Suggestions for Dawlish avoiding route(s)

Status
Not open for further replies.

LateThanNever

Member
Joined
18 Jul 2013
Messages
1,029
I cant remember where i read it, i believe it was in that PHD paper linked to earlier in the thread which was in turn referenced from studies of the route by various parties. It was around 50 minutes slower than existing line which the bus service is 10-15 minutes quicker than. So around an hour slower.

It is not peanuts at all it is a lot of money for what i feel would be very small benefits. Okehampton does not require a rail link to Plymouth and Tavistock does not require a rail link to Exeter.
According to JR Consulting
http://www.google.co.uk/url?sa=t&rc...4GgAg&usg=AFQjCNHa0-AvlvrKAbKe4pSeVAOjAqp3LA

"the former Southern Railway line via North Dartmoor has some long stretches where top line speed could be improved" - so if it were to become an alternative we can safely assume they would be!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
Consultants say lots of things. They also said the WCRM upgrade cost X at and provide Y. It actually cost 2X to provide 1/2Y.
 

LateThanNever

Member
Joined
18 Jul 2013
Messages
1,029
Consultants say lots of things. They also said the WCRM upgrade cost X at and provide Y. It actually cost 2X to provide 1/2Y.

Indeed they do, but it does, nonetheless, seem to suggest that your 50 minutes extra journey time is exaggerated if not less than accurate!
Unless you have your own consultant?
 
Last edited:

Gadfly

Member
Joined
8 Nov 2012
Messages
22
I would agree with your comment 100% but which route do you think could be implemented in the short-term to keep the trains running between Exeter and the south-west?

Neither - in the short term, road transport is the only solution when the line is blocked, as is the case with most of the rest of the country.
 

34104

Member
Joined
1 Dec 2011
Messages
64
I cant remember where i read it, i believe it was in that PHD paper linked to earlier in the thread which was in turn referenced from studies of the route by various parties. It was around 50 minutes slower than existing line which the bus service is 10-15 minutes quicker than. So around an hour slower.

It is not peanuts at all it is a lot of money for what i feel would be very small benefits. Okehampton does not require a rail link to Plymouth and Tavistock does not require a rail link to Exeter.


It isn't just Exeter though-it would open up direct connections from Tavistock to London,Birmingham,Salisbury,the South coast,anywhere you care to mention really.Tavistock will end up as a town of 13000-14000 people by the time projected developments are finished in 2026 and there would be a very defendable argument that Tavistock in fact would benefit more from having a connection to Exeter rather than Plymouth.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
Indeed they do but it does, nonetheless, seem to suggest that your 50 minutes extra journey time is exaggerated if not less than accurate!
Unless you have your own consultant?

I stated my source and will find the link when not on my phone. Too busy in the motored car of a 321 to search right now.
--- old post above --- --- new post below ---
[/B]

It isn't just Exeter though-it would open up direct connections from Tavistock to London,Birmingham,Salisbury,the South coast,anywhere you care to mention really.Tavistock will end up as a town of 13000-14000 people by the time projected developments are finished in 2026 and there would be a very defendable argument that Tavistock in fact would benefit more from having a connection to Exeter rather than Plymouth.

Change at Plymouth? I am afraid I do not see the need for direct service from tavistock to alp those places.
 

34104

Member
Joined
1 Dec 2011
Messages
64
I stated my source and will find the link when not on my phone. Too busy in the motored car of a 321 to search right now.
--- old post above --- --- new post below ---


Change at Plymouth? I am afraid I do not see the need for direct service from tavistock to alp those places.

