Stations have been rebuilt for almost as long as the railways have existed. For all the debate about the 1960s Euston rebuilding, with the loss of the Euston Arch and Great Hall, it's often forgotten that if it hadn't been for the Second World War it's extremely likely the LMS would have got there 25-30 years earlier albeit with a art deco design. St Pancras station frontage could have gone the same way to provide a modern hotel with engineering suite facilities.
The drivers of rebuilds are usually easily understood.
Also, given the complete rebuild of some stations for West Coast electrification why weren't Rugby and Crewe rebuilt? Both had speed restrictions through them for non-stop trains due to the way supports for canopies/overall roofs were positioned between running lines. Rugby was dealt with by a 2000s remodel and new platform supported canopies but apart from strengthening the supports at Crewe in the 1980s remodelling (which I think increased the speed on the fast lines from 20mph to 40mph?) It was left untouched.
I'm not advocating rebuilds for the sake of them but I am intrigued by what factors come into play historically. I'm also aware of general BR rationalisation, sweeping away redundant buildings that weren't needed, were at risk of vandalism, etc. Or the resiting of stations to free up land resulting in smaller, simpler (in some cases basic) facilities.
(Another historic one is the LSWR rebuild of Waterloo, which was curtailed for the then Windsor Line platforms by the First World War. Would have been fascinating to see a single completely open train shed of 24/25 platforms!)
So any knowledge on the rationale for rebuilds would be great to hear. Or likewise schemes that never happened.
The drivers of rebuilds are usually easily understood.
- Euston and New Street in the 1960s were to allow comprehensive remodelling as part of electrification.
- Stafford was rebuilt for electrification but I am not sure if it was remodelled? I know it used to have some platform structures similar to the main part of Crewe, which would have imposed speed restrictions.
- Bedford was rebuilt in the 1980s to resite the station away from the original site on the truncated original line to Hitchin.
- Peterborough was rebuilt in the 1970s to both expand the station and also support remodelling (the station set-up had been similar to Darlington where trains had to effectively leave the mainline).
Also, given the complete rebuild of some stations for West Coast electrification why weren't Rugby and Crewe rebuilt? Both had speed restrictions through them for non-stop trains due to the way supports for canopies/overall roofs were positioned between running lines. Rugby was dealt with by a 2000s remodel and new platform supported canopies but apart from strengthening the supports at Crewe in the 1980s remodelling (which I think increased the speed on the fast lines from 20mph to 40mph?) It was left untouched.
I'm not advocating rebuilds for the sake of them but I am intrigued by what factors come into play historically. I'm also aware of general BR rationalisation, sweeping away redundant buildings that weren't needed, were at risk of vandalism, etc. Or the resiting of stations to free up land resulting in smaller, simpler (in some cases basic) facilities.
(Another historic one is the LSWR rebuild of Waterloo, which was curtailed for the then Windsor Line platforms by the First World War. Would have been fascinating to see a single completely open train shed of 24/25 platforms!)
So any knowledge on the rationale for rebuilds would be great to hear. Or likewise schemes that never happened.