I suppose that the good news is that the debate (here and elsewhere) has moved away from the "HS2 is getting billions therefore we deserve a share" argument and people are becoming more aware of the large population on the south Devon coast who rely on the railway all year round.
Gunnislake and Bere Alston have populations of approximately 3.5 and 2 thouseand people respectively. Tavistock and Okehampton have populations of 11 and 5.5 thousand respectively. The two are not comparable in terms of the generation of potential passenger traffic
Wait a minute - I thought people were discussing Tavistock being a "railhead" for this vast population in northern Cornwall/ northern Devon? In which case the population of one town over another isn't relevant - all we need is a car park in one of them?
11,000 and 5,500 are pretty low down on the list of "towns without stations" - and even so both Tavistock and Okehampton are a shortish drive from a local station (so nothing like the case of somewhere like Hawick currently is)
There might be larger towns that don't yet have a station
There are larger towns lacking rail connections. Much larger towns. But there's no sentimental lobby worrying about places like Washington T&W (over 50,000 - ten times bigger than Okehampton)...
it is comparatively unusual in this country to have such a large area of population dependent on only one main line
Devon and Cornwall are on a peninsula - no getting away from it - but does that mean we build a second route to Penzance?
There's only one line from Newport to Cardiff, only one route from Dundee to Aberdeen...
One factor you have missed there is the rise of UKIP, who could do significant damage to all three main parties in the European elections later this year and in the general election next year.
I don't think UKIP will be an issue at the General Election in that part of the country. The only place they've got a realistic chance would be Boston (Lincolnshire).
They'll win Euro seats, because of the different voting system, and the fact that this is their "big issue" - but that seems less of a concern to the major parties.
Post 197 of this thread>>
http://www.rail.co.uk/rail-news/2014/dawlish-rail-disruption/
When was it closed?
Winter 1846 3 days
Winter 1852/53 2 blockages of 7 and 3 days respectively)
Feb 1855 blockage of 12 days continuously (longest in period 1846 1986)
Oct 1859 blockage for 3 days
Jan Feb 1869 blockage for 5 days
Winter 1872/73 4 blockages of 1 day, 3 days, 3 days and 1 day respectively
Nov 1908 damage to walkway only
March 1923 blockage of 3 days
Jan 1930 blockage of 5 days
Feb 1936 blockage of 3 days
March 1962 ballast wash outs, services suspended for several hours, then Single Line Working (SLW) was instituted over the Up line
February 1974 major damage to down platform at Dawlish station, line completely closed for 2 hours, then up line reopened
Feb/March 1986 blocked 26/02/86 to 03/3/86 serious damage to wall at Smugglers Cove. The Up line (eastbound) was still useable for engineers trains (and a few freight services on 1 March only). SLW commenced on 03/3/86 with the Down Main Line (Westbound) remaining shut until reopened on 11/3/86
In the last 20 years, January 1996 saw a major incident when the wall was damaged between Dawlish and Dawlish Warren at Rockstone with further severe damage at Sprey Point. Here, the down line (nearest the sea) was suspended over a washed out void, which reached to sleeper ends of Up line. Both lines closed several days were closed for about a week.
The Winter of 2000/2001 following prolonged heavy rain, saw many cliff falls and again Sprey Point featured with a big fall with the line closed for a few days and some more damage to the sea wall. Railtrack then Network Rail then carried out some major cliff stabilisation work in the mid-2000s at a cost of around £15 million.
So are you quite happy to have half a million people including Britain's biggest Naval port cut off intermittently without notice from the UK rail network. Where else is this an annual occurrence?
Oh, is it an annual occurrence now?
And how many trains are there for the docks?
In the end the Teignbridge [Dawlish Teignmouth & Newton Abbot] population is 125k, Torbay 130k, Plymouth 260k, Cornwall 500k, so on the basis of greatest happiness of the greatest number for an affordable price, the Okehampton route, being half built, has to be a pretty obvious win
You're making the massive assumption that all of these people use the railway in equal number.
People in Cornwall still have their services (on the branches and as far as Plymouth), so most people who use the train daily (commuting, college etc) have a train. Plus there's big areas of Cornwall that the train doesn't serve.
