Stranraer - Ayr line Upgrade

Status
Not open for further replies.

Dartspro123

Member
Joined
16 Jan 2025
Messages
5
Location
Scotland
Apparently there’s £10 million to upgrade the signalling on the Stranraer to ayr line this control period. Any ideas as to what this could look like? Think it currently operates the old electric token machines from dunragit to Girvan and all the boxes in between then tokenless block from Girvan onwards. Do you think that would close them all or would £10 million only fund a small upgrade possible to replace some signals and the old blocks to improve efficiency?

Original link below for reference that mentions the £10 million upgrade.

Network Rail are currently developing plans to improve the railway signalling on the Stranraer-Ayr line. The system is at the end of its working life, both in terms of its condition and many parts are now obsolete.

And funding totalling £10 million has been allocated to carry out this work in the next five years.​

 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Meole

Member
Joined
28 Oct 2018
Messages
735
Be unusual if the boxes survived, the Stranraer station is of course to close and a basic more convenient replacement to be built.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,842
Location
Land of the Prince Bishops
Is £10 million enough to do anything meaningful at all? Surely not enough for any proper resignalling or station moving or anything such like at "railway prices"? It sounds just like a renewal of the token systems or a replacement with some other token system.

Oddly despite living near there a while ago I've never been beyond Girvan on the line and that only once - if they're going to be changing it I may have to get up asap.

Incidentally do they need any added signalling efficiency? Beyond Maybole and certainly Girvan I'm not sure there's exactly enormous demand, although I know there's a thread around on this forum somewhere where some guy valiantly makes the case!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,503
Location
Northampton
Be unusual if the boxes survived, the Stranraer station is of course to close and a basic more convenient replacement to be built.
Is this confirmed?
Is £10 million enough to do anything meaningful at all? Surely not enough for any proper resignalling or station moving or anything such like at "railway prices"? It sounds just like a renewal of the token systems or a replacement with some other token system.
My hunch would be a version of RETB. Gives basically the same capacity as now but in a far simpler format.
Incidentally do they need any added signalling efficiency?
Not really, in all likelihood. There's no freight demand, so it's only the odd test train, weedkiller/RHTT or rail tour that needs to be accommodate about the passenger service.
 