Aictos
Established Member
- Joined
- 28 Apr 2009
- Messages
- 10,403
As there's the above work being carried out in June 2012 along with track renewals, East Coast are running a revised timetable between 2200 Saturday and 1530 Sunday with trains diverted via Cambridge and thus onwards via the Slow lines.
As Stevenage already takes 12 car trains, is this in connection with the IEP programme?
As Stevenage already takes 12 car trains, is this in connection with the IEP programme?