with high speed trains travelling through tunnels is the need to control the air pressure pulse that is created in front of the train as it enters a tunnel. This is achieved through the introduction of ‘porous’ portal hoods, comprising enclosed portal structures with openings.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
How long does a tunnel need to be for it to need a portal structure - i.e. ventilation and controls and whatever else they include?

Others have answered, but it depends. Typically a portal is either diving down to the tunnel, or the ground is rising up around it. The former are more expensive, but not that much.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,220
Apart from basic construction costs, tunnels also come with additional operating costs, for drainage (rain and groundwater), flood protection, ventilation, fire protection, emergency lighting, evacuation procedures, etc. Regulations for these have increased notably in recent times.
 

squizzler

Established Member
Joined
4 Jan 2017
Messages
1,912
Location
Jersey, Channel Islands
There is a lot of comparative data for costs of doing things in different countries on Alon Levy's excellent blog. Here is a post comparing the costs of tunnelling (and other structures) for metro construction in New York and Paris.

Tunneling: about $150 million per km vs. $90 million, a factor of 1.7
Stations: about $750 million per station vs. $110 million, a factor of 6.5
Systems: about $110 million per km vs. $35 million, a factor of 3.2
Overheads and design: 27% of total cost vs. 15%, which works out to a factor of about 11 per km or a factor of 7 per station
 

squizzler

Established Member
Joined
4 Jan 2017
Messages
1,912
Location
Jersey, Channel Islands
To which I would ask: How is the geology different and are the easier conditions be to be found in Paris or NYC?

The linked blog - Pedestrian Observations - is strongly of the opinion that the cost differential is for too great to be explained by differing local conditions. The author's work is thorough and covers most aspects of HSR and metro construction costs. Contributors to the various electrification threads lamenting UK costs will find mileage (pun not intended) in his national comparison of wiring costs per km.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,887
Location
Fenny Stratford
Shall we just agree that the sum is more that a shed load but less than a truck load?

it is surely so varied based on geology, depth, width, water table, ventilation, fire suppression etc etc etc
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Shall we just agree that the sum is more that a shed load but less than a truck load?
Going by the estimates on this thread, even a truckload of credit cards with £10,000 spending limits would not buy you very much tunnel.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
There is a lot of comparative data for costs of doing things in different countries on Alon Levy's excellent blog. Here is a post comparing the costs of tunnelling (and other structures) for metro construction in New York and Paris.

Tunneling: about $150 million per km vs. $90 million, a factor of 1.7
Stations: about $750 million per station vs. $110 million, a factor of 6.5
Systems: about $110 million per km vs. $35 million, a factor of 3.2
Overheads and design: 27% of total cost vs. 15%, which works out to a factor of about 11 per km or a factor of 7 per station
Very different geology.

Different geology, different station sizes, different systems, different politics.
 

squizzler

Established Member
Joined
4 Jan 2017
Messages
1,912
Location
Jersey, Channel Islands
Different geology, different station sizes, different systems, different politics.
It is not helpful to say that without making some attempt at quantifying what these differences mean. The beauty of the 'Pedestrian Observations' is that its author is a skilled mathematician who can interrogate the data from projects over the world to find out what it is that is accounting for the difference in costs. He is also articulate enough to make it understandable to a lay audience. For amateur scholars of transport provision, of which were are many on this forum, it is a great resource and I make no apologies for keeping bringing it up.

Some variables like the geology are what nature deals you, but the good news is that ground conditions seem not to account for as big a difference as people might think. I got the impression that building around a legacy system (like what UK must do in London) adds more cost.

Stuff we do have control over like the institutional culture and building practices seem to account for the lions share of cost differences. If we have the data to show what savings might be on the table, we can choose whether or not we want to change to implement them. This blogger has lived in big cities both siders of the pond and has had the chance to compare numerous national cultures. Of course there are those who would happily keep paying over the odds rather than admit 'Johnny Foreigner' might be doing things better than us, this blog is not for them :)
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,762
Others have answered, but it depends. Typically a portal is either diving down to the tunnel, or the ground is rising up around it. The former are more expensive, but not that much.
I've obviously got the wrong end of the stick somewhere, as I believed 'portal structures' to be more than just the bit where the track enters the tunnel, such as at Pudding Mill lane for crossrail where there is a big cut and cover section and the ventilation plant etc.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,549
Location
Torbay
I've obviously got the wrong end of the stick somewhere, as I believed 'portal structures' to be more than just the bit where the track enters the tunnel, such as at Pudding Mill lane for crossrail where there is a big cut and cover section and the ventilation plant etc.
Portal in tunnels is a special usage for the entrance opening. Portal frame is a rigid integrated structure of column and beam, usually in steel, used for spanning a wide area such as in warehouse construction. Historically, portal usually refered to an important doorway in a major building. Must be related to French 'porte' for door.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
I've obviously got the wrong end of the stick somewhere, as I believed 'portal structures' to be more than just the bit where the track enters the tunnel, such as at Pudding Mill lane for crossrail where there is a big cut and cover section and the ventilation plant etc.

You’re quite right, but for tunnels through a hill or mountain, the track doesn’t need to dive down. The tunnel entrance is still a portal though
 
Status
Not open for further replies.

Top