• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

SWR New Timetable from May 2019

Status
Not open for further replies.

irfquake123

Member
Joined
3 Jan 2019
Messages
18
Hi

I was under the impression that the new timetable is planned to be in place in May.

Any news on this and/or draft timetables given that we are only 5 months away from May. I am particularly interested in Reading/Windsor lines post the consultation.

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,310
Sadly not, our 4tph to Reading amongst other things is currently fictitious.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,265
Welcome. I don’t think it’s all guaranteed for May at all.
There is another general thread running about May 19 changes, where someone has already noted that some of the planned Guildford/Aldershot/Farnham/Ascot area service changes appear to be happening, but that may be easier to do as it might not have as significant extra power requirements, and may not impact on other TOCs timetables.

This is the other thread: https://www.railforums.co.uk/threads/may-2019-timetable-changes.175330/
 

irfquake123

Member
Joined
3 Jan 2019
Messages
18
Welcome. I don’t think it’s all guaranteed for May at all.
There is another general thread running about May 19 changes, where someone has already noted that some of the planned Guildford/Aldershot/Farnham/Ascot area service changes appear to be happening, but that may be easier to do as it might not have as significant extra power requirements, and may not impact on other TOCs timetables.

This is the other thread: https://www.railforums.co.uk/threads/may-2019-timetable-changes.175330/


Thanks. Really disappointing given that changes were due in December :(

The reason I thought something might be happening in May was the local residents in Feltham have been told that the bridge widening by the station may not be complete before the crossing there is taken out of use. The reason being given is SWR wanting to introduce the new timetable. Given the above, it might be the council making an assumption rather than being backed up by any facts...
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,252
Thanks. Really disappointing given that changes were due in December :(

The reason I thought something might be happening in May was the local residents in Feltham have been told that the bridge widening by the station may not be complete before the crossing there is taken out of use. The reason being given is SWR wanting to introduce the new timetable. Given the above, it might be the council making an assumption rather than being backed up by any facts...
Many of the Windsor Line changes are now fairly easy to do so will probably happen in May (the council probably has things right), the other comments were around SWML service changes and the non "Portsmouth" changes being do-able but Portsmouth not (Power supply issues).
 

theironroad

Established Member
Joined
21 Nov 2014
Messages
3,717
If swr and the DfT have learnt anything from last may and the gtr and northern fiasco that is not to do a big bang style change.

Do the changes incrementally wherever possible, though sometimes larger recasting of the timetable and paths is unavoidable, especially in the congested peak time in the London area.
 

Bookd

Member
Joined
27 Aug 2015
Messages
445
Thanks. Really disappointing given that changes were due in December :(

The reason I thought something might be happening in May was the local residents in Feltham have been told that the bridge widening by the station may not be complete before the crossing there is taken out of use. The reason being given is SWR wanting to introduce the new timetable. Given the above, it might be the council making an assumption rather than being backed up by any facts...

The bus map giving details of diversions during the bridge works shows that these apply until 17.00 on 28th February 2019. Having said that if the road reopens at 16.59 on that day I will be amazed!
 

irfquake123

Member
Joined
3 Jan 2019
Messages
18
The bus map giving details of diversions during the bridge works shows that these apply until 17.00 on 28th February 2019. Having said that if the road reopens at 16.59 on that day I will be amazed!

Yes I think they have been delayed because of the crane accident and other issues. The leaflet locals have been given states that the crossing could close before works are completed...
 

irfquake123

Member
Joined
3 Jan 2019
Messages
18
Many of the Windsor Line changes are now fairly easy to do so will probably happen in May (the council probably has things right), the other comments were around SWML service changes and the non "Portsmouth" changes being do-able but Portsmouth not (Power supply issues).

Sounds good, though how far in advance are TOCs supposed to publish timetables?
 
Status
Not open for further replies.

Top