brad465
Veteran Member
Trains that run between Strood and Charing X have to do a specific shunt to get between platforms 1 and 2. This involves the driver going into the rear cab on P1, reversing the train out towards Cuxton, with a pilot/guard sat in the front cab (presumably relaying with the driver), then once past the shunt signal, just beyond the bridge underneath the Chatham mainline, the driver then drives forward into P2, to either start a London-bound service or run empty to a depot/carriage siding. Alternatively, the stock runs empty to Maidstone West to turn round there (one evening peak diagram exists for this).
I have only ever seen Networker units complete this move, either for peak services, or, as is the case today, when the Medway core is shut. Today Charing X-Gravesend services are extended to Strood and Thameslink services are terminating short at Gravesend. Presumably this means 700s are not permitted to do the aforementioned shunt, even though the single continuous unit setup means they would be ideal for it? 395s however are running to Strood today and appearing to do the same shunt, although they're running as 6-car only so presumably won't need a front cab pilot. 376s and 707s don't run to Strood anyway in passenger service, although that might change for the latter when they get toilets.
I have only ever seen Networker units complete this move, either for peak services, or, as is the case today, when the Medway core is shut. Today Charing X-Gravesend services are extended to Strood and Thameslink services are terminating short at Gravesend. Presumably this means 700s are not permitted to do the aforementioned shunt, even though the single continuous unit setup means they would be ideal for it? 395s however are running to Strood today and appearing to do the same shunt, although they're running as 6-car only so presumably won't need a front cab pilot. 376s and 707s don't run to Strood anyway in passenger service, although that might change for the latter when they get toilets.