It had not been approved as shareholders had not been consulted. It has just got the go ahead.The restructure was announced last year.
It had not been approved as shareholders had not been consulted. It has just got the go ahead.The restructure was announced last year.
It still hasn't been approved! The AGM votes are June and August for H and G respectively.It had not been approved as shareholders had not been consulted. It has just got the go ahead.

I would hope that they are addressing the (lack of?) invert too!The heritage line said more than 2,500 tonnes of material had been excavated from the site and a temporary culvert had been installed to allow full access for machinery.
The next phase of the operation will involve the installation of concrete blocks to support the embankment and the railway said it hoped to announce a reopening date for the full line within the next week.
Engineering contractors CML moved on to the site at the start of the month and the railway said the culverting work would "allow further excavation to take place around the collapsed wing wall of the bridge".
Once that is complete, more than 100 concrete blocks, each weighing 2.5 tonnes would be moved into place. After that the contractors plan to cover it with alternate layers of matting and imported aggregate, to create a stronger embankment.
Finally, concrete blocks will be placed on the top of the bridge to form a base for the railway track.
‘Flying Scotsman’ will haul our first full line service of the season, as we re-open all the way to Bridgnorth for public services on 25 July.
I mean, putting the track back fit for 25mph over that length is a day maybe two days work max.They are displaying a great deal of confidence here! I'm guessing they must actually be expecting the track to be back in place a couple of weeks before this allowing for tamping, testing, and a bit of weather contingency?
Sterns has had speed restrictions for years. The infamous white telegraph pole on its long slow journey from the lineside to the Severn explains why.I expect they'll have a speed restriction on the bridge to settle everything down
Full re-opening on 25 July featuring Flying Costman according to the SVR Facebook page.
8 coach LNER set is planned. Up to 360 seats, though it depends how well the compartments are filled. Some seats may still be available as some places have been reserved for VIPs and special donors.The total of nine return trips apparently sold out online in three minutes.
Amazing. As the Managing Director said, this is a vote of confidence by UK residents in the future of SVR.
At a conservative guess of 300 seats per train, that's 2,700 tickets sold at £45 a pop. Does anyone have a better estimate of how many seats would be on a (say) seven carriage train, which presumably includes a buffet car in the middle?
Even if it costs thousands of pounds to place 'Flying Scotsman' at SVR, a decent net profit for the three days should be the result.
My prayer is that by 25 July, the section from Hampton Loade to Brignorth has reopened. It would be extremely embarrassing (and costly financially for this preserved railway) were this not the case.
Is the SVR at all likely to be subject to steam bans due to dry weather? Or does that not happen due to the nature of the surrounding land? It would be a bit galling to have the line open and the Flying Scotsman ready to go but unable to run due to fire risk. Or would they run it anyhow in light steam with a diesel doing the real work?8 coach LNER set is planned. Up to 360 seats, though it depends how well the compartments are filled. Some seats may still be available as some places have been reserved for VIPs and special donors.
There's a decent amount of slack in the schedule. The concrete pad has been poured.
Still running steam at the moment. SVR fire risk is categorised as Green, Yellow, Red, Black. Currently red which has various instructions to crews about the running and handling of the locos. Black would be no steam.Is the SVR at all likely to be subject to steam bans due to dry weather? Or does that not happen due to the nature of the surrounding land? It would be a bit galling to have the line open and the Flying Scotsman ready to go but unable to run due to fire risk. Or would they run it anyhow in light steam with a diesel doing the real work?
nor me - nor the new-build things with the same livery either. This might be OT... but give me a restored everyday coal-train slogging loco or a Black Five any time. In reality it's all the mundane/common cheap-to-buy and "easy" to maintain workhorses (including industrials) which saved most preserved lines.I’ve never fully understood the massive fascination with the flying Scotsman
Got to wait for the PVA to dry on the ballast firstThey are displaying a great deal of confidence here! I'm guessing they must actually be expecting the track to be back in place a couple of weeks before this allowing for tamping, testing, and a bit of weather contingency?
You may laugh, but Ballast Glueing is a known technique.Got to wait for the PVA to dry on the ballast first![]()
Actually thats pretty interesting. What do they use?You may laugh, but Ballast Glueing is a known technique.
Especially where ballast falls away on embankments.
I was involved on one site near Elland Rd Stadium.
Also at Dawlish along the sea wall.You may laugh, but Ballast Glueing is a known technique.
Especially where ballast falls away on embankments.
I was involved on one site near Elland Rd Stadium.
www.svrlive.com
And London Paddington of all places too. The Glued Ballast is used at the country end of the station where there is a sharp cant.Also at Dawlish along the sea wall.
Obviously not for an embankment there but for the sea that used to & still does top the sea wall
At Woking, around the trap points from the Down Bay. When new it looked as though it was covered in glacé ice. Rock solid to walk on.You may laugh, but Ballast Glueing is a known technique.
Especially where ballast falls away on embankments.
I was involved on one site near Elland Rd Stadium.