Maybe actually living 6 miles from Tavistock gives me a slightly different perspective.Just to take a simple example,currently to get to Exeter [or beyond] by train,then you need to get to Plymouth first-which is 16 miles due south and adds 35-40 minutes to a prospective journey time before it had even started.If the proposed Tavistock-Plymouth link is reinstated over the next few years,the situation for people wishing to get to Exeter and beyond isn't really going to change much-the getting to Plymouth first would still be the problem,it would certainly be quicker by 5-10 minutes but would still not solve the premise of having to travel South before you can travel East.Fairly obviously if Tavistock was directly connected to Exeter via Okehampton,then the journey time of getting to Plymouth first would be taken out of the equation and hence the benefit to Tavonians wishing to make their journey entirely by rail.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
We cannot provide a link from everywhere to everywhere.
--- old post above --- --- new post below ---
I am not saying it wouldnt benefit just that tavistock to exeter should not be a priroity.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,314
Location
Yorks
Yes but we cannot duplicate every single line.... :/

If we reopened the Okehampton route then it would be around 1 hour slower for people than just changing onto buses... And i really think 300-500 million is alot for a weekend and occasional diversion route.

We don't have to duplicate every single line, because the vast majority of main routes already have an alternative and benefit greatly from it.

I share the general scepticism of the 1 hour additional travel time with other posters, however even if it were an additional hour, a diversion would still be preferable for the passenger than bustitution (hence the the existance of diversions via Yeovil on the GW, Banbury on the WCML and Carlisle on the ECML.
 

34104

Member
Joined
1 Dec 2011
Messages
64
We cannot provide a link from everywhere to everywhere.

That isn't really what i was saying was it?:roll:I was just making a debating point in response to your assertion that Tavistock would benefit more from a link to Plymouth than one to Exeter.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,314
Location
Yorks
I am not saying it wouldnt benefit just that tavistock to exeter should not be a priroity.

Maybe not on its own, but with the added impetus that the existing main line is very long and isolated, and the Dawlish section in particular is very vulnerable, all these sections add up to a sensible case
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,280
Location
East Midlands
Fairly obviously if Tavistock was directly connected to Exeter via Okehampton,then the journey time of getting to Plymouth first would be taken out of the equation and hence the benefit to Tavonians wishing to make their journey entirely by rail.

Also, there could be considerable potential (particularly in the summer) for tourists/walkers etc. who would use an Exeter to Tavistock direct service (most of whom would probably not consider rail if their only option was to go the long way round via Plymouth assuming the planned extension from Bere Alston to Tavistock was open).

I wonder how large this potential is?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
It doesn't have to close more regularly than any other part of the country. The vast majority of other routes have an alternative. The railways between Sheffield, Barnsley, Wakefield etc are a dense network of lines where you can generally get where you need to be by another route

For me, resilience means that Cornwall and the West Country would almost always be accessible by train, in the same way that Exeter is pretty much always accessible (with the exception of the very short period of time when a landslip at Crediton closed both of the routes). A Dawlish avoiding line simply wouldn't provide that sort of resilience

Why is nobody complaining that Cornwall only has one link to Devon? Or is it okay for there to be only one route from Cornwall to Devon, but Plymouth needs more than one route to Exeter?

Yeah, five minutes each time. Big deal.

A faster route avoiding Dawlish would mean a saving of roughly an hour a week for commuters - quite a difference.

At the moment the twisty route means that rail struggles to compete with car - even National Express can do the journey between the cities in around an hour by coach (faster than any via Okehampton would manage) - a "DAL" would be a big help for rail.

Buses only go so far at indicating whether a rail service is viable

It's not an exact science, and I'm not pretending that it is, but it's a reasonable benchmark to use. If we look at the markets unserved by daily trains we have:

  • Tavistock to Plymouth - five buses an hour
  • Tavistock to Okehampton - a council subsidised service every couple of hours
  • Okehampton to Exeter - Almost hourly service (but also carrying passengers from Launceston/ Bude etc to Exeter)
  • Tavistock to Exeter - ???

That suggests that there's scope for a regular train from Tavistock to Plymouth, but not for "667 passengers a day from Okehampton to Plymouth".

