Some of the detail that was missing from IRP.....
https://assets.publishing.service.gov.u ... ase-2b.pdf
Goosehill junction (flyover) to be reinstated? Newark / Doncaster ECML bypass, or Erewash / Old Road?
The best value Rotherham to Goosehill North Midland option is missing. Choosing this missing option rather than the new M18 HS2 alignment would save an estimated £5bn and deliver a 15-minute interval Leeds - Sheffield service of approximately 30 minutes journey time within 5 years. Combined with the Erewash / Old Road upgrade, Leeds - London would benefit from circa 30-minute saving over today's 2 hr 13 min. Delivery using Project Speed (Okehampton) would bring very quick benefits (to Leeds - Sheffield and associated routes) even without the new Leeds station. Cost would be similar to the Adwick - Hunslet upgrades in the report, and viable unlike the very disruptive proposal that Adwick Junction to Hare Park could be four tracked.
A 1-2 mile tunnel would be required in the Wath area to reinstate the North Midland because of development; this is relatively cheap infrastructure today. North of Cudworth a single line is still in place serving Ardagh Glass, this would assist with the reinstatement of a 2-track formation. The North Midland is a 4-track formation which will make a 100-115mph relatively straightforward and excellent value. BR had plans for 125mph sections before closure. Managing the mining subsidence, which was the excuse for the route closure (Inter-City having to pick up the cost of route was the truth), will be straightforward with modern survey and engineering systems. Yes, Okehampton was 75mph for a Sprinter, but £40m for 14 miles... If we allow £2-3bn for the 20-miles or so from Goosehill to Swinton that's £5bn+ saved over M18 option.
Meets the requirements of Northern Powerhouse Rail too. A quick political win waiting for the right time (for an announcement of a study at least). Watch this space.
https://assets.publishing.service.gov.u ... ase-2b.pdf
Goosehill junction (flyover) to be reinstated? Newark / Doncaster ECML bypass, or Erewash / Old Road?
The best value Rotherham to Goosehill North Midland option is missing. Choosing this missing option rather than the new M18 HS2 alignment would save an estimated £5bn and deliver a 15-minute interval Leeds - Sheffield service of approximately 30 minutes journey time within 5 years. Combined with the Erewash / Old Road upgrade, Leeds - London would benefit from circa 30-minute saving over today's 2 hr 13 min. Delivery using Project Speed (Okehampton) would bring very quick benefits (to Leeds - Sheffield and associated routes) even without the new Leeds station. Cost would be similar to the Adwick - Hunslet upgrades in the report, and viable unlike the very disruptive proposal that Adwick Junction to Hare Park could be four tracked.
A 1-2 mile tunnel would be required in the Wath area to reinstate the North Midland because of development; this is relatively cheap infrastructure today. North of Cudworth a single line is still in place serving Ardagh Glass, this would assist with the reinstatement of a 2-track formation. The North Midland is a 4-track formation which will make a 100-115mph relatively straightforward and excellent value. BR had plans for 125mph sections before closure. Managing the mining subsidence, which was the excuse for the route closure (Inter-City having to pick up the cost of route was the truth), will be straightforward with modern survey and engineering systems. Yes, Okehampton was 75mph for a Sprinter, but £40m for 14 miles... If we allow £2-3bn for the 20-miles or so from Goosehill to Swinton that's £5bn+ saved over M18 option.
Meets the requirements of Northern Powerhouse Rail too. A quick political win waiting for the right time (for an announcement of a study at least). Watch this space.