It is a phrase bandied about and often with the word 'long-winded' or 'costly' preceding it but I'm not entirely sure what this exactly means.

What steps must occur in order to close a station* down?

*Let's assume an example of Humphrey Park as many are just bus stop shelter platforms and also assume there are no listed features which will cloud discussion.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

heart-of-wessex

Established Member
Joined
11 Jun 2005
Messages
3,089
Location
Trowbridge
I'd imagine one long process is the consulation from the locals?

I don't know how mant Pilning residents will want their one Saturday service running!
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
The local consultation takes about 3 months. And any necessary follow up analysis of the consultation will depend on the individual situation (i.e complete closure with no replacement may prompt more objections and a longer follow up than, say, complete closure with a new replacement station).

Others will be able to explain the whole process better (NR assessment, proposal to DfT, DfT consultation, ORR ratification etc), but a current example is Rochester station. Whilst it's not the usual straight closure with no alternative, this might be of interest with regards to the consultation period, as it only started a week or two ago. You get the general idea and layout from the documents.

https://www.gov.uk/government/consultations/rochester-railway-station-closure
The first document is the 25 page consultation document (might be a bit wordy and technical for some towards the end, but you can see how much information is gathered beforehand)
The second is the closure notice, which has pretty much gone up at every station within a 30 mile radius.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
The local consultation takes about 3 months. And any necessary follow up analysis of the consultation will depend on the individual situation (i.e complete closure with no replacement may prompt more objections and a longer follow up than, say, complete closure with a new replacement station).

Others will be able to explain the whole process better (NR assessment, proposal to DfT, DfT consultation, ORR ratification etc), but a current example is Rochester station. Whilst it's not the usual straight closure with no alternative, this might be of interest with regards to the consultation period, as it only started a week or two ago. You get the general idea and layout from the documents.

https://www.gov.uk/government/consultations/rochester-railway-station-closure
The first document is the 25 page consultation document (might be a bit wordy and technical for some towards the end, but you can see how much information is gathered beforehand)
The second is the closure notice, which has pretty much gone up at every station within a 30 mile radius.
I've not read the document yet and this may be explained in it. However with Rochester why don't they run a parliamentary service there rather than close it down?
UPDATE: Read the document and there's no mention of a parliamentary service option.
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,378
Location
Yorkshire
I've not read the document yet and this may be explained in it. However with Rochester why don't they run a parliamentary service there rather than close it down?
UPDATE: Read the document and there's no mention of a parliamentary service option.

The process of closing the current Rochester station is really just a paperwork exercise, as it is being replaced with a bigger and better-located (for the main centre of population) station just a short distance away. The closure of Garston (Merseyside) to be replaced by the low level platforms at Liverpool South Parkway is a better comparison.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
The process of closing the current Rochester station is really just a paperwork exercise, as it is being replaced with a bigger and better-located (for the main centre of population) station just a short distance away. The closure of Garston (Merseyside) to be replaced by the low level platforms at Liverpool South Parkway is a better comparison.
A closure notice can't be free though even if a station is replaced.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,378
Location
Yorkshire
A closure notice can't be free though even if a station is replaced.

Of course not, but when viewed as part of a larger project such as Liverpool South Parkway, it won't be a huge proportion. A closure notice for Garston was worth the costs, one for Teesside Airport or whatever it's called isn't.
 

steamybrian

Established Member
Joined
26 Nov 2010
Messages
2,004
Location
Kent
It was my thought that closure procedure was not necessary if a station being closed was being replaced by another within 400 metres such as Garston/Liverpool South Parkway mentioned above.
It would appear that the existing and new stations at Rochester are 500 metres apart so require formal closure procedures.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
Of course not, but when viewed as part of a larger project such as Liverpool South Parkway, it won't be a huge proportion. A closure notice for Garston was worth the costs, one for Teesside Airport or whatever it's called isn't.
Surely any saving is a saving, even with a large project? I thought these days things had to be done as cheaply as reasonably possible.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
It can cost hundreds of thousands in legal fees to go through the process of closing a station, but only thousands or tens of thousands to operate a parliamentary service. So while the savings might eventually outweigh the benefits it may take ten years or more to do so.