We seem to be going round in circles here - surely the point is that if it is thought that the sea-wall route will eventually become impassable, a replacement route will be needed, even though the old route will be kept for as long as practicable. The new route will have to be from Exeter to Newton Abbot, so a reopened Okehampton line would be irrelevant.

Agreed

If people are throwing money around to avoid places that regularly cause problems, why not Cowley Bridge Junction?

The line follows the route of the Culm and the Exe for rather a long distance, which is surely part of why it's so vulnerable to flooding

True, but this thread seems to be more about justifying rebuilding a Victorian line than trying to solve the problems of 2014.

Agreed that there seems to have been more/ regular damage in the Cowley Bridge area over the years.

A DAL would improve the resilience of the railway for Cornwall, Plymouth, Totnes etc as well as Torbay and Newton Abbot. Therefore it is preferable to the Okehampton route.

A DAL would give a faster everyday journey, it would bypass the "weakest link" of the current line, it would benefit the more populated side of Devon, its the way forward.

Torbay area mp's are unlikely to be convinced

If I lived on the busy line to Torbay, I'd be a bit miffed at the way that so many people seem happy for Paignton services to be reliant upon only one line, whilst its apparently imperative for Plymouth to have a second route to Exeter.

there are considerable potential benefits to Plymouth in particular, so it's establishment needs to be worked on as well as Cornwall

A bigger benefit to Cornwall would be a faster everyday journey to/from Exeter/ London/ Birmingham (etc) - a "DAL" has much better benefits to Cornwall than an Okehampton route would have.

The sum of 300-500 million projected over 25 or 30 years for the reinstatement of a railway line that should never have closed in the first place is peanuts compared to some other projected projects

Whether it should have closed or not in the first place isn't relevant - got to deal with where things currently are.

The fact that £500m is "peanuts" compared to some bigger schemes isn't relevant either - there are always other things that we could spend £500m on. And, if we can get a large amount of the benefits by a seven-ish mile single track line from Bere Alston to Tavistock then that leaves a lot of change to spend on other routes in the south west (redoubling more of the Salisbury - Exeter route? electrifying the B&H? a line to Portishead?)

According to JR Consulting
http://www.google.co.uk/url?sa=t&rc...4GgAg&usg=AFQjCNHa0-AvlvrKAbKe4pSeVAOjAqp3LA

"the former Southern Railway line via North Dartmoor has some long stretches where top line speed could be improved" - so if it were to become an alternative we can safely assume they would be!

Throw enough money at any scheme and you can improve the speeds. But I think that an Okehampton route will have an Exeter - Plymouth journey time of closer to 1h30, slower than a replacement coach service, slower than National Express.

Tavistock will end up as a town of 13000-14000 people by the time projected developments are finished in 2026

There are a number of places with populations of over 13,000 today without a railway station, ignoring population growth in a dozen years.

We cannot provide a link from everywhere to everywhere

Apart from Manchester Airport? :lol:
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
I cant remember where i read it, i believe it was in that PHD paper linked to earlier in the thread which was in turn referenced from studies of the route by various parties. It was around 50 minutes slower than existing line which the bus service is 10-15 minutes quicker than. So around an hour slower.

It is not peanuts at all it is a lot of money for what i feel would be very small benefits. Okehampton does not require a rail link to Plymouth and Tavistock does not require a rail link to Exeter.

...so about double the current journey time. Given that both routes are abut 60 miles, therefore the average journey speed of 60mph for the existing line and 30mph for the line through Okehampton. Now depending on what the assumptions the consultant used that may result in the journey times stated.

However I would have thought that it is likely that the assumption was that there was a few minutes for each turn around, a few minutes stops at every station, fairly slow single line speeds, several minutes of waiting for the line ahead to clear and was probably based on the reopening costing the £100m quoted early on in this thread.

However, it could well be that for £400m it could result in a journey time of 15 minutes less than the current route for trains running non stop between Exeter and Plymouth as that would bean average speed of 90mph.
 

