adrock1976
Established Member
Being as the number of the traditional InterCity trains that presently run to and from Euston will be reduced when HS2 is up and running, my suggested service provision could be as follows:
Euston - Tring calling all stations every 30 minutes (as present, maybe also call Queens Park too) running on the Slow Lines.
Euston - Birmingham New Street via Northampton Regional Express, calling Watford Junction, Bletchley (for Bletchley Park and East West Rail), Milton Keynes Central, Wolverton, Northampton, Long Buckby, Hillmorton Crick Road/Rugby Parkway, Rugby, Coventry, Tile Hill (for Godiva Tramlink), Birmingham International, and New Street. This could run on the Fast Lines to Hanslope Junction rather than Ledburn if possible to timetable this crossing move in both directions. It is noted that West Midlands Region could provide 2tph local all stations Northampton - Birmingham - Wolverhampton so as to maintain the present 4tph between Coventry and Rugby. Also, by trying to timetable the crossing move at Hanslope instead of Ledburn, this may possibly allow the Bedford Midland - Bletchley local stations to continue to Milton Keynes, with the opposite half hour path left vacant.
Euston - Northampton calling all stations (including Cheddington) and running on the Slow Lines every 30 minutes. Together with the Euston - Tring, this would provide a combined frequency of every 15 minutes between Euston and Tring.
Euston - Milton Keynes Central every 30 minutes calling Watford Junction, Hemel Hempstead, Berkhamsted, Leighton Buzzard, Bletchley, and MK Central. Could run on Fast Lines throughout, or switch to Slow Lines at Ledburn if need be.
Although more for Table 176, the present East Croydon - Milton Keynes to be doubled in frequency from every 60 minutes to every 30 minutes. Alternatively, this could be curtailed to run East Croydon (or Clapham Junction) - Watford Junction using Platform 10 (unsure if the signalling allows it if the St Albans Abbey shuttle is running as that uses Platform 11) and quadrupled in frequency to every 15 minutes (bearing in mind that I would imagine that the Slow Lines timetable would have to be built around these, so as to avoid redoing the whole of the south of the Thames). Also possible transfer from Govia Thameslink to London Overground?
Venturing into Table 67 (ex Trent Valley Railway), London Euston - Crewe Regional Express every 30 minutes calling Milton Keynes Central, Rugby, Nuneaton, Atherstone, Polesworth, Tamworth, Lichfield TV, Rugeley TV (connecting to/from Walsall trains), Stafford, and Crewe.
As I mentioned a few weeks ago for the InterCity trains in Table 65, all would call at Milton Keynes Central.
Any other thoughts on how a possible post HS2 service provision could be for this section?
Euston - Tring calling all stations every 30 minutes (as present, maybe also call Queens Park too) running on the Slow Lines.
Euston - Birmingham New Street via Northampton Regional Express, calling Watford Junction, Bletchley (for Bletchley Park and East West Rail), Milton Keynes Central, Wolverton, Northampton, Long Buckby, Hillmorton Crick Road/Rugby Parkway, Rugby, Coventry, Tile Hill (for Godiva Tramlink), Birmingham International, and New Street. This could run on the Fast Lines to Hanslope Junction rather than Ledburn if possible to timetable this crossing move in both directions. It is noted that West Midlands Region could provide 2tph local all stations Northampton - Birmingham - Wolverhampton so as to maintain the present 4tph between Coventry and Rugby. Also, by trying to timetable the crossing move at Hanslope instead of Ledburn, this may possibly allow the Bedford Midland - Bletchley local stations to continue to Milton Keynes, with the opposite half hour path left vacant.
Euston - Northampton calling all stations (including Cheddington) and running on the Slow Lines every 30 minutes. Together with the Euston - Tring, this would provide a combined frequency of every 15 minutes between Euston and Tring.
Euston - Milton Keynes Central every 30 minutes calling Watford Junction, Hemel Hempstead, Berkhamsted, Leighton Buzzard, Bletchley, and MK Central. Could run on Fast Lines throughout, or switch to Slow Lines at Ledburn if need be.
Although more for Table 176, the present East Croydon - Milton Keynes to be doubled in frequency from every 60 minutes to every 30 minutes. Alternatively, this could be curtailed to run East Croydon (or Clapham Junction) - Watford Junction using Platform 10 (unsure if the signalling allows it if the St Albans Abbey shuttle is running as that uses Platform 11) and quadrupled in frequency to every 15 minutes (bearing in mind that I would imagine that the Slow Lines timetable would have to be built around these, so as to avoid redoing the whole of the south of the Thames). Also possible transfer from Govia Thameslink to London Overground?
Venturing into Table 67 (ex Trent Valley Railway), London Euston - Crewe Regional Express every 30 minutes calling Milton Keynes Central, Rugby, Nuneaton, Atherstone, Polesworth, Tamworth, Lichfield TV, Rugeley TV (connecting to/from Walsall trains), Stafford, and Crewe.
As I mentioned a few weeks ago for the InterCity trains in Table 65, all would call at Milton Keynes Central.
Any other thoughts on how a possible post HS2 service provision could be for this section?