Apologies but the contract system informed me of this after the closing date and I thought it was useful to share some of the detailAs I said in post 3107, tender deadline was 02/07
Apologies but the contract system informed me of this after the closing date and I thought it was useful to share some of the detailAs I said in post 3107, tender deadline was 02/07
All 444/450 have SWR interiors.
Out of interest, I was thinking about this the other day - I seem to remember that the original artists' impressions of the new interiors for the 444s had 3+2 seating; did this actually happen in the end?All the 444s and 450s have been completed inside for ages, IIRC it was a completely separate contract to the exterior work. Except for the couple of vinyled units, I don’t think the new livery painting started until nearly every interior was done.
I dont remember that (2+3) ever being suggested, but they did shorten the 444 first class area by making it 2+2 but still with a similar capacity as before.Out of interest, I was thinking about this the other day - I seem to remember that the original artists' impressions of the new interiors for the 444s had 3+2 seating; did this actually happen in the end?
(I've not kept up-to-date with this thread, and despite being a regular SWR user, I'm pretty much solely on 455s and 456s which - I note with some amusement - still advertise Waterloo for Eurostar services on their network maps!!)
Out of interest, I was thinking about this the other day - I seem to remember that the original artists' impressions of the new interiors for the 444s had 3+2 seating; did this actually happen in the end?
(I've not kept up-to-date with this thread, and despite being a regular SWR user, I'm pretty much solely on 455s and 456s which - I note with some amusement - still advertise Waterloo for Eurostar services on their network maps!!)
I dont remember that (2+3) ever being suggested, but they did shorten the 444 first class area by making it 2+2 but still with a similar capacity as before.
I doubt it, they are about the narrowest bodies around, 2.688m on the data plates.Would 2+3 actually fit in a 444? Aren’t they thinner (and longer) than 450s? Having said that Bombardier got 2+3 into the 720s and they’re even longer.
Nice touch with the names on the side.
== Doublepost prevention - post automatically merged: ==
A 450 has been put in a special key worker livery
I don’t like it. It looks unfinished with the white. The key worker thing is also quite cringeworthy and extremely outdated now - perhaps in May 2020 it would be appropriate but now that we’re getting back to normal a year and a bit later, it just seems out of place.
== Doublepost prevention - post automatically merged: ==
A 450 has been put in a special key worker livery
Why would they not be? What livery would they get instead?Does anyone think that the 458s SWR are retaining will be repainted into fleet livery?
I agree, and the livery looks like a rushed job; incredibly overdue too. Whilst it would have been nice to have proper name plates, it is a massive engineering undertaking, and the vinyl names look.nice.the gesture is nice but its just a bit late. if they were doing it for the 3 who lost their lives due to the virus, a plaque would've been better at Waterloo or wherever that member of staff was based. or even a named train. After all, swr have 127 450s, im sure they could name 3
This doesn’t surprise me at all - it’s SWR. The majority of their fleet is still in SWT livery, and with the 442s gone and the 701s not even in service yet, almost as if it’s still the same since they took over the franchise…the gesture is nice but its just a bit late. if they were doing it for the 3 who lost their lives due to the virus, a plaque would've been better at Waterloo or wherever that member of staff was based. or even a named train. After all, swr have 127 450s, im sure they could name 3
It’s in keeping with every project SWR have attempted: it’s at least 12 months late.the gesture is nice but its just a bit late.
I really don't understand what seems like the general malaise with SWR. It's not even as if it's stayed the same as when it first took over. It's on its third MD (the last one in particular having a very good reputation) and the franchise ended, being replaced by a National Rail Contract, yet it still feels like its just taken over from SWT..This doesn’t surprise me at all - it’s SWR. The majority of their fleet is still in SWT livery, and with the 442s gone and the 701s not even in service yet, almost as if it’s still the same since they took over the franchise…
Maybe they get a special revised livery with it being due to replaced and then retained, when that happens they either stay in the current livery or an Interim.Why would they not be? What livery would they get instead?
Maybe they get a special revised livery with it being due to replaced and then retained, when that happens they either stay in the current livery or an Interim.
Proper name plates are a massive engineering undertaking these days in terms of paperwork. Drilling holes in trains is never too popular….I agree, and the livery looks like a rushed job; incredibly overdue too. At the very least they could have bothered with proper name plates
Indeed not - I think the UK might be one of the few countries who still routinely do such a practice.Proper name plates are a massive engineering undertaking these days in terms of paperwork. Drilling holes in trains is never too popular….
That's interesting. I hadn't appreciated that, but it makes perfect sense.Proper name plates are a massive engineering undertaking these days in terms of paperwork. Drilling holes in trains is never too popular….
The 458s are not being done by Bournemouth. They will be done by Alstom at Widnes so completely independent of the Desiro repaint programme, which has been contracted by Siemens to SWR Bournemouth.going on at the pace the 444's and 450's are being repainted the franchise/contract will be finished before they get the 458's even started
Bournemouth is only doing the Desiros because it was fortunate enough to win the tender for the work. Coincidence that it happens to be part of SWR.thanks for that goldfish. I just assumed that Bournemouth were doing them.