SWTCommuter

Member
Joined
17 Oct 2009
Messages
353
I cant remember where i read it, i believe it was in that PHD paper linked to earlier in the thread which was in turn referenced from studies of the route by various parties. It was around 50 minutes slower than existing line which the bus service is 10-15 minutes quicker than. So around an hour slower.

For what it's worth, here are a couple of examples from the 1965 timetable

Plymouth............10.55
Okehampton........11:54
Exeter SD...........12.25

Plymouth.............11.30.......11.50
Totnes...................//.........12.27
Newton Abbot.........//........ 12.45
Exeter................ 12:44.......13.14

It was slower via Okehampton but there wasn't a lot in it as far as through services were concerned. Of course, one can contrive a difference of an hour by comparing a 1965 stopper via Okehampton, which took a couple of hours, with a modern fast service via Dawlish, which now takes an hour, but that comparison ignores several decades of improvements to track, stock and signalling.
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,314
Location
Yorks
Why is nobody complaining that Cornwall only has one link to Devon? Or is it okay for there to be only one route from Cornwall to Devon, but Plymouth needs more than one route to Exeter?

Well, it's a question of what benefits and what costs. Reopening the route through Okehampton would keep Plymouth and the whole of Cornwall linked to the network. You could theoretically reopen the route via Wadebridge, but I don't think the cost could be justified (I'm not for reopening every route that was ever closed).

If there were another route to South Wales that could link in unconnected towns and had most of it's infrastructure in place, I might agree with that, but there isn't and the cost would be much higher. The fact is, the presence of a lot of existing infrastructure for the Okehampton route does affect the case for reopening, however much some who are against all reopenings might like to characterise it as being hidebound by the past.

A faster route avoiding Dawlish would mean a saving of roughly an hour a week for commuters - quite a difference.

Yeah, but an hour spread across the week really doesn't make that much difference. I can think of a lot of commuters from Normanton who would save more than an hour a week if they stopped more of the fast trains there (thusallowing said commuters to miss out reversal at Cass-vegas), and what's more, this would be a hell of a lot cheaper than Dawlish, because they wouldn't have to build a seven mile long new railway. But they haven't, so an hour spread throughout the week obviously can't be worth that much.

At the moment the twisty route means that rail struggles to compete with car - even National Express can do the journey between the cities in around an hour by coach (faster than any via Okehampton would manage) - a "DAL" would be a big help for rail.

It possibly would, but there are probably other improvements to timings that could be made on the route cost effectively than building a brand new line.

It's not an exact science, and I'm not pretending that it is, but it's a reasonable benchmark to use. If we look at the markets unserved by daily trains we have:

  • Tavistock to Plymouth - five buses an hour
  • Tavistock to Okehampton - a council subsidised service every couple of hours
  • Okehampton to Exeter - Almost hourly service (but also carrying passengers from Launceston/ Bude etc to Exeter)
  • Tavistock to Exeter - ???

I don't think it is a reasonable comparison really, not by a long chalk. Frequent urban bus services might be a sort of proxy for rail potential on those sort of routes, but buses simply aren't viewed by the majority of the public as a viable alternative for longish inter urban journeys. They will be supressing demand.

True, but this thread seems to be more about justifying rebuilding a Victorian line than trying to solve the problems of 2014.

You can bang on all you like about "justifying rebuilding Victorian lines" but the simple truth is the presence of infrastructure does affect how affordable such things are. It works both ways.

Agreed that there seems to have been more/ regular damage in the Cowley Bridge area over the years.

Yeah, and NR are quite rightly giving a high priority to solving this issue. Therefore, don't really see the relevance.

A DAL would give a faster everyday journey, it would bypass the "weakest link" of the current line, it would benefit the more populated side of Devon, its the way forward.

