• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Stobart rail vs truck

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TGV

Member
Joined
25 Nov 2005
Messages
734
Location
320km/h Voie Libre
1255 off Carlisle, 1 hour plus for a driver change?

I reckon they could do it quicker if they wanted to! To be fair though the trucker got caught right behind an accident that closed the M6 for a short while.

I'm guessing the truck is going to win given the nature of the show?!
 

S19

Member
Joined
5 Apr 2010
Messages
275
Been watching the whole series. Nice insight into the Stobart brand.
 

S19

Member
Joined
5 Apr 2010
Messages
275
It's actually a friend of mine's Brother driving the truck :)
 

transportphoto

Established Member
Associate Staff
Jobs & Careers
Quizmaster
Joined
21 Jan 2010
Messages
5,562
The Truck by about 15 minutes


EDIT: imagination you beat me too it.

EDIT 2: As the train has to unload at Mossend and then detrain the containers onto lorries, the first lorry made it to the Tesco Depot 15ish mins behind the direct lorry.

I aggree S19, I also have been watching the program every week (apart from the two I watched on 5's YouTube channel :)), this is a very interesting insight to the life 'behind the scenes'. Has anyone an idea on how long the series is?
 
Last edited:

Soft Mick

Member
Joined
19 Jul 2010
Messages
37
Stobbart train stops in Carlisle yard for around 2 hours for no apparent reason. It'd be close otherwise...:(
also, train would win by the time the 26th truck rolled into mossend euroterminal
 
Last edited:

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
The Truck by about 15 minutes
More than that, the train left Rugby early, and the lorry left about an hour late, and was then further delayed by an accident on the M6
Had they left at the same time, the lorry would have arrived at least 90 minutes ahead of the train
However, the train had two changes of crew, losing it about 2 hours
The net result (journey time only) was the train arrived ahead by about 30 minutes
Typical though road still wins

Equally, scary, the driver had ONE 45 minute break between Rugby and Livingston
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
There shouldn't be a 'price to pay'. How the heck can a 50mph limited lorry driving in traffic beat a WCML train? The train should have been there hours before the lorry. Why wasn't it?

Was it 'fixed' for the programme?
 

Nevasleep

Member
Joined
3 Oct 2010
Messages
79
They did mention the train getting held up, to allow priority to passenger services.

Only good thing about lorries, are that they provide more jobs than the train :|
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
How the heck can a 50mph limited lorry driving in traffic beat a WCML train? The train should have been there hours before the lorry. Why wasn't it?
The train had two crew changes, each taking about one hour
The train has a maximum speed of 75mph

The HGV had one crew, driving continuously with just one break of 45 minutes
The HGV has a maximum speed of 56mph

4S43 06:25 Rugby - Mossend
Typical times
Preston 09:10
Carlisle 10:25
Mossend 15:00

The traffic on the M74 at the Raith Interchange would certainly match that!
 
Joined
29 Aug 2010
Messages
696
A lorry will often beat a train due to the lorry having one crew member for all of it's journey.
It can collect/deliver door to door.
If there's trouble ahead the driver can easily be notified (by 'phone) divert to another route.
Modern lorries are artificially limited to 56 mph even though their (ABS) braking characteristics are as good as most modern cars.
Where freight trains really score is on shifting bulk loads in and out of purpose built depots.
 

ivanhoe

Member
Joined
15 Jul 2009
Messages
962
However, the train had two changes of crew, losing it about 2 hours
The net result (journey time only) was the train arrived ahead by about 30 minutes

And that is why railfreight is expensive and most of the nations goods are freighted in lorries.
 

TGV

Member
Joined
25 Nov 2005
Messages
734
Location
320km/h Voie Libre
The main problem for me was that it wasn't a proper race. They weren't going to the same place, so it's all open to too many variables. The train got to Mossend before the truck got to Livingstone - so was the race fair?!

Also - watching it, you get the impression that the trucking arm of the business was taking the race very seriously - the driver and controller certainly were, but the rail aspect (DB Schenker), evidently treated it as a normal run - in no hurry to set any records.

So in short, it was massively over dramatised and exaggerated for TV and was essentially meaningless. To make it a true race and representation they should have raced 30 trucks from Rugby to Mossend and let DB Schenker do what they want within regulations to make up time.

However the truck DID and always will win the "point to point" delivery times unless your customer happens to have their own rail yard.

What amuses me is that the whole show looks to dramatise a pretty normal logistics business. Compare to Ice Road Truckers where the drivers there really do risk life and limb to take supplies to remote arctic locations over ice covered mountain passes:

ICE ROAD TRUCKERS:
"Jack is taking a load of 10,000 gallons of highly flammable fuel for 400 miles over the Dalton Highway for the residents of Deadhorse, or they'll lose power. The visibility is near zero, it's dark and he feels the rig slide towards the edge..."

STOBART:
"Mary has a load of cream cakes she must delivery from Rugby to Newbury- a distance of nearly 100 miles. If she fails, the people of Newbury won't have anything to go with afternoon tea tomorrow"
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
See a lot of his tucks in the UKs largest industrial estate here in Wrexham, not a rail line in sight, however I saw a Stobart truck yesterday,on the rear was this banner(below)

Stobart truck, a division of Stobart Road/Rail/Air & sea. Out of interest does he name his trains etc like the trucks with girlie names


M
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
Why on earth would a short train journey like that require any crew changes, let alone two? It's no wonder road has rail beaten in the freight market.

Rail obviously can't do door to door deliveries to lots of addresses, but any freight flow from one fixed point to another (eg from one food warehouse to another distribution point) should easily be cheaper and quicker by train - less fuel used, and only one driver instead of perhaps 60 drivers for the equivalent road load. But road is cheaper....

I'm beginning to see why. :roll:
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,885
Location
UK
ICE ROAD TRUCKERS:
"Jack is taking a load of 10,000 gallons of highly flammable fuel for 400 miles over the Dalton Highway for the residents of Deadhorse, or they'll lose power. The visibility is near zero, it's dark and he feels the rig slide towards the edge..."

STOBART:
"Mary has a load of cream cakes she must delivery from Rugby to Newbury- a distance of nearly 100 miles. If she fails, the people of Newbury won't have anything to go with afternoon tea tomorrow"

:lol:

--- old post above --- --- new post below ---

If you have the depots at each rail point, and lorries can do much, much shorter journeys then that has to be a good thing - so it's not just having the trains.. you need to build the whole chain.

I would have thought that every day that goes by with fuel getting more costly, duty going up on lorries and so on - would make the train more competitive. Anyone smart enough to realise that would begin investing now, even if it may be 5-10 years before it happens.

Well, unless we allow lorries to get even bigger - which does untold damage to our roads (but, they don't pay for that - the tax payer does).
 
Last edited:

GB

Established Member
Joined
16 Nov 2008
Messages
6,558
Location
Somewhere
Why on earth would a short train journey like that require any crew changes, let alone two?

I wouldn't really call it a short journey. We also do not know what the train drivers diagrams were like and what they needed to do prior to the trains departure and arrival.
 
Status
Not open for further replies.

Top