30mog

Member
Joined
25 Apr 2013
Messages
189
RailFuture on their website suggest a number of options where an existing heritage railway interchanging with NR nearby could provide journeys integrated with the national timetable. Keighley & Worth Valley among those suggested. Maybe a class 139 on there?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
PLenty of lightly used lines (Barton branch, Doncaster to Lincoln, Burnley to Colne), but these are generally part of services that share tracks with other services, so a 139 really wouldn't be suitable.

There's also the problem of needing two dedicated units to run such a service rather than just needing one 153/Pacer from an existing (larger) pool of trains.

Greenford Shuttle (post Crossrail)?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
RailFuture on their website suggest a number of options where an existing heritage railway interchanging with NR nearby could provide journeys integrated with the national timetable. Keighley & Worth Valley among those suggested. Maybe a class 139 on there?

The KWVR already interchanges with NR at Keighley. They have a Waggon&Maschinbau Railbus though, that'd probably be closer to crashworthiness standards for a run up to Skipton than a 139!
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
I always thought It would be good to have one on the Cornish branches and Swindon-Westbury. Also maybe the Severn Beach, Heart of Wales and Conwy Valley. Any thoughts?

You might get as far as Betws y Coed in a PPM, but I doubt that it'd manage the climb up to Pont y Pant (1 in 47).
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
I always thought It would be good to have one on the Cornish branches and Swindon-Westbury. Also maybe the Severn Beach, Heart of Wales and Conwy Valley. Any thoughts?

You might get as far as Betws y Coed in a PPM, but I doubt that it'd manage the climb up to Pont y Pant (1 in 47).
Well TBH I don't know the line at all. I only know it's a 153(?) every 3 hours so could maybe do with something along the lines of a PPM.

I think the conclusion we are all coming to here is the concept of a PPM would be a fantastic solution to many lines. However the current specifications woul not be suitable and we would need to customise each PPM design to tailor it to the needs of each line.
 

Welshman

Established Member
Joined
11 Mar 2010
Messages
3,068
Well TBH I don't know the line at all. I only know it's a 153(?) every 3 hours so could maybe do with something along the lines of a PPM.

I think the conclusion we are all coming to here is the concept of a PPM would be a fantastic solution to many lines. However the current specifications woul not be suitable and we would need to customise each PPM design to tailor it to the needs of each line.


I not only agree with the point made by krus_aragon re the potential difficulties with the gradients on the Conwy Valley line, but would also add that although the service is only every three hours, the present trains are quite well-loaded.

This is due to the fact that Conwy-issued bus passes for the over 60s are also valid on the line, and also that there has been a concerted effort by the local Conwy Valley Rail Development Group to increase passenger usage in the last few years. Due to their efforts, the 153 originally provided by ATW has now been replaced with a 150, so I'm afraid to move to a 139 would be a retrograde step and undue all the good work.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
Why would you want to de-electrify the line?

Once again, There's no reason a lightweight PPM-type vehicle couldn't be designed to run off the OHLE. Admittedly PPM don't currently offer such a vehicle but the thread is entitled 'Stourbridge solutions elsewhere' and as it's already been assumed by several contributors that for such a solution to work on any of the routes suggested some degree of variation would be needed compared to the existing 139s. On that basis an AC-version would be ideal for Cardiff Bay or Romford-Upminster, with a DC version for Lymington.
 

Unixman

Member
Joined
16 Mar 2012
Messages
167
Re-open Gobowen to Oswestry .. Track is still in-situ... (and the heritage people just can't get the impetus to do it themselves ..)
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
(and the heritage people just can't get the impetus to do it themselves ..)

That's because the branch was until recently still occasionally used by freight to Llanyblodwel quarry. It's officially disused now, but still owned by Network Rail, and it's evidently difficult to get heritage operations over NR metals (see for instance the difficulty Swanage Railway have had trying to extend their services over the disused but still NR-owned freight branch between Norden and Worgret Junction).
 

Unixman

Member
Joined
16 Mar 2012
Messages
167
That's because the branch was until recently still occasionally used by freight to Llanyblodwel quarry. It's officially disused now, but still owned by Network Rail, and it's evidently difficult to get heritage operations over NR metals (see for instance the difficulty Swanage Railway have had trying to extend their services over the disused but still NR-owned freight branch between Norden and Worgret Junction).