A bigger benefit to Cornwall would be a faster everyday journey to/from Exeter/ London/ Birmingham (etc) - a "DAL" has much better benefits to Cornwall than an Okehampton route would have.

Better achieved through an incremental programme of improvements along the whole route.

Spending hundreds of millions on an expensive white elephant whose only additional benefit would be saving the time time of an on-train toilet break couldn't possibly add as much benefit as linking up areas that denied a decent railway connection.

Whether it should have closed or not in the first place isn't relevant - got to deal with where things currently are.

Which is exactly why it is so much more cost effective to reuse existing infrastructure with multiple benefits.
 

LateThanNever

Member
Joined
18 Jul 2013
Messages
1,029
Why is nobody complaining that Cornwall only has one link to Devon? Or is it okay for there to be only one route from Cornwall to Devon, but Plymouth needs more than one route to Exeter?

Plymouth is the ?15th city of the UK. Reopening the Okehampton route would actually enable another route to Cornwall - that's next on the list!



A faster route avoiding Dawlish would mean a saving of roughly an hour a week for commuters - quite a difference.

At the moment the twisty route means that rail struggles to compete with car - even National Express can do the journey between the cities in around an hour by coach (faster than any via Okehampton would manage) - a "DAL" would be a big help for rail.

5 minutes a journey is hardly amazing and is the maximum that could realistically be achieved - and that would be avoiding Dawlish or Teignmouth themselves - so no service for them. And Okehampton could manage faster - indeed I've read that part of the line was originally authorised for 125mph!



It's not an exact science, and I'm not pretending that it is, but it's a reasonable benchmark to use. If we look at the markets unserved by daily trains we have:

  • Tavistock to Plymouth - five buses an hour
  • Tavistock to Okehampton - a council subsidised service every couple of hours
  • Okehampton to Exeter - Almost hourly service (but also carrying passengers from Launceston/ Bude etc to Exeter)
  • Tavistock to Exeter - ???

That suggests that there's scope for a regular train from Tavistock to Plymouth, but not for "667 passengers a day from Okehampton to Plymouth".

I think that there is a shopping bus ? once a week Tavistock to Exeter. The fact that it exists at all is surely an indication of suppressed demand. Well could be...

True, but this thread seems to be more about justifying rebuilding a Victorian line than trying to solve the problems of 2014.

Agreed that there seems to have been more/ regular damage in the Cowley Bridge area over the years.

Improvements to Cowley Bridge are already being progressed at £6-12m!



A DAL would give a faster everyday journey, it would bypass the "weakest link" of the current line, it would benefit the more populated side of Devon, its the way forward.


But if Dawlish and Teignmouth lose their rail links it would not benefit all the more populated side of Devon.


If I lived on the busy line to Torbay, I'd be a bit miffed at the way that so many people seem happy for Paignton services to be reliant upon only one line, whilst its apparently imperative for Plymouth to have a second route to Exeter.
Plymouth is twice the population of Torbay and Cornwall is, overall, twice the population of Plymouth - so broadly Torbay is 13-15% of the total served by the line. They may indeed be miffed but nobody in favour of the Okehampton route is proposing closing down the coastal route.



A bigger benefit to Cornwall would be a faster everyday journey to/from Exeter/ London/ Birmingham (etc) - a "DAL" has much better benefits to Cornwall than an Okehampton route would have.
The five minutes saved (evidenced above) would be of very little benefit to anyone!



Whether it should have closed or not in the first place isn't relevant - got to deal with where things currently are.

Throw enough money at any scheme and you can improve the speeds. But I think that an Okehampton route will have an Exeter - Plymouth journey time of closer to 1h30, slower than a replacement coach service, slower than National Express.

Timetable in the post above by SWT commuter (with appropriate illustration!) would appear to suggest that each route is at least comparable!

Always enjoyable to read your posts...
 
