A tree has fallen onto the overhead wires, damaging them in and around Stowmarket. Does anyone know the scale of repairs this may need at all?
I have also noticed 0E06 Harwich - Peterborough was stuck just behind the situation, it has now turned around and will form a new service under the headcode 0E06 (the same), going from Claydon - Whitemoor Yard. It will go via Stratford, Broxbourne and Cambridge up the GEML and WAML.
== Doublepost prevention - post automatically merged: ==
Ipswich has now become extremely congested, with 2 Norwich services on Plats 3 & 4, various freights trying to get towards London, terminating services trying to get in and ECS trying to get out.
Praises to the team at Colchester and Liverpool St sorting this out.
I have also noticed 0E06 Harwich - Peterborough was stuck just behind the situation, it has now turned around and will form a new service under the headcode 0E06 (the same), going from Claydon - Whitemoor Yard. It will go via Stratford, Broxbourne and Cambridge up the GEML and WAML.
== Doublepost prevention - post automatically merged: ==
Ipswich has now become extremely congested, with 2 Norwich services on Plats 3 & 4, various freights trying to get towards London, terminating services trying to get in and ECS trying to get out.
Praises to the team at Colchester and Liverpool St sorting this out.
Last edited: