Also it should be remembered that the original 1930s Dawlish avoiding line was not just a pie in the sky proposal. It was a fully funded, government backed live scheme asked for by the Great Western railway on which construction actually started in spring 1939 and was due for completion by January 1941. Only Adolf Hitler invading Poland in September 1939 and starting the 2nd World War stopped the work progressing.
http://en.wikipedia.org/wiki/Dawlish_Avoiding_Line
Quote The GWR started construction in Spring 1939, with surveyors poles in place along the proposed route by the summer. However, after the outbreak of World War 2, all work stopped.
And remember this was at a time when the alternative LSWR route via Okehampton and the Teign Valley routes were still both open and used for diversions when the Dawlish route was closed.
That 1930s generation of railwayman, politicians and engineers would be very surprised today at some of this generations attitude to a similar rail investment today. In this context its so sad to read some of the uninformed comments here.