The Carriage & Wagon Department and P-way teams each have their own blogs.
http://restoringcoachesataviemore.blogspot.co.uk
http://restoringcoachesataviemore.blogspot.co.uk
http://ontrackatstrathspey.blogspot.co.ukA variety of tasks but some progress
BR Mark 2 BFK 17101 has progressed but still throws up surprises
Another compartment has had to have plate work carried out on the window frame.
The small windows have been re-fitted, we have used a compound that is used for sealing car windscreens. This was applied to the frame before the window was offered up and fixed using closed end rivets. The excess was cleaned off when cured and then the rivet heads covered with filler to bring the frame level.....
More Fishplate oiling - Wednesday 21st May
Glad to see the old girl back in service, Fishplate oiling continues a pace, had reached Estate level crossing near 85 1/2 milepost crossing by lunchtime of May 21st. I think the intension is to complete all the plain Mainline of the railway by "summer".
The old water tank site at Boat of Garten is now cleared, with the new tank top right. Gradually the environs around Boat are being tidied up, will try and get a photo of old coaling point by the South Signal Box.....