Fgw+xc+swtconn
Member
Southwest trains not going south of exeter. Surely Not. Now hardly no trains will stop at Ivybridge. Think of Ivybridge! And why not?? what did we do wrong??? and they shouldn't be called southwest trains then... 
Have a chat with the DaFT, its their idea!
This is old news now, been well known for at least 12 months.
Now hardly no trains will stop at Ivybridge.
. Now hardly no trains will stop at Ivybridge.
I shouldn't think it'll be long before the Salisbury - Bristol services are canned by order of the DaFT.
Whilst Cross Country get criticised for pulling out of the south coast; if SWT still ran Brighton - Basingstoke/Reading, that'd give a few decent connections. Wonder if it would have been pulled if the Baskingstoke - Reading stetch could be EMU run?
The excuse being used is lack of stock
SWT have more than enough stock to carry on with the paigntons/Plymouths,
SWT have more than enough stock to carry on with the paigntons/Plymouths,
Do they really? Proof?
If I recall, another factor in not operating West of Exeter was to ensure the integrity of the hourly timetable. As the only additional infrastructure to allow this is the passing loop at Axminster, for the service to be robust requires good timekeeping. An Up service from Plymouth/Paignton that got delayed before Exeter could have a big impact on Down services to Exeter. Restricting it to Waterloo-Exeter is supposed to help this.
If SWT builds this service well, and I think with good marketing of both Advance purchase tickets and megatrain it will, then the next steps would be to look at how to strengthen services between Salisbury and Exeter. Longer term the route would surely benefit from being double tracked again, with linespeed improvements too. Future electrification to Exeter/Plymouth could also see a case built for electrification of Yeovil-Exeter as part of the diversionary route.
In ten years time we might be talking about a half-hourly Waterloo-Yeovil service, with hourly to Exeter (perhaps half-hourly in the peaks).
The next South Western franchise will have to replace the 158s/159s at some point in that (and by 2020 at the latest I think under DRA regulations), so the argument for electrification and route upgrades could kick in as part of that.
Network Rail in the Electrification RUS has identified the Basingtoke - Exeter line as having potential for electrification but at 25kv AC rather than 750c DC third rail (Network Rail say AC is more cost effective) - thus requiring units with bi-voltage potential.
Double tracking thoughout and significant linespeed increases however are likely to be very expensive if the £20m cost of the 3 mile Axminster loop is anything to go on. Network Rail's Wessex Route Plan notes that 'there may be scope to increase to 90mph certain sections of the route to Exeter which are currently limited to 85 mph'.
Do they really? Proof?
SWT services west of Exeter are usually pretty empty when Ive been on them. FGW provides enough services to cover the area, and will be adding more (including another Loco-Hauled Set!!!!)
The advantages of SWT going hourly from Exeter to waterloo FAR outweigh the disadvantages caused by a couple of trains not having to go east of exeter virtually empty anymore....
God knows where FGW are mustering extra trains to cover this as there aren't enough units to cover "Devon Metro" services within Exeter and surrounding areas.
How did they cope in the past? Were local services withdrawn when SWT extended westwards?
There have always been Network South East services west of Exeter, to places such as Plymouth and Exeter. The complimented the Intercity and fairly sparse Regional Rail services.
Devon never used to have such a decent level of service!
Thanks.
Out of interest, was that the route the Network South East 50s ran on,
Thanks.
Out of interest, was that the route the Network South East 50s ran on, or were they on the "Great Western" route?
There have always been Network South East services west of Exeter, to places such as Plymouth and Paignton. They complimented the Intercity and fairly sparse Regional Rail services.