It is the crux of many issues. An introduced safety system like TASS sets the benchmark going forward. It can only be replaced with something of equal or better to avoid increasing risk.
Current plan seems to be to fit ETCS to the northern WCML, which would provide TASS functionality a long with many other safety features. South of Crewe, with HS2 bypassing much of it, may revert to a 110mph railway with no tilt differentials.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Pendomonium

Member
Joined
24 Aug 2024
Messages
70
Location
Tring
Current plan seems to be to fit ETCS to the northern WCML, which would provide TASS functionality a long with many other safety features. South of Crewe, with HS2 bypassing much of it, may revert to a 110mph railway with no tilt differentials.
I did have someone tell me that serious consideration is being given to convert the Manchester - Wilmslow - Crewe route to ETCS since the Ansaldo signaling equipment is nearing end of life.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,846
Location
Land of the Prince Bishops
In this case mildly annoying may lead to a load more monitoring and mildly annoyingly having to explain yourself as to why you didnt react to DAS.

Is this a hypothetical concern or something that actually happens? Not that I'd be surprised by the latter given how the railway industry seems to infantilise its staff...
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,565
Location
Torbay
I did have someone tell me that serious consideration is being given to convert the Manchester - Wilmslow - Crewe route to ETCS since the Ansaldo signaling equipment is nearing end of life.
It's the only stretch of line in the UK with the Ansaldo technology, so must be challenging to support economically, especially as it becomes older. If the fleet using the line isn't all suitable for ETCS yet, maybe a conventional TCB resignalling project might be considered initially, made 'ETCS ready' for the future, a standard requirement today.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
I did have someone tell me that serious consideration is being given to convert the Manchester - Wilmslow - Crewe route to ETCS since the Ansaldo signaling equipment is nearing end of life.
Not happening, the equipment is being replaced with non Ansaldo conventional signalling.
 