Last edited:

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
Plymouth is twice the population of Torbay and Cornwall is, overall, twice the population of Plymouth - so broadly Torbay is 13-15% of the total served by the line. They may indeed be miffed but nobody in favour of the Okehampton route is proposing closing down the coastal route.

I also don't see why closure of the Dawlish route in the future with a reinstated Okehampton route would leave them without a service. There would be nothing stopping through trains from Torbay to London via Plymouth and the Okehampton route. Yes, it would take an extra 80 minutes or so, but it'd be there.
 

LateThanNever

Member
Joined
18 Jul 2013
Messages
1,029
I also don't see why closure of the Dawlish route in the future with a reinstated Okehampton route would leave them without a service. There would be nothing stopping through trains from Torbay to London via Plymouth and the Okehampton route. Yes, it would take an extra 80 minutes or so, but it'd be there.

As you say - but I'm sure the Torbayers would be miffed about that! That' s why I've suggested that during bad weather trains on the coast are driven on line of sight (I think it's called) along the coast. Once it is not the 'main' main line the resultant congestion will be much reduced and/or less important.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,163
Location
Wilmslow
For what it's worth, here are a couple of examples from the 1965 timetable

Plymouth............10.55
Okehampton........11:54
Exeter SD...........12.25

Plymouth.............11.30.......11.50
Totnes...................//.........12.27
Newton Abbot.........//........ 12.45
Exeter................ 12:44.......13.14

It was slower via Okehampton but there wasn't a lot in it as far as through services were concerned. Of course, one can contrive a difference of an hour by comparing a 1965 stopper via Okehampton, which took a couple of hours, with a modern fast service via Dawlish, which now takes an hour, but that comparison ignores several decades of improvements to track, stock and signalling.
http://www.plymouth.gov.uk/leader_rail_letter_to_prime_minister.pdf

The view of Plymouth City Council.

Tudor Evans is, however, also guilty of comparing the 90 minute 'Brighton' timing from Plymouth to Exeter St D via Okehampton with today's HST timing via Dawlish rather than the 74 minute non-stop 'Paddington' timing in play then. The 1150 'Manchester' at 84 minutes via Dawlish was a heavy train with generous station allowances for mail etc so is not a fair comparison.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,314
Location
Yorks
http://www.plymouth.gov.uk/leader_rail_letter_to_prime_minister.pdf

The view of Plymouth City Council.

Tudor Evans is, however, also guilty of comparing the 90 minute 'Brighton' timing from Plymouth to Exeter St D via Okehampton with today's HST timing via Dawlish rather than the 74 minute non-stop 'Paddington' timing in play then. The 1150 'Manchester' at 84 minutes via Dawlish was a heavy train with generous station allowances for mail etc so is not a fair comparison.

Ooh, I see the cost's gone up to £500 - £700m with "replacement of listed structures".

What a clown.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
If reinstating it costs that much then definitely not... But i sense that is an error i cannot see it requiring that much money. I think the £300-£500 million quoted is pessimistic.

(brief positive comments about reopening, normal service will resume shortly)
 

jmc100

Member
Joined
14 Feb 2014
Messages
75
If reinstating it costs that much then definitely not... But i sense that is an error i cannot see it requiring that much money. I think the £300-£500 million quoted is pessimistic.

(brief positive comments about reopening, normal service will resume shortly)

I think Mr. Evans is jumping the gun a bit here with the figures he's quoted. Patrick Hallgate estimated that it would cost £400 - £500m to reopen the Okehampton route or could it be that Mr. Evans is talking about the construction of a more direct route? He seems more interested in faster journey times and not an alternative route to keep the services up and running.

I notice from a recent press report that the cost for repairs to the sea wall will be approx. £15m. I wonder how much new track could be installed for that amount.
 

SWTCommuter

Member
Joined
17 Oct 2009
Messages
353
The 1150 'Manchester' at 84 minutes via Dawlish was a heavy train with generous station allowances for mail etc so is not a fair comparison.

