Had a bizarre issue with a delay repay claim from Shanklin to Stevenage.

Train from Shanklin was delayed causing an overall delay to my arrival time. Made a delay repay claim to SWR who have rejected the claim because the delay was caused by Island Line. They have kindly forwarded my claim to Island Line.

I now have a new claim reference number for this claim from SWR who do of course operate Island Line.

Anyone have any idea why the hell they do this sort of stuff. It seems absolutely crazy to me….
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Nova1

Member
Joined
26 May 2021
Messages
439
Location
Stratford-Upon-Avon
I've had a similar game with WMR and LNWR. LNWR were delayed making me miss my connection onto a WMR service, and they denied it and directed me towards WMR.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,194
Don't get it. Isn't the Island Line a brand of South Western Railway, and if you apply for Delay Repay, it'll be routed through the latter's website.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,574
Don't get it. Isn't the Island Line a brand of South Western Railway, and if you apply for Delay Repay, it'll be routed through the latter's website.
I have a feeling it's a seperate business unit, but someone like @bb21 might be able to enlighten us.
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,451
I have a feeling it's a seperate business unit, but someone like @bb21 might be able to enlighten us.
That is correct. Island Line had always processed their own delay claims prior to the recent upgrade as historically no one else had full access to their data on individual delays, nor were they correct in open source data feeds. Everything was done manually.

Not sure whether anything changed since the upgrade, but wouldn't surprise me if the setup continued for the time being.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,119
Update. The claim has now been approved, a cheque is apparently on it's way.

Island Line no longer has a separate website, it isn't a separate train operating company, it's just a brand of SWR. I claimed delay repay from SWR and received the usual acknowledgment. A few days later a rejection telling me that the delay was caused by another train operating company (Island Line Limited) and that my claim would be forwarded to them.

At the same time I received another delay repay reference from SWR (identical branding to the original claim) which has now been approved. Checking back I claimed delay repay from SWR following a delay on the Island in November 2019 which was paid first time with no rejection or forwarding to themselves!

The whole thing just seems so weird.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,256
Update. The claim has now been approved, a cheque is apparently on it's way.

Island Line no longer has a separate website, it isn't a separate train operating company, it's just a brand of SWR. I claimed delay repay from SWR and received the usual acknowledgment. A few days later a rejection telling me that the delay was caused by another train operating company (Island Line Limited) and that my claim would be forwarded to them.

At the same time I received another delay repay reference from SWR (identical branding to the original claim) which has now been approved. Checking back I claimed delay repay from SWR following a delay on the Island in November 2019 which was paid first time with no rejection or forwarding to themselves!

The whole thing just seems so weird.
Perhaps someone just got back to the office after 3 years on leave working elsewhere in the company… :D
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,305
Location
LBK
Update. The claim has now been approved, a cheque is apparently on it's way.

Island Line no longer has a separate website, it isn't a separate train operating company, it's just a brand of SWR. I claimed delay repay from SWR and received the usual acknowledgment. A few days later a rejection telling me that the delay was caused by another train operating company (Island Line Limited) and that my claim would be forwarded to them.

At the same time I received another delay repay reference from SWR (identical branding to the original claim) which has now been approved. Checking back I claimed delay repay from SWR following a delay on the Island in November 2019 which was paid first time with no rejection or forwarding to themselves!

The whole thing just seems so weird.
A bit bizarre. Probably some "grandfather rights" thing. How do you even make a claim with "Island Line" in the first place if they've no website?
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,574
A bit bizarre. Probably some "grandfather rights" thing. How do you even make a claim with "Island Line" in the first place if they've no website?
I would imagine the number of claims is tiny.
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,102
I would imagine the number of claims is tiny.

If the claim was purely for Island Line, I would imagine that that was the case. The journey from end to end is less than 30 minutes, so to be delayed by 15 minutes or more is probably quite unusual unless it was a breakdown.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,574
Not if you miss the ferry! Minimum hour‘s delay.
How often does that happen, and how many people are delayed? The trains generally don't carry vast numbers of people, as far as I am aware.
 

hermit

Member
Joined
23 Jul 2019
Messages
443
Location
Isle of Wight
My point was that even a sub-threshold delay on the island can easily result in a substantial claim for the overall journey. Happily so far the new trains seem to be keeping to time ok, so it won’t arise very often.
Admittedly it’s more common in the other direction -at one time evening peak trains from Waterloo could almost always be relied on to miss the ferry, but those claims would be for SWR to meet.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,574
My point was that even a sub-threshold delay on the island can easily result in a substantial claim for the overall journey. Happily so far the new trains seem to be keeping to time ok, so it won’t arise very often.
Admittedly it’s more common in the other direction -at one time evening peak trains from Waterloo could almost always be relied on to miss the ferry, but those claims would be for SWR to meet.
And my point was that passenger numbers are that low that the number of claims received by Island Line in the event of delays will be very small - small enough that having a website and automated systems to handle the claims are unnecessary. The fact that some claims might be for larger amounts doesn't affect the volume.
 