Recently was 1986 :D IIRC (and the line is now owned by Shropshire Council)

(Update: 1988 )
 
Last edited:

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
Like I say, I don't know it at all. From what you are saying it seems a lot better loaded than I assumed.

Seems unusual accepting concessionary bus passes. Do they get a lot of money from this scheme?
 

badassunicorn

Member
Joined
8 Jul 2012
Messages
436
I was just about to suggest the Romford Upminsters, seems like a waste of a 321/317/315 to be bombing up and down there all day long, the speed limit is something silly like 30 or something anyways
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
Reopened Alnwick??? branch or a Morpeth or Palmersville - Ashington service
 

09065

Member
Joined
20 Jan 2013
Messages
77
There are or were plans to run a Parry People Mover from Medstead down to Alton, and one as delivered to the Mid Hants for this porpose but broke down shortly after arrival. The last I heard t was goingt to be re-delivered after repair in the Autumn of 2011 butI haven't heard anything about it since. Does anybody know what the current situation is?

I know that one of the problems was the Mid Hants not being able to provide LPG to fuel it and there was at one time a suggestion that it might be converted to diesel.

I asked somebody who does some occasional work at the MHR.

Apparently there was discussion as to who was financially responsible for getting the PPM on a low-loader and repaired after it failed to climb one of the banks in testing.

As I understand it, the independent who were effectively hiring the MHR metals to run the Parry on wanted the MHR to contribute significantly to the cost. MHR who were merely renting out their metals to the company were not happy with the suggestions and things got a bit stagnant.

The service was at the point of actually being advertised to the local public and had to be pulled with a few weeks notice.

That being said though I am surprised that the MHR have not instigated something of their own. If there was interest from a co-operative to do same there must be some money in it.
 

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
I asked somebody who does some occasional work at the MHR.

Apparently there was discussion as to who was financially responsible for getting the PPM on a low-loader and repaired after it failed to climb one of the banks in testing.

As I understand it, the independent who were effectively hiring the MHR metals to run the Parry on wanted the MHR to contribute significantly to the cost. MHR who were merely renting out their metals to the company were not happy with the suggestions and things got a bit stagnant.

The service was at the point of actually being advertised to the local public and had to be pulled with a few weeks notice.

That being said though I am surprised that the MHR have not instigated something of their own. If there was interest from a co-operative to do same there must be some money in it.

Cheers, thanks for that - the trail seemed to suddenly go cold fort no reason around Autumn 2011, 8 or 9 months after the original trial, where it broke down shortly after delivery.

I can understand MHR wanting to keep at arms length in so far as they may not want to commit their own resources, and also they'd no doubt come in for criticism if the venture proved uneconomic and had to be withdrawn.
 

Waddon

Member
Joined
15 Sep 2009
Messages
469
Bourne End to Marlow when the line is electrified, with a normal unit running the rest of the line from Bourne End to Maidenhead on a half-hourly service... increase of frequency and gets around the problem of finding an electric unit which can fit into the Marlow platform at Bourne End
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
Despite recent closures the Blyth and Tyne still has quite a few freight services and may have more in the future.

I was wondering how much the recent Alcan had hit traffic on the route.

I think the frustrating aspect is that Ashington is just possible with the existing Morpeth service running to Ashington.
 
Joined
4 Dec 2011
Messages
597
I wander how suitable these would be on branchlines poised for reopening such as Portishead, as a viable (more economic) alternative to heavy rail? With the right capacity as mentioned above (multiple coaches) I don't see too many barriers.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
I wander how suitable these would be on branchlines poised for reopening such as Portishead, as a viable (more economic) alternative to heavy rail? With the right capacity as mentioned above (multiple coaches) I don't see too many barriers.

I'd have thought Portishead will have too much interworking with freight for a PPM type vehicle. The Bourne End-Marlow suggested earlier wouldn't be a bad idea- could even be an electric one with cleaper trolley-wire once the GW wires go up.
 

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,515
Location
Ely
I'd have thought Portishead will have too much interworking with freight for a PPM type vehicle. The Bourne End-Marlow suggested earlier wouldn't be a bad idea- could even be an electric one with cleaper trolley-wire once the GW wires go up.

Would need to have First Class on it if serving Marlow, or there will be uproar.
 