The 1150 was timetabled to stop at Newton Abbot for only three minutes (1245 to 1248), when most other services hung around there for six to nine minutes. I neglected to mention that the 1055 also called at Devonport and Tavistock and was timetabled to stop at Okehampton for two minutes so perhaps it's not too unreasonable a comparison.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I've always assumed that any expresses diverted (or as an alternative too) via the Okehampton route would be non-stop and extra to a normal regional service. The thought of a through Plymouth - Brighton service appeals, as well, especially if it could go via Yeovil, Weymouth and Bournemouth. Now that is connectivity!
 

Gadfly

Member
Joined
8 Nov 2012
Messages
22
I also don't see why closure of the Dawlish route in the future with a reinstated Okehampton route would leave them without a service. There would be nothing stopping through trains from Torbay to London via Plymouth and the Okehampton route. Yes, it would take an extra 80 minutes or so, but it'd be there.

By that logic, we could also shut the Reading - Taunton line and go from London via Bristol, or shut the whole GW and go via Birmingham.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
By that logic, we could also shut the Reading - Taunton line and go from London via Bristol, or shut the whole GW and go via Birmingham.

"closure of the Dawlish route" I would suggest meant short term during unforeseen events rather than permanently.

Also in your logic you seem to have forgotten that there is no spare capacity going to Birmingham, so that wouldn't work.
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
I can't see the case for the DAL (or similar route) on its own.

As part of a strategic upgrade for routes to the SW, designed to get London-Plymouth timings down, it would definitely have its place, but as a pure stand-alone exercise, the time gains don't justify the cost.

As for Tavistock-Okehampton, I think the £500m-£700m price is for a mainline-standard route along the whole length from Exeter to Plymouth; building to branch-line standards would be much cheaper and provide almost all the benefits to locals of a full rebuild - but would not provide capacity or speed for express services. The only train I could see using the North Devon route in the case of a more typical (2-3 day) closure would be the Night Riviera. You'd be looking at coaches from Exeter for everything else anyway.

If Tavistock-Okehampton hadn't been closed by the Beeching Axe, then, as the mostly-single-track branch-line that is all its normal traffic-flows could justify, what I'd expect to see at the moment is an emergency timetable with a single hourly service from Penzance to London, with a Paignton-Plymouth service (via Newton Abbot) timed for a connection and a Cross-Country leaving from Exeter timed to allow Plymouth/Cornwall passengers to connect.

If I was given a large budget to really upgrade the SW's services, I'd close Salisbury-Exeter for an upgrade, dual-track, electrify and straighten that entire route, put in a chord from Exeter Central to St Thomas (bypassing St Davids), and build the DAL from Exeter to Newton Abbot. Electrify Salisbury-Basingstoke, and do the proposed Basingstoke-Waterloo conversion to OHLE. That would get a faster London-Plymouth service than the GWR route (it's shorter, straighter and on better terrain), and have the advantage of running from Waterloo instead of Paddington.

When you're finished, you might even close Reading-Taunton, as the fast London-Exeter service would then run from Waterloo and you'd retain the slow route via Bristol to Paddington (also needed for XC services via Birmingham).
 

TheKnightWho

Established Member
Joined
17 Oct 2012
Messages
3,183
Location
Oxford
By that logic, we could also shut the Reading - Taunton line and go from London via Bristol, or shut the whole GW and go via Birmingham.

I don't mean we should shut the damn thing. I meant as a provision if there's a future failure of the wall.

I clearly don't have an issue with route duplication.

When you're finished, you might even close Reading-Taunton, as the fast London-Exeter service would then run from Waterloo and you'd retain the slow route via Bristol to Paddington (also needed for XC services via Birmingham).

The towns en route still need a service, you know. It's that kind of thinking that led to the disastrous network we have now, where duplicate routes were closed with no thought for the people living in the towns actually on the routes.
 
Last edited: