Hello everyone,
I know there is lots of bullhead track on the London Underground - because I often see it when I take the tube and look down at the track. As I see so much of it on the London Underground I guess that it must be stressed because surely the London Underground wouldn't want to maintain all the fish plated joints they would need if they kept their bull-headed track jointed.
I then wondered - how do they stressed bullhead rail? Is it not in a key and a chair - will this allow stressing?
I also thought - they often have wooden sleepers on the London Underground - are they allowed to stress rails in wooden sleepers?
Finally I thought, where their bullhead track is in a tunnel - perhaps they don't need to stress the rail and can just weld it altogether into long welded rail lengths? My logic was that the temperature in the tunnel won't change very much so maybe there is not requirement to stress rail at all?
Lastly, if the London Underground does allow its bullhead rail to be stressed - do they have a standard for doing this? (I think, but I might be wrong, that NR does not allow its bullhead rail to be stressed and it is always jointed on the National Network).
I know there is lots of bullhead track on the London Underground - because I often see it when I take the tube and look down at the track. As I see so much of it on the London Underground I guess that it must be stressed because surely the London Underground wouldn't want to maintain all the fish plated joints they would need if they kept their bull-headed track jointed.
I then wondered - how do they stressed bullhead rail? Is it not in a key and a chair - will this allow stressing?
I also thought - they often have wooden sleepers on the London Underground - are they allowed to stress rails in wooden sleepers?
Finally I thought, where their bullhead track is in a tunnel - perhaps they don't need to stress the rail and can just weld it altogether into long welded rail lengths? My logic was that the temperature in the tunnel won't change very much so maybe there is not requirement to stress rail at all?
Lastly, if the London Underground does allow its bullhead rail to be stressed - do they have a standard for doing this? (I think, but I might be wrong, that NR does not allow its bullhead rail to be stressed and it is always jointed on the National Network).