Those in Torbay/ Dawlish etc are cut off from their regional centre (the place that many of them will use the train to for work/ college etc).
The simple maths doesn't work.
shouldn't be that hard to knock an hour off Plymouth-London, but which bottlenecks are the biggest benefit for the smallest cost?
Interesting question - what would be of more benefit to the south west economy - improved links towards the rest of the UK like the one you suggest, or a diversionary route between Exeter and Plymouth for "one week a year"?
I am still not sure how any of you think Okehampton is short term???? It will take at least 5 years if we started the process now! That is not short term. Short term for me would be reinforcing the sea defenses. Gabions at the base big lumps of Cornwall granite etc etc etc
Sounds a reasonable timescale
I don't think you are. The evidence so far seems to be that the sea wall was breached at a particular section that was always much narrower than the rest, (for reasons already pointed out earlier in the thread)
I fear that this point will go over the head of many
It's only weak if you think severing the rail connections with the quarter of a million people of Plymouth and the half a million of Cornwall is weak
How often are they being "severed"?
On what is normally a pro railway forum, I am amazed at the tone of some of the posts opposing the restoration of the line between Bere Alston and Okehampton. Presumably you have something far more important that could be done with the money
Yes - lots of better things could be done with the money - even if we restrict "alternatives" to south west England - you could reopen the Portishead line (Portishead is bigger than Okehampton and Tavistock combined), you could redouble the SWT line through Yeovil, you could electrify the B&H...
...spending "£250m" to serve two small towns and to act as a slow diversionary route on limited occasions would be a waste (when you consider the alternatives).
Building new houses around a re-opened rail link is a sure-fire way to improve the business case, particularly if you require the developer to make significant financial contributions.
That was what was meant to happen at Blackridge (on the Airdrie - Bathgate line). A property company was going to stump up £2m of the £5m cost of the station - but then pulled out leaving the council to pay the full amount.
There was a similar story in Private Eye recently about Heathrow promising to pay a significant part of the cost of extending Crossrail to their airport - but then deciding not to once the building started.
I'm a bit cynical about the intentions of private companies who suggest that they want to help pay for something...
When Dawlish is mended, and the rails are shiny again, will we all feel it's over and done, now? (then). But as autumn merges into winter will we anxiously scan the weather forecast, looking out for more gales? Stopping traffic for safety's sake on that pictureque but so vulnerable bit of railway once again, mending it once more, again and again. Or do we think it's over now? - a once in hundred year (or whatever it is) event, not to be repeated until, say, 2114. I'd guess that something like this, the last few weeks, will become an annual event
We've just had the wettest winter in 100 years/ 250 years (depending on which paper you read/ which records you believe) - with a disproportionate impact upon south west England.
The coastal route may well close for periods in the future (just like many lines are temporarily closed for emergency engineering), but I don't buy the received wisdom that the current level of disruption will now happen every year.
The railway via Dawlish simply has to stay open regardless.
Agreed
Like a lot of things/proposals I hope the idea that the cost-benefit ratio is highly in favour of reopening the line, especially with economic costs of £1-2 million per day for Devon and Cornwall while the line is closed.
Its now being reported on BBC Radio Cornwall as costing £20 million a day Cornwall and Plymouth's economy
That's gone up pretty quickly then... hope George Osbourne realises how quickly inflation gets out of hand.
You can argue how much the amount is, but the fact remains that this closure will be costing the economy money
Of course closure costs the economy money (just like the landslip by Dronfield costs the economy money, just like the flooded lines through Somerset costs the economy money, just like the broken down freight between Sheffield Midland and Meadowhall on Wednesday cost the economy money), but coming up with daft unsubstantiated figures like BBC Radio Cornwall have doesn't help the debate. Anyone can come up with a big number, but it doesn't strengthen the case.
XC have no booked work that way, there are no paths for them over that way even if they wanted to run that way!
Presumably the lack of paths for XC is because of the single track sections that way - but redoubling this busy line isn't as popular on here are reopening something closed fifty years ago, sadly.