Currently there's a temporary platform on the down line on the original previously neglected part of the platform. The part under the awning is fenced off. Does anyone know what's being done?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

andyb2706

Member
Joined
21 Jan 2013
Messages
747
Location
Manchester
Something similar is happening at Walkden where they have extended the platform with a temporary platform at the Manchester end of the station. This is happening so that the can relay the platform flooring so I suspect the same thing might be happening at Swinton.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
I am pleased to see any station infrastructural improvements on this line. I remember how matters used to be over 50 years ago, when this line was not just the backwater that it finds itself to be these days.

Does anyone remember how useful this station was for the former Rugby League ground in those days of yore ?
 

Ships

Member
Joined
25 Apr 2013
Messages
338
Seems strange considering all the island platforms where done up in the last few years. When I initially saw the work I was hoping they where extending the platforms to accommodate six carriages sadly this doesn't seem to be the case.
 

andyb2706

Member
Joined
21 Jan 2013
Messages
747
Location
Manchester
Well at Walkden they lengthened the platform and only re-did half the platform flooring and introduced longer trains.....they have now realised their error so have had to erect a temporary extension to the platform to accommodate the longer trains so they can do the other half of the platform...I'm not sure whether that is the same situation at Swinton though.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Well at Walkden they lengthened the platform and only re-did half the platform flooring and introduced longer trains.....they have now realised their error so have had to erect a temporary extension to the platform to accommodate the longer trains so they can do the other half of the platform...I'm not sure whether that is the same situation at Swinton though.

No error - the platforms were virtually completely non-compliant for stepping (you needed a ladder at Walkden), so the new extension was built as correct as possible and now the original section is being corrected. They will be 6-car when completed.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
No error - the platforms were virtually completely non-compliant for stepping (you needed a ladder at Walkden), so the new extension was built as correct as possible and now the original section is being corrected. They will be 6-car when completed.

Would the platform heights as originally constructed have been influenced by the types of Lancashire and Yorkshire Railway passenger carriage design appertaining when this through route from Windsor Bridge Junction to Crow Nest Junction that avoided Bolton was constructed ?
 
Last edited:

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Would the platform heights as originally constructed have been influenced by the types of Lancashire and Yorkshire Railway passenger carriage design appertaining when this through route from Windsor Bridge Junction to Crow Nest Junction that avoided Bolton was constructed ?

More likely that the track has done its usual "levitation trick" over the years, whereas the platforms have not ...
 