• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

SWR Class 458 to be retained

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gmaguire

Member
Joined
29 Dec 2021
Messages
237
Location
London
I assume this is the one sat Feltham yard yesterday? I noticed the issue on RTT and the disruption it caused but SWR were a bit limited in saying what it was.
At Putney I think it was announced as “a passenger being taken ill on a train”.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,775
I assume this is the one sat Feltham yard yesterday? I noticed the issue on RTT and the disruption it caused but SWR were a bit limited in saying what it was.
Everything I heard or saw said either “Broken down train at Feltham” or “Fire on a train at Feltham”.
 

45076

Member
Joined
4 Feb 2021
Messages
363
Location
Midway, South Derbyshire
Does anyone know what has happened to the former "Gatwick" trailer car taken out of the 458/4 conversions ? Presumably they will go for scrap as they are unlikely to be of use to anyone else, but have they actually been scrapped and if so where ? Alternativly, they may be in store somewhere, but if so, where ? The first two were removed at Long Marston, so might still be there, but I understand subsequent ones have been removed at Widnes and I don't expect they want them there cluttering up the place there.
I think they have sent for scrap
 

jwhite9185

Member
Joined
10 Sep 2023
Messages
34
Location
Woking
458407 just passed through Woking under its own power. Seats still wrapped up, much like most of the 701's that have passed through this year.

IMG_8438.jpegIMG_8439.jpeg
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,386
Presumably this working.
Interesting according to that to see it was in both Woking and Berrylands at the same time of 1253..!!
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
What is stopping these from entering service? Presumably all drivers/ guards are already trained as these units have operated in 4/5/8/10 car formation over the years.

Given SWR are insisting on pressing ahead with capacity reductions these really do need to be in service as 8 car units ASAP. Hopefully they are managing this conversion better than they are managing the 701 debacle.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,161
Given SWR are insisting on pressing ahead with capacity reductions
SWR are going to cut more services?! At a time when so many services can't cope with passenger numbers as it is? Where have you heard this?

== Doublepost prevention - post automatically merged: ==

Hopefully they are managing this conversion better than they are managing the 701 debacle.
Unfortunately I doubt that's the case.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,964
SWR are going to cut more services?! At a time when so many services can't cope with passenger numbers as it is? Where have you heard this?
Well, the 458/5s are slowly but steadily heading north for conversion, so unless SWR get either some 458/4s or some 701s into service, there will have to be more reductions in train lengths or numbers. Since they appear unwilling to introduce the former, and unable to introduce the latter, things will likely get worse before they get, er, less worse ("better" is probably asking too much where SWR are concerned).
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
SWR are going to cut more services?! At a time when so many services can't cope with passenger numbers as it is? Where have you heard this?

== Doublepost prevention - post automatically merged: ==


Unfortunately I doubt that's the case.
Sorry, I should have been clearer. What I meant was every time another pair of 458/5's go off for conversation a 10 car service is replaced by (at best) an 8 car which results in reduced capacity.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,706
Location
SW London
Sorry, I should have been clearer. What I meant was every time another pair of 458/5's go off for conversation a 10 car service is replaced by (at best) an 8 car which results in reduced capacity.
And if it is replaced by an eight car, it can only be by replacing two eight-car services by four (or, at best, five) cars -
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
And if it is replaced by an eight car, it can only be by replacing two eight-car services by four (or, at best, five) cars -
Yes - I can't imagine there are many 12 car services left to reduce in order take a unit to use elsewhere.

Terrible mismanagement all round. No wonder SWR are bouncing back more slowly from the pandemic then other TOC.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,161
Sorry, I should have been clearer. What I meant was every time another pair of 458/5's go off for conversation a 10 car service is replaced by (at best) an 8 car which results in reduced capacity.
Ah right, got you! And agreed! It's getting ridiculous now.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,602
Location
Croydon
Yes - I can't imagine there are many 12 car services left to reduce in order take a unit to use elsewhere.

Terrible mismanagement all round. No wonder SWR are bouncing back more slowly from the pandemic then other TOC.
My fear is that we might have the cart and the horse in the wrong order. Maybe SWR are seeing a drastic loss of income which is driving these capacity reductions. Yes we are seeing crowded trains (it was ever thus) but are they filled with fully paid up annual season ticket holders or with people buying off-peak or one day tickets ?.

More likely the introduction of 701s and conversion of 458s is an unbelievable awful fiasco. But I am just wondering how much pressure is here to supply more trains ?.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,161
More likely the introduction of 701s and conversion of 458s is an unbelievable awful fiasco.
Add the 442s to that list. That SWR managed to introduce 5 484s into service seems like a miracle, but even there despite a huge investment in the Island Line it now has its worst ever service.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,602
Location
Croydon
Add the 442s to that list. That SWR managed to introduce 5 484s into service seems like a miracle, but even there despite a huge investment in the Island Line it now has its worst ever service.
Lest we forget the 484s and the frequency ?.
 

Invincible

Member
Joined
23 Apr 2022
Messages
853
Location
Surrey
Add the 442s to that list. That SWR managed to introduce 5 484s into service seems like a miracle, but even there despite a huge investment in the Island Line it now has its worst ever service.
Looking online the island line has had strikes, some flooding and signalling failure over the last 2 months, but on RTT the 484s now seem to be running OK.

I expect there will be extensive testing of the 458s to ensure the problems of the 442s do not get repeated,there was a problem with upgrading the 442s due to inconsistant wiring which stopped the upgrade.So far the 458 mechanical/electrical upgrade is mostly gear changes to run at 100mph.
Have the upgraded 458s been tested as 100 mph 12 car units over the PDL so eventually some 450s can be moved to other parts of SWR?
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,161
Looking online the island line has had strikes, some flooding and signalling failure over the last 2 months, but on RTT the 484s now seem to be running OK.
Prior to the £27m upgrade the Island Line had a consistent 2tph, albeit at uneven headways.

Now it has 1-2tph if you're lucky and it's been realised that the passing loop reinstated at Brading is in the wrong location to allow a consistent 2tph to the pier.

That, my friend, is the well documented reason why despite the £27m investment the line has its worst ever service.
 

Monty

Established Member
Joined
12 Jun 2012
Messages
2,370
I think they have sent for scrap
Spare vehicles will be kept in storage by Porterbrook as a source of spares.
Looking online the island line has had strikes, some flooding and signalling failure over the last 2 months, but on RTT the 484s now seem to be running OK.

I expect there will be extensive testing of the 458s to ensure the problems of the 442s do not get repeated,there was a problem with upgrading the 442s due to inconsistant wiring which stopped the upgrade.So far the 458 mechanical/electrical upgrade is mostly gear changes to run at 100mph.
Have the upgraded 458s been tested as 100 mph 12 car units over the PDL so eventually some 450s can be moved to other parts of SWR?
Overspeed testing has been carried out between Eastleigh and Basingstoke.
 
Status
Not open for further replies.

Top