For example the closure of Abercynon North in 2008, Network Rail estimated the station cost just £4.5-9k per year to maintain and £22,000 annually in signalling and track costs to have trains stop there (two services per hour). 130k people per year used the station before it closed and platforms at Abercynon South were reinstated.
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,499
Location
A typical commuter-belt part of north-west England
For example the closure of Abercynon North in 2008, Network Rail estimated the station cost just £4.5-9k per year to maintain and £22,000 annually in signalling and track costs to have trains stop there (two services per hour). 130k people per year used the station before it closed and platforms at Abercynon South were reinstated.

There had been a station on the location named Abercynon South since the early Victorian days, whereas the eventually closed station of Abercynon North only lasted for 20 years, opening in 1988 and closing in 2008.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,352
It does seem silly to start the official procedure to ask if one can close the station next door to the new one, or not, well after construction of the new one has started.

It's also bizarre that we have to go all through this longwinded approach to move the facility just along the line a bit, where the bus service on the adjacent road only has to unbolt their Bus Stop sign and stick it up on a different lamp post - or pull the service completely and nobody can do anything about it.

It can cost hundreds of thousands in legal fees to go through the process of closing a station
I think we all wonder just how the legal profession can justify those fees. What do we actually get for that money. Wouldn't the money be better spent devising and putting into law a better and more efficient approach in the first place.
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,456
Location
Yorks
It does seem silly to start the official procedure to ask if one can close the station next door to the new one, or not, well after construction of the new one has started.

It's also bizarre that we have to go all through this longwinded approach to move the facility just along the line a bit, where the bus service on the adjacent road only has to unbolt their Bus Stop sign and stick it up on a different lamp post - or pull the service completely and nobody can do anything about it.


I think we all wonder just how the legal profession can justify those fees. What do we actually get for that money. Wouldn't the money be better spent devising and putting into law a better and more efficient approach in the first place.

Do we want an efficient closure process though. Better IMO to make it as difficult as possible and put up with the odd parliamentary than to potentially open the floodgates for something much worse.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,755
Easy to get round that, they just run a bus service instead like Norton Bridge etc...
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,321
It would surely be less emotive to have a separately named 're-location procedure' as well as a closure procedure - even if they were nearly identical.
 

AndyNLondon

Member
Joined
20 Jan 2014
Messages
191
In the Rochester example, I think this sentence (on page 16 of the consultation doc) might explain why they don't want to mothball it with a parliamentary service:
A net income of £800,000 from disposal of the existing site, after decommissioning costs, has been included in the appraisal.
A parly might be cheaper that the closure process on its own, but if you chuck the best part of a million quid into the pot from selling off the old station, the balance might change...
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
In the Rochester example, I think this sentence (on page 16 of the consultation doc) might explain why they don't want to mothball it with a parliamentary service:

A parly might be cheaper that the closure process on its own, but if you chuck the best part of a million quid into the pot from selling off the old station, the balance might change...

Not to mention that it's suffering a bit - I believe it's subsiding and you just need to look at some of the platforms to see it would probably need a lot of maintenance going forward.

But, sorry OP, I didn't post it for a discussion about Rochester in particular, only to show an example of all the documents and the information in them which makes it a lengthy process :oops:
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
In the Rochester example, I think this sentence (on page 16 of the consultation doc) might explain why they don't want to mothball it with a parliamentary service:

A parly might be cheaper that the closure process on its own, but if you chuck the best part of a million quid into the pot from selling off the old station, the balance might change...
I didn't spot that. That clearly explains why they wouldn't run a parliamentary service instead.
 

AndyNLondon

Member
Joined
20 Jan 2014
Messages
191
I didn't spot that. That clearly explains why they wouldn't run a parliamentary service instead.
To be fair, I only noticed it because I went looking, having thought "hmm, chunk of land in a city centre, must be worth a bit, do they get to include its value in the analysis?"
 