Neither can I, likely to be about 10-15 years between the replacements of 159s and desiro fleet.
Whilst the 458 plan for Portsmouth line made sense 4 or 5 years ago as a lower cost alternative to 442s, I suspect it is not a great idea now either. Probably should only continue if need the trains in 1-3 years (as in will need, even though managing without them today)
To be honest I would be looking at 159 replacement as part of a big batch of standard regional / outer suburban bi-modes. Joining forces with GWR project Churchward team, and possibly Chiltern team and when it eventually happens GBR team. Everyone knows that lots of silly non-standard orders just adds cost, often makes them unreliable, and usually causes parts supply problems within latter part of 40 year lives.
100mph (maybe 110mph on 25kv), seats suitable for 3+ hours, doors suitable for churn stations, some dual voltage. Standard design for Waterloo-Exeter, Cardiff-Portsmouth, Cardiff-Penzance, Cardiff-Nottingham, Marylebone-Birmingham etc. Displaced IETs and 170s could find better routes where they can use their speed, or for 170s to replace 156s and other 158s etc.