Goldfish62
Veteran Member
- Joined
- 14 Feb 2010
- Messages
- 13,151
The new timetable seems to have thrown up enough surplus 458s given that all the Reading peak extras have been removed. Maybe they'll start going away for refurb soon.
Unlikely immediately with the prospect of more 707s leaving the franchise without any 701s being in traffic.The new timetable seems to have thrown up enough surplus 458s given that all the Reading peak extras have been removed. Maybe they'll start going away for refurb soon.
Hopefully, they might come to Wolverton Works!The new timetable seems to have thrown up enough surplus 458s given that all the Reading peak extras have been removed. Maybe they'll start going away for refurb soon.
They’re not going to Wolverton. It’s already been stated that the 458 refurbishments are being done by Alstom at Widnes.Hopefully, they might come to Wolverton Works!![]()
Ah, I see!They’re not going to Wolverton. It’s already been stated that the 458 refurbishments are being done by Alstom at Widnes.
Why would anyone want Gemini to get more work at Wolverton?Hopefully, they might come to Wolverton Works!![]()
The workforce of Gemini presumably want the work?Why would anyone want Gemini to get more work at Wolverton?
The actual workforce will be majority contractors who will simply move onto the next project with someone else.The workforce of Gemini presumably want the work?
That'll be for the DfT to decide. Southeastern can wait for however long it takes to receive the 707s as there's no pressing need for their transfer. However, SWR need upgraded rolling stock for Portsmouth as per the erstwhile franchise commitment. It would make sense to me to press ahead with the 458 project ASAP.Unlikely immediately with the prospect of more 707s leaving the franchise without any 701s being in traffic.
However, SWR need upgraded rolling stock for Portsmouth as per the erstwhile franchise commitment. It would make sense to me to press ahead with the 458 project ASAP.
Once they have been refurbished, they are more likely going to be running on the Portsmouth fasts after having been tested. But this will not happen, until the class 701 units start operating on the Reading route.I wonder if some may be refurbished but then re-enter service on the Reading and co. services for an interim period until they can be displaced, a little similar to the Class 170s in operation with WMT under EMR branding, although I know that a refurbishment will take it out of service for considerably longer than a revinyling.
Because guards/drivers/dispatchers are always experts on fleet deployment issues, obviously...I enquired about this a few weeks ago and a guard told me that most of the 707's are staying until sufficient 701's are in service to displace them.
Ah yes, a swr guard that also manages fleets.Because guards/drivers/dispatchers are always experts on fleet deployment issues, obviously...
That makes perfect sense because it's not as if Southeastern have any pressing need for the 707s.I enquired about this a few weeks ago and a guard told me that most of the 707's are staying until sufficient 701's are in service to displace them.
They need 707s to start 465/466 withdrawals though.That makes perfect sense because it's not as if Southeastern have any pressing need for the 707s.
But who says 465/466 withdrawal is pressing? It's only going to happen to give the 707s somewhere to go rather than storage.They need 707s to start 465/466 withdrawals though.
But who says 465/466 withdrawal is pressing? It's only going to happen to give the 707s somewhere to go rather than storage.
The DfT will decide what moves where and when.
There is many other routes around the country that have stock on them that are a lot older than the class 465/466 units, even if they have had a refresh recently and/or have had other power supplies add to them.They need 707s to start 465/466 withdrawals though.
On the other hand, if the 321s are going for scrap, then the 465s / 466s which were the next order shouldn't be far behind.There is many other routes around the country that have stock on them that are a lot older than the class 465/466 units, even if they have had a refresh recently and/or have had other power supplies add to them.
On the other hand, if the 321s are going for scrap, then the 465s / 466s which were the next order shouldn't be far behind.
However, this isn't wholesale fleet replacement, it appears that what is happening here is that there are some units in the fleet which are more unreliable than the others and SE want shot of them to concentrate on the ones which are in better condition.
I'm not sure what that means for the removal of 707s vs 458s though.
Like D365 I thought that the class 707's where being taken on for extra capacity, which at the moment is currently not required.When was it decided for Class 707s to be a Cl465/466 replacement? Unless plans have changed, I was under the impression that the 707s are transferring for additional capacity.
Its Angel Trains.Now I am not sure who owns the class 707 fleet, but let's say for arguments sake it is Eversholt Rail,
Well, Southeastern themselves have said they'll be replacing some Networkers, so for me that's pretty convincing!When was it decided for Class 707s to be a Cl465/466 replacement? Unless plans have changed, I was under the impression that the 707s are transferring for additional capacity.
Ah so plans have changed then.Well, Southeastern themselves have said they'll be replacing some Networkers, so for me that's pretty convincing!
As for additional capacity I'd certainly be interested to know where that might be needed anytime soon!
Ah so plans have changed then.
Several of my EMR and CrossCountry trains this month have been (covid) full!
South East London isn't known for its large leisure and tourism flows! All the capacity has always been provided in the peaks. Obviously that is not now needed anytime soon.Ah so plans have changed then.
Several of my EMR and CrossCountry trains this month have been (covid) full!