The other day I was travelling from Twickenham to Bristol TM. After we'd just left Reading I was sitting facing backwards on the side facing the up line. We'd been going probably 5 or 10 minutes and I saw a very strange signal. It was like two signals strapped together, the 2nd one seemed to be a bit below and to the left of the main one. The main one was showing green and the other one a single yellow. We were going very fast so I may of been seeing things but can anyone shed any light on this? I didn't know such things existed. Is it some sort of distant because of the high speed on that line?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,670
Splitting distant for a diverging route. Im sure there is one at Tilehurst in the up direction.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Are you sure the signals were for the same line?

It sounds like a standard bracket signal with the top signal being for the up fast line and the lower signal being for the up slow.
 

phil281

Member
Joined
9 Mar 2011
Messages
186
Splitting distant for a diverging route. Im sure there is one at Tilehurst in the up direction.

Thanks! That must have been what I saw. How does it work?
--- old post above --- --- new post below ---
Are you sure the signals were for the same line?

It sounds like a standard bracket signal with the top signal being for the up fast line and the lower signal being for the up slow.

Almost 100%, the second signal looked different from what looked like the main one.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Clive Feather has an excellent explanation of how splitting distants (and other arrangements at junctions) work here.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
Are you sure the signals were for the same line?

It sounds like a standard bracket signal with the top signal being for the up fast line and the lower signal being for the up slow.

Not applicable on western approaches to Reading as the 4 tracks are arranged (left to right looking west) DM-UM-DR-UR. Note main & relief, not fast & slow.
--- old post above --- --- new post below ---
Clive Feather has an excellent explanation of how splitting distants (and other arrangements at junctions) work here.

The splitting distants were introduced to speed up the approach to the improved ladder crossovers between Tilehurst station and Scours Lane as well as the turnout to platform 8 (old 5). As Clive Feather explains, it's not allowed to have overlapping 4 aspect flashing yellow sequences in such cases, so a splitting distant was the only option.
 
Last edited:

phil281

Member
Joined
9 Mar 2011
Messages
186
Clive Feather has an excellent explanation of how splitting distants (and other arrangements at junctions) work here.

Thanks Tomnick, is it only on the GW main line these are in operation? How long have they been around for?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
They're quite an old concept, with plenty of semaphore examples in years gone by. The last one, around Larbert in Scotland, was recently abolished, I believe. Apart from this installation, and possibly one or two others further east on the GWML, I'm not aware of any other 'modern' splitting distants though.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,267
Do the 'arrow type' preliminary route indicators supersede the requirement for splitting distants on new installations?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
My understanding of preliminary route indicators (and a quick look at the design standard, here, supports this - 5.14 on p120) is that they're only intended to provide routing information to reduce operational inconvenience from wrong-routing rather than any form of approach control to ensure that train speeds are reduced appropriately for diverging routes. This might mean a PRI being provided in rear of a splitting ("inner") distant in a four-aspect area, where there's sufficient distance from the latter to enable speed to be reduced for the diverging route but not enough to allow the train to come to a stand at the junction signal if wrong-routed.
 
Status